Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Mechanical permit Date: August 15, 2014 Client: Presbyterian Medical Center Of The University | Permit status: Completed | Permit id: 549591 | |||||
Suppression permit Date: July 31, 2015 Client: Presbyterian Medical Center Of The University | Permit status: Completed | Permit id: 628815 | |||||
Mechanical permit Date: June 10, 2008 Client: Presbyterian Medical Center Of The University | Permit status: Completed | Permit id: 156089 | |||||
Suppression permit Date: March 18, 2011 Client: Presbyterian Medical Center Of The University | Permit status: Completed | Permit id: 324639 | |||||
Suppression permit Date: July 22, 2013 Client: Presbyterian Medical Center Of The University | Permit status: Completed | Permit id: 476945 | |||||
Electrical permit Date: December 14, 2011 Client: Presbyterian Medical Center Of The University | Permit status: Expired | Permit id: 378719 | |||||
Fast form building permit Date: April 2, 2007 Client: Presbyterian Medical Center Of The University | Permit status: Completed | Permit id: 66172 | |||||
Suppression permit Date: November 25, 2008 Client: Presbyterian Medical Center Of The University | Permit status: Expired | Permit id: 182001 | |||||
Electrical permit Date: March 31, 2015 Client: Presbyterian Medical Center Of The University | Permit status: Completed | Permit id: 594382 | |||||
Suppression permit Date: October 15, 2014 Client: Presbyterian Medical Center Of The University | Permit status: Completed | Permit id: 568082 | |||||
Suppression permit Date: March 19, 2007 Client: Presbyterian Medical Center Of The University | Permit status: Completed | Permit id: 59446 | |||||
Suppression permit Date: May 13, 2009 Client: Presbyterian Medical Center Of The University | Permit status: Completed | Permit id: 213806 | |||||
Suppression permit Date: November 15, 2012 Client: Presbyterian Medical Center Of The University | Permit status: Completed | Permit id: 432628 | |||||
Electrical permit Date: November 7, 2014 Client: Presbyterian Medical Center Of The University | Permit status: Completed | Permit id: 567084 | |||||
Operations permit Date: April 16, 2013 Client: Presbyterian Medical Center Of The University | Permit status: Completed | Permit id: 22255 | |||||
Suppression permit Date: November 1, 2010 Client: Presbyterian Medical Center Of The University | Permit status: Completed | Permit id: 303717 | |||||
Fast form building permit Date: May 1, 2008 Client: Presbyterian Medical Center Of The University | Permit status: Completed | Permit id: 149326 | |||||
Demolition permit Date: October 29, 2013 Client: Presbyterian Medical Center Of The University | Permit status: Completed | Permit id: 502162 | |||||
Electrical permit Date: October 15, 2013 Client: Presbyterian Medical Center Of The University | Permit status: Completed | Permit id: 495439 | |||||
Suppression permit Date: January 6, 2016 Client: Presbyterian Medical Center Of The University | Permit status: Completed | Permit id: 652936 | |||||
Fast form building permit Date: April 27, 2009 Client: Presbyterian Medical Center Of The University | Permit status: Completed | Permit id: 212706 | |||||
Plumbing permit Date: March 5, 2012 Client: Presbyterian Medical Center Of The University | Permit status: Completed | Permit id: 387855 | |||||
Suppression permit Date: June 25, 2013 Client: Presbyterian Medical Center Of The University | Permit status: Expired | Permit id: 469387 | |||||
Suppression permit Date: August 3, 2007 Client: Presbyterian Medical Center Of The University | Permit status: Completed | Permit id: 87811 | |||||
Suppression permit Date: June 13, 2008 Client: Presbyterian Medical Center Of The University | Permit status: Completed | Permit id: 150044 | |||||
Suppression permit Date: November 5, 2012 Client: Presbyterian Medical Center Of The University | Permit status: Completed | Permit id: 436149 | |||||
Suppression permit Date: August 28, 2015 Client: Presbyterian Medical Center Of The University | Permit status: Completed | Permit id: 621504 | |||||
Suppression permit Date: May 1, 2009 Client: Presbyterian Medical Center Of The University | Permit status: Completed | Permit id: 203937 | |||||
Suppression permit Date: March 8, 2011 Client: Presbyterian Medical Center Of The University | Permit status: Completed | Permit id: 323430 | |||||
Fast form building permit Date: April 2, 2007 Client: Presbyterian Medical Center Of The University | Permit status: Completed | Permit id: 66172 | |||||
Suppression permit Date: January 23, 2014 Client: Presbyterian Medical Center Of The University | Permit status: Completed | Permit id: 500052 | |||||
Demolition permit Date: October 29, 2013 Client: Presbyterian Medical Center Of The University | Permit status: Completed | Permit id: 502162 | |||||
Fast form building permit Date: April 27, 2009 Client: Presbyterian Medical Center Of The University | Permit status: Completed | Permit id: 212706 | |||||
Mechanical permit Date: June 10, 2008 Client: Presbyterian Medical Center Of The University | Permit status: Completed | Permit id: 156087 | |||||
Suppression permit Date: August 4, 2010 Client: Presbyterian Medical Center Of The University | Permit status: Completed | Permit id: 294603 | |||||
Electrical permit Date: June 17, 2014 Client: Presbyterian Medical Center Of The University | Permit status: Expired | Permit id: 536886 | |||||
Suppression permit Date: January 6, 2016 Client: Presbyterian Medical Center Of The University | Permit status: Completed | Permit id: 652936 | |||||
Plumbing permit Date: March 5, 2012 Client: Presbyterian Medical Center Of The University | Permit status: Completed | Permit id: 387855 | |||||
Electrical permit Date: June 9, 2011 Client: Presbyterian Medical Center Of The University | Permit status: Completed | Permit id: 333502 | |||||
Fast form building permit Date: May 1, 2008 Client: Presbyterian Medical Center Of The University | Permit status: Completed | Permit id: 149326 | |||||
Operations permit Date: April 16, 2013 Client: Presbyterian Medical Center Of The University | Permit status: Completed | Permit id: 22255 | |||||
Mechanical permit Date: August 15, 2014 Client: Presbyterian Medical Center Of The University | Permit status: Completed | Permit id: 549591 | |||||
Electrical permit Date: October 15, 2013 Client: Presbyterian Medical Center Of The University | Permit status: Completed | Permit id: 495439 | |||||
Electrical permit Date: March 31, 2015 Client: Presbyterian Medical Center Of The University | Permit status: Completed | Permit id: 594382 | |||||
SCORE 100 For the installation of an automatic fire suppression system on the 4th floor, interventional radiology - system in accordance with nfpa 13. System includes a 6" backflow prevention assembly. All work per approved plans application. Separate permits required for electrical and plumbing work. Date: April 11, 2014 Contractor: Oliver Sprinkler Co Inc Client: Presbyterian Medical Center Of The University | Permit type: Suppression permit | Permit status: Completed | Completion date: May 18, 2015 | Permit id: 521117 | |||||
SCORE 100 For the extension of an exist. Combined standpipe & automatic sprinkler system w. Exist. Fire pump & backflow prevention (bfp) assemblies for a mixed-use hospital building. Automatic sprinkler system installation in accordance with nfpa 13. All permitted work in accordance with scope approved by the pa dept. Of health dated 10. 16. 13. Date: January 23, 2014 Contractor: Oliver Sprinkler Co Inc Client: Presbyterian Medical Center Of The University | Permit type: Suppression permit | Permit status: Completed | Completion date: July 17, 2014 | Permit id: 500052 | |||||
SCORE 100 Removal of one 25 gallon diesel underground storage tank used for the emergency generator, removal of all piping, samples will be collected and a closure report done according to pa dep regs Date: October 29, 2013 Contractor: Ferrick Const Co Inc Client: Presbyterian Medical Center Of The University | Permit type: Demolition permit | Permit status: Completed | Completion date: May 9, 2014 | Permit id: 502162 | |||||
SCORE 100 Installation of nfpa 13 sprinkler system in portion of existing sprinklered hospital, pa dept of health #: 421101-01. 04 code sprinker design professional: russell henry walters, pe Date: March 14, 2014 Contractor: Oliver Sprinkler Co Inc Client: Presbyterian Medical Center Of The University | Permit type: Suppression permit | Permit status: Completed | Completion date: May 20, 2015 | Permit id: 517754 | |||||
SCORE 100 Install an automatic sprinkler system. Date: December 21, 2007 Contractor: Oliver Sprinkler Co Inc Client: Presbyterian Medical Center Of The University | Permit type: Suppression permit | Permit status: Completed | Completion date: March 19, 2008 | Permit id: 116216 | |||||
SCORE 100 Install an automatic sprinkler system. Date: February 26, 2008 Contractor: Oliver Sprinkler Co Inc Client: Presbyterian Medical Center Of The University | Permit type: Suppression permit | Permit status: Completed | Completion date: July 1, 2009 | Permit id: 128755 | |||||
SCORE 100 Install 26 auto. Sprinklers on the 2nd floor myrin building Date: March 20, 2008 Contractor: Oliver Sprinkler Co Inc Client: Presbyterian Medical Center Of The University | Permit type: Suppression permit | Permit status: Completed | Completion date: May 29, 2008 | Permit id: 136139 | |||||
SCORE 100 Install (82) auto sprinklers on the 2nd flr. Icu of the cupp bldg. Per submitted sealed plans & hyd. Cals. Date: April 3, 2008 Contractor: Oliver Sprinkler Co Inc Client: Presbyterian Medical Center Of The University | Permit type: Suppression permit | Permit status: Completed | Completion date: May 22, 2008 | Permit id: 138566 | |||||
SCORE 100 Fast form building permit Date: May 1, 2008 Contractor: Oliver Sprinkler Co Inc Client: Presbyterian Medical Center Of The University | Permit status: Completed | Completion date: July 24, 2008 | Permit id: 149326 | |||||
SCORE 100 Install (29) auto sprinklers on the 3rd flr. Of wright-saunders bldg. Cardiac cath Date: June 13, 2008 Contractor: Oliver Sprinkler Co Inc Client: Presbyterian Medical Center Of The University | Permit type: Suppression permit | Permit status: Completed | Completion date: August 19, 2008 | Permit id: 150044 | |||||
SCORE 100 Install (9) auto sprinklers on the 2nd flr. Of #12 cupp building Date: August 15, 2008 Contractor: Oliver Sprinkler Co Inc Client: Presbyterian Medical Center Of The University | Permit type: Suppression permit | Permit status: Completed | Completion date: October 29, 2008 | Permit id: 168561 | |||||
SCORE 100 Installation of a fire suppression system as per nfpa 13 with existing fire pump & backflow prevention (bfp) assemblies for the 3rd, 4th & penthouse floors as per plans. Date: April 30, 2014 Contractor: Oliver Sprinkler Co Inc Client: Presbyterian Medical Center Of The University | Permit type: Suppression permit | Permit status: Completed | Completion date: January 7, 2016 | Permit id: 522079 | |||||
SCORE 100 For the installation of fire suppression systems to interconnect with existing system in accordance with nfpa 2007, standard 13 as per approved plans. Date: June 12, 2014 Contractor: Oliver Sprinkler Co Inc Client: Presbyterian Medical Center Of The University | Permit type: Suppression permit | Permit status: Completed | Completion date: October 3, 2015 | Permit id: 527943 | |||||
SCORE 100 New strobe & horn strobe as per nec 2008 (health care) Date: June 17, 2014 Contractor: Marano Michael Client: Presbyterian Medical Center Of The University | Permit type: Electrical permit | Permit status: Expired | Completion date: June 17, 2014 | Permit id: 536886 | |||||
SCORE 88 Add conduit for fiber cable per 2008 nec (cell site) Date: June 24, 2014 Contractor: All Circuits Electrical Contr Client: Presbyterian Medical Center Of The University | Permit type: Electrical permit | Permit status: Expired | Completion date: June 24, 2014 | Permit id: 545090 | |||||
SCORE 100 Installation of exhaust system within on-call suite in fourth floor; work to include new exhaust fan, associated ductwork and louver at exterior wall; re-balance existing supply diffusers per plans in accordance with approval from pennsylvania dept. Of health. Separate permit required for any electrical work. Asbestos removal abatement required prior to the commencement of work Date: August 15, 2014 Contractor: Elliott Lewis Corporation Client: Presbyterian Medical Center Of The University | Permit type: Mechanical permit | Permit status: Completed | Completion date: April 21, 2015 | Permit id: 549591 | |||||
SCORE 100 Em power upgrade add 2 new fire alarm devices from demo devices per 2008 nec & nfpa 72(health care facility) Date: August 12, 2014 Contractor: Marano Michael Client: Presbyterian Medical Center Of The University | Permit type: Electrical permit | Permit status: Completed | Completion date: May 6, 2015 | Permit id: 550855 | |||||
SCORE 100 Relocation of existing outlet, demo of existing equipment & 1-new ckt for heat pump as per nec 2008 (health care facility) Date: September 9, 2014 Contractor: Marano Michael Client: Presbyterian Medical Center Of The University | Permit type: Electrical permit | Permit status: Completed | Completion date: December 10, 2014 | Permit id: 555161 | |||||
SCORE 100 New outlet and lights per 2008 nec & nfpa 72 (health care facility),no fire alarm of this permit Date: November 7, 2014 Contractor: Marano Michael Client: Presbyterian Medical Center Of The University | Permit type: Electrical permit | Permit status: Completed | Completion date: April 28, 2015 | Permit id: 567084 | |||||
SCORE 100 Install (305) auto sprinklers in the wright-saunders south basement Date: August 22, 2008 Contractor: Oliver Sprinkler Co Inc Client: Presbyterian Medical Center Of The University | Permit type: Suppression permit | Permit status: Completed | Completion date: July 1, 2009 | Permit id: 171532 | |||||
SCORE 100 Installation of sprinkler system, as per plans and calcs Date: December 23, 2008 Contractor: Oliver Sprinkler Co Inc Client: Presbyterian Medical Center Of The University | Permit type: Suppression permit | Permit status: Completed | Completion date: February 9, 2009 | Permit id: 188770 | |||||
SCORE 100 Install auto sprinkler in basement as per plan. Date: November 25, 2008 Contractor: Oliver Sprinkler Co Inc Client: Presbyterian Medical Center Of The University | Permit type: Suppression permit | Permit status: Expired | Completion date: May 1, 2016 | Permit id: 182001 | |||||
SCORE 100 Install (12) auto sprinklers on the 3rd flr. Wright saunders cardiac cath lab #2, as per plan and calcs, with final approval inspection by pa doh. Date: January 16, 2009 Contractor: Oliver Sprinkler Co Inc Client: Presbyterian Medical Center Of The University | Permit type: Suppression permit | Permit status: Completed | Completion date: February 27, 2009 | Permit id: 191056 | |||||
SCORE 100 Install (23) auto sprinklers on 1st flr. Lobby of wright saunders bldg. Date: May 1, 2009 Contractor: Oliver Sprinkler Co Inc Client: Presbyterian Medical Center Of The University | Permit type: Suppression permit | Permit status: Completed | Completion date: June 10, 2010 | Permit id: 203937 | |||||
SCORE 100 Fast form building permit Date: April 27, 2009 Contractor: Oliver Sprinkler Co Inc Client: Presbyterian Medical Center Of The University | Permit status: Completed | Completion date: September 21, 2009 | Permit id: 212706 | |||||
SCORE 100 Install a pre-action fire suppression system as per plans Date: April 7, 2009 Contractor: Kistler Obrien Fire Client: Presbyterian Medical Center Of The University | Permit type: Suppression permit | Permit status: Completed | Completion date: January 6, 2010 | Permit id: 205038 | |||||
SCORE 100 Install 16 auto fire sprinklers in cupp building on the 2nd floor waiting rm and corridor as per plan. Date: May 13, 2009 Contractor: Oliver Sprinkler Co Inc Client: Presbyterian Medical Center Of The University | Permit type: Suppression permit | Permit status: Completed | Completion date: June 24, 2010 | Permit id: 213806 | |||||
SCORE 100 Install 17 auto fire sprinklers in cupp building on the 2nd floor or#15 as per plan and submitted calcs Date: June 12, 2009 Contractor: Oliver Sprinkler Co Inc Client: Presbyterian Medical Center Of The University | Permit type: Suppression permit | Permit status: Completed | Completion date: July 22, 2009 | Permit id: 213809 | |||||
SCORE 100 Relocate sprinklers in the wright saunders 5th floor-pathology labs Date: October 15, 2014 Contractor: Oliver Sprinkler Co Inc Client: Presbyterian Medical Center Of The University | Permit type: Suppression permit | Permit status: Completed | Completion date: February 3, 2015 | Permit id: 568077 | |||||
SCORE 100 Installation of (39) sprinkler on 5th floor of parking lot. Date: November 22, 2011 Contractor: Oliver Sprinkler Co Inc Client: Presbyterian Medical Center Of The University | Permit type: Suppression permit | Permit status: Completed | Completion date: April 12, 2012 | Permit id: 369322 | |||||
SCORE 100 Install automatic sprinklers on the 2nd floor cupp bldg. Date: July 2, 2007 Contractor: Oliver Sprinkler Co Inc Client: Presbyterian Medical Center Of The University | Permit type: Suppression permit | Permit status: Completed | Completion date: June 12, 2008 | Permit id: 72890 | |||||
SCORE 100 For alterations to an existing fire suppression system in conformance with nfpa 2007, standard 13 to include new sprinkler heads and associated piping. Date: February 8, 2017 Contractor: Oliver Sprinkler Co Inc Client: Presbyterian Medical Center Of The University | Permit type: Suppression permit | Permit status: Completed | Completion date: June 30, 2017 | Permit id: 748130 | |||||
SCORE 100 For the alterations to an existing fire suppression system in accordance with nfpa 2007, standard 13 with an existing supply pump. Date: May 3, 2017 Contractor: Oliver Sprinkler Co Inc Client: Presbyterian Medical Center Of The University | Permit type: Suppression permit | Permit status: Completed | Completion date: November 16, 2017 | Permit id: 748131 | |||||
SCORE 100 Convert two dry standpipes to automatic wet standpipes. Date: July 2, 2007 Contractor: Oliver Sprinkler Co Inc Client: Presbyterian Medical Center Of The University | Permit type: Suppression permit | Permit status: Completed | Completion date: April 23, 2008 | Permit id: 75507 | |||||
SCORE 100 Install new fire pump to serve wright saunders, scheie and 39 buildings. Date: July 2, 2007 Contractor: Oliver Sprinkler Co Inc Client: Presbyterian Medical Center Of The University | Permit type: Suppression permit | Permit status: Completed | Completion date: July 1, 2009 | Permit id: 77321 | |||||
SCORE 99 New path from existing handhole to at&t for new fiber cable as per 2008 nec (west district) Date: December 14, 2011 Contractor: Skinner And Cook Inc Client: Presbyterian Medical Center Of The University | Permit type: Electrical permit | Permit status: Expired | Completion date: December 14, 2011 | Permit id: 378719 | |||||
SCORE 100 Installation of new mains, lines and (121) sprinklers on third floor of the cupp building of presbyterian hospital as per plans; connect to existing system (nfpa 13). Date: February 7, 2012 Contractor: Oliver Sprinkler Co Inc Client: Presbyterian Medical Center Of The University | Permit type: Suppression permit | Permit status: Completed | Completion date: November 21, 2014 | Permit id: 381104 | |||||
SCORE 100 Installation of new mains, lines and (24) sprinklers on third floor of the wright saunders building of presbyterian hospital as per plans; connect to existing system (nfpa 13). Date: February 7, 2012 Contractor: Oliver Sprinkler Co Inc Client: Presbyterian Medical Center Of The University | Permit type: Suppression permit | Permit status: Completed | Completion date: April 29, 2013 | Permit id: 381109 | |||||
SCORE 100 Replace fixtures with no additoinal piping(health care facility) Date: March 5, 2012 Contractor: River Mechanical Inc Client: Presbyterian Medical Center Of The University | Permit type: Plumbing permit | Permit status: Completed | Completion date: September 29, 2012 | Permit id: 387855 | |||||
SCORE 100 Install new main and sprinkler heads on the 1st floor as per nfpa 13 for phases 2-5 as per plans. Date: November 5, 2012 Contractor: Oliver Sprinkler Co Inc Client: Presbyterian Medical Center Of The University | Permit type: Suppression permit | Permit status: Completed | Completion date: October 31, 2013 | Permit id: 428528 | |||||
SCORE 100 Installing mains, lines and (133) sprinklers on the 6th & 7th floor of parking lot. Date: November 15, 2012 Contractor: Oliver Sprinkler Co Inc Client: Presbyterian Medical Center Of The University | Permit type: Suppression permit | Permit status: Completed | Completion date: December 24, 2013 | Permit id: 432628 | |||||
SCORE 100 Relocation of 17 sprinklers on the 1st floor of presbyterian hospital scheie building Date: November 5, 2012 Contractor: Oliver Sprinkler Co Inc Client: Presbyterian Medical Center Of The University | Permit type: Suppression permit | Permit status: Completed | Completion date: April 16, 2013 | Permit id: 436149 | |||||
SCORE 100 Installing mains, lines and (302) sprinklers on first floor in accordance with nfpa 13 as per plans. Date: February 28, 2013 Contractor: Oliver Sprinkler Co Inc Client: Presbyterian Medical Center Of The University | Permit type: Suppression permit | Permit status: Expired | Completion date: October 28, 2013 | Permit id: 441375 | |||||
SCORE 100 Installation of new mains, lines and (32) sprinklers at hospital. Date: June 12, 2013 Contractor: Oliver Sprinkler Co Inc Client: Presbyterian Medical Center Of The University | Permit type: Suppression permit | Permit status: Completed | Completion date: January 13, 2014 | Permit id: 469375 | |||||
SCORE 100 Install automatic sprinklers. Date: July 20, 2007 Contractor: Oliver Sprinkler Co Inc Client: Presbyterian Medical Center Of The University | Permit type: Suppression permit | Permit status: Completed | Completion date: March 27, 2008 | Permit id: 83994 | |||||
SCORE 100 Install new fire pump in boiler room Date: August 3, 2007 Contractor: Oliver Sprinkler Co Inc Client: Presbyterian Medical Center Of The University | Permit type: Suppression permit | Permit status: Completed | Completion date: May 2, 2008 | Permit id: 87811 | |||||
SCORE 100 Install auto sprinkler in the wright saunder bldg. Date: July 17, 2007 Contractor: Oliver Sprinkler Co Inc Client: Presbyterian Medical Center Of The University | Permit type: Suppression permit | Permit status: Completed | Completion date: June 23, 2008 | Permit id: 85164 | |||||
SCORE 100 Install (68) auto sprinklers on the 1st flr. Cupp bldg. Lobby Date: August 3, 2007 Contractor: Oliver Sprinkler Co Inc Client: Presbyterian Medical Center Of The University | Permit type: Suppression permit | Permit status: Completed | Completion date: August 7, 2008 | Permit id: 87812 | |||||
SCORE 100 Install (16) auto sprinklers on 3rd flr. Date: August 24, 2007 Contractor: Oliver Sprinkler Co Inc Client: Presbyterian Medical Center Of The University | Permit type: Suppression permit | Permit status: Completed | Completion date: September 24, 2007 | Permit id: 93948 | |||||
SCORE 100 Installation of new fire suppression system in accordance with nfpa 2007, standard 13, in the cupp building, 3rd floor (south) as part of hospital. Asbestos abatement shall be completed prior to initiation of work under the permit scope. Date: June 25, 2013 Contractor: Oliver Sprinkler Co Inc Client: Presbyterian Medical Center Of The University | Permit type: Suppression permit | Permit status: Expired | Completion date: July 15, 2014 | Permit id: 469387 | |||||
SCORE 100 For the installation of a fire suppression system located at the loading dock, with dry valves and dry pipe systems installed in conformance with nfpa 2007, standard 13. With 6-in diameter service line connection. Date: July 22, 2013 Contractor: Oliver Sprinkler Co Inc Client: Presbyterian Medical Center Of The University | Permit type: Suppression permit | Permit status: Completed | Completion date: July 29, 2013 | Permit id: 476945 | |||||
SCORE 100 Installation of (31) sprinklers in accordance with nfpa 13 and associated piping (phase 3) within the 4th floor and tie into existing system as per plans. Backflow and fire pump existing. Date: September 9, 2013 Contractor: Oliver Sprinkler Co Inc Client: Presbyterian Medical Center Of The University | Permit type: Suppression permit | Permit status: Completed | Completion date: October 3, 2014 | Permit id: 492057 | |||||
SCORE 100 Provide & install cat6 plenum cable on the 1st fl. Install 48 cat6 plenum cables on the 5th floor all cabling will be installed in j hooks and all penetractions will be fire stopped per 2008 nec (health care facility) Date: October 15, 2013 Contractor: Lanconnect Inc Client: Presbyterian Medical Center Of The University | Permit type: Electrical permit | Permit status: Completed | Completion date: March 26, 2014 | Permit id: 495439 | |||||
SCORE 100 Relocate 2 sprinklers in the schele bldg 1st floor entry Date: October 15, 2014 Contractor: Oliver Sprinkler Co Inc Client: Presbyterian Medical Center Of The University | Permit type: Suppression permit | Permit status: Completed | Completion date: February 11, 2015 | Permit id: 568082 | |||||
SCORE 100 For the relocation of 2 1 2 sprinkler main and installing relocating (32) sprinklers in wright saunders 4th floor on call for phase i. Code design professional: russell henry walters, pe Date: December 12, 2014 Contractor: Oliver Sprinkler Co Inc Client: Presbyterian Medical Center Of The University | Permit type: Suppression permit | Permit status: Completed | Completion date: February 3, 2015 | Permit id: 568349 | |||||
SCORE 100 For the installation of an nfpa 13 fire supression system on the sixth floor level of an existing health facility with an existing fire service line and existing backflow preventer assembly. All work to be done per approved plans. If field conditions vary contact design engineer prior to the start of any work. Separate permits required for all other work. Date: January 20, 2015 Contractor: Oliver Sprinkler Co Inc Client: Presbyterian Medical Center Of The University | Permit type: Suppression permit | Permit status: Completed | Completion date: February 3, 2015 | Permit id: 576672 | |||||
SCORE 100 Remove existing devices,install new a c equipment,new lighting and horn strobe relocation per plans per 2008 nec & nfpa 72 (health care) Date: December 30, 2014 Contractor: Marano Michael Client: Presbyterian Medical Center Of The University | Permit type: Electrical permit | Permit status: Completed | Completion date: May 6, 2015 | Permit id: 576861 | |||||
SCORE 100 Change existing outlets & wire to h. G., grade all ckts existing, supply & install 4-local nurses call lights as per nec 2008 (hospital) Date: March 31, 2015 Contractor: Marano Michael Client: Presbyterian Medical Center Of The University | Permit type: Electrical permit | Permit status: Completed | Completion date: November 2, 2015 | Permit id: 594382 | |||||
SCORE 100 Relocate two sprinklers in the penn presbyterian 5th floor on call room of the wright saunders blgd Date: March 6, 2015 Contractor: Oliver Sprinkler Co Inc Client: Presbyterian Medical Center Of The University | Permit type: Suppression permit | Permit status: Completed | Completion date: June 14, 2015 | Permit id: 594389 | |||||
SCORE 100 Install automatic sprinkler system in basement Date: July 10, 2009 Contractor: Oliver Sprinkler Co Inc Client: Presbyterian Medical Center Of The University | Permit type: Suppression permit | Permit status: Completed | Completion date: August 13, 2009 | Permit id: 220763 | |||||
SCORE 100 Erect (30x40)assembly tent for penn presbyterian medical center 04 18 2013 Date: April 16, 2013 Contractor: Anthony Rental And Sales Inc Client: Presbyterian Medical Center Of The University | Permit type: Operations permit | Permit status: Completed | Permit id: 22255 | |||||
SCORE 100 Install (11) auto sprinklers in the cath lab 3 on the 3rd flr. Of wright saunders building as per plans. Existing backflow and pump. Date: July 10, 2009 Contractor: Oliver Sprinkler Co Inc Client: Presbyterian Medical Center Of The University | Permit type: Suppression permit | Permit status: Completed | Completion date: September 14, 2009 | Permit id: 222991 | |||||
SCORE 100 Install fire sprinkler system throughout the administration area on the first floor as per plans and in accordance with nfpa 13. Existing backflow prevention system and fire pump. Date: December 28, 2009 Contractor: Oliver Sprinkler Co Inc Client: Presbyterian Medical Center Of The University | Permit type: Suppression permit | Permit status: Completed | Completion date: February 1, 2010 | Permit id: 247215 | |||||
SCORE 100 Installation of an automatic sprinkler system Date: April 29, 2010 Contractor: Oliver Sprinkler Co Inc Client: Presbyterian Medical Center Of The University | Permit type: Suppression permit | Permit status: Completed | Completion date: March 28, 2011 | Permit id: 270130 | |||||
SCORE 100 Relocate (90) sprinklers in basement of cupp building. Date: August 4, 2010 Contractor: Oliver Sprinkler Co Inc Client: Presbyterian Medical Center Of The University | Permit type: Suppression permit | Permit status: Completed | Completion date: June 1, 2011 | Permit id: 294603 | |||||
SCORE 100 Relocate 4 sprinklers in the penn presbyterian 6th floor on call room of the wright saunders bldg. Date: March 6, 2015 Contractor: Oliver Sprinkler Co Inc Client: Presbyterian Medical Center Of The University | Permit type: Suppression permit | Permit status: Completed | Completion date: October 15, 2015 | Permit id: 594391 | |||||
SCORE 100 Install (21) auto sprinklers on 2nd fl. On the wright saujders-gi bronchio endo Date: March 19, 2007 Contractor: Oliver Sprinkler Co Inc Client: Presbyterian Medical Center Of The University | Permit type: Suppression permit | Permit status: Completed | Completion date: May 7, 2008 | Permit id: 59446 | |||||
SCORE 100 For the installation of new sprinkler heads to connect to an existing fire suppression system in accordance with nfpa 2007, standard 13. Date: August 28, 2015 Contractor: Oliver Sprinkler Co Inc Client: Presbyterian Medical Center Of The University | Permit type: Suppression permit | Permit status: Completed | Completion date: May 1, 2016 | Permit id: 621504 | |||||
SCORE 100 We will be relocating (15) sprinklers in the 2nd floor waiting areas in the cupp building at prebyterian hospital Date: July 31, 2015 Contractor: Oliver Sprinkler Co Inc Client: Presbyterian Medical Center Of The University | Permit type: Suppression permit | Permit status: Completed | Completion date: January 7, 2016 | Permit id: 628815 | |||||
SCORE 100 Interconnect standpipe in cupp bldg. Date: April 13, 2007 Contractor: Oliver Sprinkler Co Inc Client: Presbyterian Medical Center Of The University | Permit type: Suppression permit | Permit status: Expired | Completion date: October 15, 2007 | Permit id: 64086 | |||||
SCORE 100 Installing (22) sprinklers in the 1st floor mob pharmacy area of hospital. Date: December 16, 2015 Contractor: Oliver Sprinkler Co Inc Client: Presbyterian Medical Center Of The University | Permit type: Suppression permit | Permit status: Completed | Completion date: June 13, 2016 | Permit id: 651806 | |||||
SCORE 100 For alterations to an existing fire suppression system in conformance with nfpa 2007, standard 13 to include new sprinkler heads and associated piping. Date: January 6, 2016 Contractor: Oliver Sprinkler Co Inc Client: Presbyterian Medical Center Of The University | Permit type: Suppression permit | Permit status: Completed | Completion date: August 9, 2016 | Permit id: 652936 | |||||
SCORE 100 Fast form building permit Date: April 2, 2007 Contractor: Oliver Sprinkler Co Inc Client: Presbyterian Medical Center Of The University | Permit status: Completed | Completion date: September 12, 2007 | Permit id: 66172 | |||||
SCORE 100 Install 153 sprinklers in the presbyterian hospital cupp building on the 2nd flr. As per plans, to existing system. Date: November 1, 2010 Contractor: Oliver Sprinkler Co Inc Client: Presbyterian Medical Center Of The University | Permit type: Suppression permit | Permit status: Completed | Completion date: June 1, 2011 | Permit id: 303717 | |||||
SCORE 100 Install 22 sprinklers in interventional radiology. Date: March 8, 2011 Contractor: Oliver Sprinkler Co Inc Client: Presbyterian Medical Center Of The University | Permit type: Suppression permit | Permit status: Completed | Completion date: June 13, 2011 | Permit id: 323430 | |||||
SCORE 100 Install (182) sprinklers as per plans and calcs, 4th floor, connect to existing system. Date: March 18, 2011 Contractor: Oliver Sprinkler Co Inc Client: Presbyterian Medical Center Of The University | Permit type: Suppression permit | Permit status: Completed | Completion date: June 9, 2014 | Permit id: 324639 | |||||
SCORE 100 Relocating (4) sprinklers for parking lot Date: March 23, 2011 Contractor: Oliver Sprinkler Co Inc Client: Presbyterian Medical Center Of The University | Permit type: Suppression permit | Permit status: Completed | Completion date: October 16, 2011 | Permit id: 331381 | |||||
SCORE 88 Demo of existing lighting,fire alarm and speakers and replace with new,installation of additional outlets and feeds for hand dryer as per 2008 nec,nfpa-72 Date: June 9, 2011 Contractor: Donn Kirk Client: Presbyterian Medical Center Of The University | Permit type: Electrical permit | Permit status: Completed | Completion date: July 27, 2011 | Permit id: 333502 | |||||
SCORE 99 New path from existing hand hole to at@t site as per 2008 nec Date: May 24, 2011 Contractor: Skinner And Cook Inc Client: Presbyterian Medical Center Of The University | Permit type: Electrical permit | Permit status: Expired | Completion date: May 24, 2011 | Permit id: 342767 | |||||
SCORE 100 Installation of 306 sprinklers on the 5th floor of the cupp building of presbyterian hospital as per plans connect to extg system. Date: August 2, 2011 Contractor: Oliver Sprinkler Co Inc Client: Presbyterian Medical Center Of The University | Permit type: Suppression permit | Permit status: Completed | Completion date: June 1, 2012 | Permit id: 351308 | |||||
SCORE 100 Existing sprinker system : raising (2) sprinkler mains and relocating (28) sprinklers in basement Date: November 1, 2011 Contractor: Oliver Sprinkler Co Inc Client: Presbyterian Medical Center Of The University | Permit type: Suppression permit | Permit status: Completed | Completion date: December 14, 2012 | Permit id: 366724 | |||||
SCORE 100 Relocating (20) sprinklers in building of parking lot. Date: October 11, 2011 Contractor: Oliver Sprinkler Co Inc Client: Presbyterian Medical Center Of The University | Permit type: Suppression permit | Permit status: Completed | Completion date: December 14, 2012 | Permit id: 367905 | |||||
SCORE 100 Replace 6" supply to the existing fire pump and backflow Date: October 19, 2007 Contractor: Oliver Sprinkler Co Inc Client: Presbyterian Medical Center Of The University | Permit type: Suppression permit | Permit status: Completed | Completion date: February 11, 2008 | Permit id: 100172 | |||||
SCORE 100 Standpipe renovations to include new standpipe. Date: October 26, 2007 Contractor: Oliver Sprinkler Co Inc Client: Presbyterian Medical Center Of The University | Permit type: Suppression permit | Permit status: Completed | Completion date: April 23, 2008 | Permit id: 103295 | |||||
SCORE 100 Convert one standpipe to manual wet standpipe. Date: November 30, 2007 Contractor: Oliver Sprinkler Co Inc Client: Presbyterian Medical Center Of The University | Permit type: Suppression permit | Permit status: Completed | Completion date: April 23, 2008 | Permit id: 110344 |