Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Dccr proposes to drill one geotechnical boring (pragi-60) located in the eastbound lane of benton st nw, north of the listed property (38 benton st nw). The boring will be 12 inches diameter and feet bgs, drilled by vacuum excavation methods. A monitoring well will be installed in the boring. All drilling generated waste will be drummed (solids and liquids), tested and shipped offsite for disposal. In the event the well is not completed within 1 day, the well shall be covered protected from surface water drainage, and the vertical migration of contaminants and other materials through the well casing and well annulus. A locking well cap will be installed and the rig parked over the excavation to prohibit vandalism. If no monitoring well is installed, the boring will be abandoned following ddoe requirements. No drilling spoils or excavated soils will be used as backfill. The monitoring well or well abandonment will be completed the same day. See idw management plan and attached schematic Date: September 29, 2015 Client: Dc Water | Permit type: Excavation; monitoring well (single) | Permit status: Permit expired | Expiration date: March 31, 2016 | Permit id: Pa116856 | |||||
SCORE 56 Moving truck Date: November 21, 2011 Contractor: Kirsi Myntti Permit status: Expired | Expiration date: November 23, 2011 | Permit id: Pa10044389 | |||||
SCORE 100 Dccr proposes to drill one geotechnical boring (pragi-60) located in the eastbound lane of benton st nw, north of the listed property (38 benton st nw). The boring will be 12 inches diameter and feet bgs, drilled by vacuum excavation methods. A monitoring well will be installed in the boring. All drilling generated waste will be drummed (solids and liquids), tested and shipped offsite for disposal. In the event the well is not completed within 1 day, the well shall be covered protected from surface water drainage, and the vertical migration of contaminants and other materials through the well casing and well annulus. A locking well cap will be installed and the rig parked over the excavation to prohibit vandalism. If no monitoring well is installed, the boring will be abandoned following ddoe requirements. No drilling spoils or excavated soils will be used as backfill. The monitoring well or well abandonment will be completed the same day. See idw management plan and attached schematic Date: September 29, 2015 Contractor: E2cr Inc Client: Dc Water | Permit type: Excavation; monitoring well (single) | Permit status: Permit expired | Expiration date: March 31, 2016 | Permit id: Pa116856 | |||||
SCORE 100 Moving truck Date: June 29, 2015 Contractor: Olympia Moving Permit status: Permit expired | Expiration date: July 2, 2015 | Permit id: Pa10197335 | |||||
SCORE 99 Construction staging area Date: October 22, 2015 Contractor: E2cr C O Siva Balu Permit status: Permit expired | Expiration date: December 5, 2015 | Permit id: Pa10215773 | |||||
SCORE 59 Moving truck Date: June 29, 2016 Contractor: Mary Pierce Permit status: Permit expired | Expiration date: July 8, 2016 | Permit id: Pa10312683 |