Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 88 New concrete pad for nitrogen tank with enclosure and bollards. Add new 3 4" copper lines for nitrogen. U&o for change in ownership applied for on 12 4 13 (u&o sent 7 11 14) Permit status: Permit issued | Permit id: 13000-02099 | |||||
SCORE 100 Tenant improvement includes demise ground floor space for with existing tenant "southwall technologies" and create future tenant space. Associated electrical, mechancial and plumbing. Tenant to occupy partial ground floor and 2nd floor. Permit status: Permit issued | Permit id: 14000-00500 | |||||
SCORE 88 Interior wall demo and replacement for new piece of equipment approx 6 sq ft Permit status: Permit issued | Permit id: 14000-00074 | |||||
SCORE 88 Eastman chemicals: ti to quality control lab (room contains no hazardous materials and no sinks) 15 sf Permit status: Permit issued | Permit id: 16000-01786 | |||||
SCORE 88 Ti for existing tenant "eastman chemical". Scope of work includes demo of non-load bearing walls and construction on new non-load bearing wall with door to create new conference room 500sf on second floor Permit status: Permit issued | Permit id: 16000-01053 |