Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
62 sq ft ti for existing office building for royale energy, as follows 114 sq ft of removed and 266 sq ft added to create 15 new offices, 6 cubby holes and 2 conferences rooms. Misc electrical and misc mechanical for re route of ducting. Date: February 13, 2014 Value: $58,685 Permit type: Building : 43 - com | Permit status: Permit finaled | Completion date: July 23, 2014 | Permit id: Pds2014-Comalt- | |||||
T. I to convert (e) 62 sqft bank/office to bevmo (retail store), work to include remove/replace 6 lf interior partitions to create recvd/stockroom, storage room, and remodel bathroom for ada, replace plumbing fixtures in bathrooms and break room, ceiling work, install drinking water fountains, install caseworks and counters, relocate electrical meter panel, rewiring and replace/add light fixtures, replace furring and install non-bearing wall, replace doors w/ 13 sqft sliding door. Misc epm Date: July 29, 2016 Value: $186,220 Permit type: Commercial alteration-addn | Permit status: Open | Permit id: Pds2016-Comalt- | |||||
SCORE 96 5 signs for bev-mo as follows 2 monument (reface only existing signs) and 3 wall signs internally illuminated led do not issue this permit until pds2016-comalt-000407 (tenant improvement) is issued Permit type: Commercial alteration-addn | Permit status: Open | Permit id: Pds2016-Comalt- | |||||
SCORE 72 62 sq ft ti for existing office building for royale energy, as follows 114 sq ft of removed and 266 sq ft added to create 15 new offices, 6 cubby holes and 2 conferences rooms. Misc electrical and misc mechanical for re route of ducting. Permit type: Commercial alteration-addn | Permit status: Completed | Completion date: July 23, 2014 | Permit id: Pds2014-Comalt- | |||||
SCORE 88 Signs for bevmo, work includes installing (3) illuminated channel letter wall signs and reface of (2) existing monument signs (internally illuminated) this permit will replace pds2016-comalt-000457 - ti for bevmo is under pds2016-comalt-000407- Permit type: Addn | Permit status: Issued | Permit id: Pds2017-Comalt- | |||||
SCORE 59 Bora - 62 sf re-roof for bevmo if a re-roof project is proposed, the following specifications apply. Existing roofing material built up roofing to remain proposed roofing material sika plan fastened energy smart roof membrane feltback w additional separation layer manufacturer sika brand and model sika plan color (if cool roof required) bright white built-up roofing assembly system number per attached listing report (if applicable) specific exemption from cool roof requirements (if applicable) required building inspector field verification (if applicable) sika plan roof membrane requires separation layer if installed over (e) roofing. Contractor indicates insulation foam as the separation layer. Note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Permit type: Addn | Permit status: Completed | Completion date: March 9, 2017 | Permit id: Pds2017-Comalt- | |||||
SCORE 68 T. I to convert (e) 62 sqft bank office to bevmo (retail store), work to include remove replace 6 lf interior partitions to create recvd stockroom, storage room, and remodel bathroom for ada, replace plumbing fixtures in bathrooms and break room, ceiling work, install drinking water fountains, install caseworks and counters, relocate electrical meter panel, rewiring and replace add light fixtures, replace furring and install non-bearing wall, replace doors w 13 sqft sliding door. Misc epm 1 31 2017 plan change. Light fixtures. See c of a... Ss Permit type: Commercial alteration-addn | Permit status: Completed | Completion date: March 17, 2017 | Permit id: Pds2016-Comalt- | |||||
- excavation permit Date: February 28, 2014 Permit status: Closed | Completion date: May 28, 2014 | Permit id: Dpw2014-Rwexcp- | |||||
Lath/drywall - interior Date: January 12, 2017 Permit status: Pass | Permit id: Pds2016-Comalt- | |||||
Rough plumbing Date: December 28, 2016 Permit status: Pass | Permit id: Pds2016-Comalt- | |||||
Final Date: July 22, 2014 Permit status: Pass | Permit id: Pds2014-Comalt- | |||||
Final Date: July 12, 2007 Permit status: Pass | Permit id: Pds2007-1019-20 | |||||
Rough electric Date: December 29, 2006 Permit status: Pass | Permit id: Pds2006-1019-20 |