Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Alteration permit Date: July 18, 2013 Client: Popostein Limited Liabili | Permit status: Completed | Permit id: 470876 | |||||
Mechanical permit Date: April 30, 2013 Client: Popostein Limited Liabili | Permit status: Completed | Permit id: 468208 | |||||
Electrical permit Date: February 25, 2013 Client: Popostein Limited Liabili | Permit status: Completed | Permit id: 449345 | |||||
Demolition permit Date: November 29, 2012 Client: Popostein Limited Liabili | Permit status: Completed | Permit id: 440279 | |||||
Use permit Date: October 3, 2012 Client: Popostein Limited Liabili | Permit status: Completed | Permit id: 430801 | |||||
Plumbing permit Date: February 8, 2013 Client: Popostein Limited Liabili | Permit status: Completed | Permit id: 452637 | |||||
Alteration permit Date: September 25, 2012 Client: Popostein Limited Liabili | Permit status: Completed | Permit id: 426705 | |||||
Demolition permit Date: November 29, 2012 Client: Popostein Limited Liabili | Permit status: Completed | Permit id: 440279 | |||||
Alteration permit Date: January 8, 2013 Client: Popostein Limited Liabili | Permit status: Completed | Permit id: 416670 | |||||
Alteration permit Date: September 25, 2012 Client: Popostein Limited Liabili | Permit status: Completed | Permit id: 426705 | |||||
Mechanical permit Date: April 30, 2013 Client: Popostein Limited Liabili | Permit status: Completed | Permit id: 468208 | |||||
Plumbing permit Date: February 8, 2013 Client: Popostein Limited Liabili | Permit status: Completed | Permit id: 452637 | |||||
Electrical permit Date: February 25, 2013 Client: Popostein Limited Liabili | Permit status: Completed | Permit id: 449345 | |||||
Use permit Date: October 3, 2012 Client: Popostein Limited Liabili | Permit status: Completed | Permit id: 430801 | |||||
SCORE 96 Permit to install 4 new, gas fired, warm air furnaces and related ductwork for 4 separate independent systems. All equipment for each system must be located entirely within the unit which it serves. No penetration of any fire rated assemblies allowed under this permit. Date: April 30, 2013 Contractor: Sgro Albert Jr Client: Popostein Limited Liabili | Permit type: Mechanical permit | Permit status: Completed | Completion date: May 13, 2013 | Permit id: 468208 | |||||
SCORE 99 Exterior repairs and alterations : replace repair soffits and fascia boards at second floor roof in kind, repair replace damaged sheathing and rafter tails as needed in kind. Remove existing brick chimney to roof line and patch in roofing in kind Date: July 18, 2013 Contractor: Mainline Craftsmen Inc Client: Popostein Limited Liabili | Permit type: Alteration permit | Permit status: Completed | Completion date: November 5, 2013 | Permit id: 470876 | |||||
Int alt. Partitions walls and int bearing walls. New finishes including drywall ceiling in office. Office space with new ceiling framing to extend into warehouse space. Demo old toilet rooms and create new toilet room. Replace windows and doors within existing masonry openings. Repoint ext brickwork as required. New ext canopy and lighting. Parge basement walls and epoxy basement floor. Secure basement stair if salvageable as per plans and aab variance #508266. Separate use registration and certificate of occupany permits required for the second floor. Date: January 8, 2013 Client: Popostein Limited Liabili | Permit type: Alteration permit | Permit status: Completed | Completion date: May 13, 2013 | Permit id: 416670 | |||||
From vacant to office warehouse on ground floor, 2nd floor professional office, demolish existing awning on exterior and install new awning over existing stair at from of building Date: October 3, 2012 Client: Popostein Limited Liabili | Permit type: Use permit | Permit status: Completed | Completion date: October 3, 2012 | Permit id: 430801 | |||||
SCORE 100 Remove 4 water closets and 4 lav install handicapped toilet room (1 wc and 1 lav) replace existing sink Date: February 8, 2013 Contractor: Albert J Sgro Mechanical Inc Client: Popostein Limited Liabili | Permit type: Plumbing permit | Permit status: Completed | Completion date: May 13, 2013 | Permit id: 452637 | |||||
SCORE 99 Install 35 receptacles 25 switches lighting fixtures 3 a c disconnects 300amp service upgrade 5 smoke co detectors emergency & exit lighting intercom & data port per 2008 nec (commercial) Date: February 25, 2013 Contractor: Ferranina Electrical Contracti Client: Popostein Limited Liabili | Permit type: Electrical permit | Permit status: Completed | Completion date: July 18, 2013 | Permit id: 449345 | |||||
SCORE 99 Interior demolition of non load bearing walls and ceiling only. No other work allowed under this permit. Contact streets department for dumpster permit and footway closure Date: November 29, 2012 Contractor: Mainline Craftsmen Inc Client: Popostein Limited Liabili | Permit type: Demolition permit | Permit status: Completed | Completion date: May 13, 2013 | Permit id: 440279 | |||||
Construction of retaining wall (flowable fill slope) at rear with associated site work. Special inspections reports to be furnished to field inspector. Date: September 25, 2012 Client: Popostein Limited Liabili | Permit type: Alteration permit | Permit status: Completed | Completion date: August 10, 2013 | Permit id: 426705 |