Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Dccr proposes to drill one geotechnical boring (pragi-62) located in the north parking lane south of 3745 w st nw. The boring will be 12 inches diameter and feet bgs, drilled by vacuum excavation methods. A monitoring well will be installed in the boring. All drilling generated waste will be drummed (solids and liquids), tested and shipped offsite for disposal. In the event the well is not completed within 1 day, the well shall be covered protected from surface water drainage, and the vertical migration of contaminants and other materials through the well casing and well annulus. A locking well cap will be installed and the rig parked over the excavation to prohibit vandalism. If no monitoring well is installed, the boring will be abandoned following ddoe requirements. No drilling spoils or excavated soils will be used at backfill. The monitoring well or well abandonment will be completed the same day. See idw management plan and attached schematics for additional information. The work Date: October 22, 2015 Client: Dc Water | Permit type: Excavation; monitoring well (single) | Permit status: Permit expired | Expiration date: March 31, 2016 | Permit id: Pa117986 | |||||
SCORE 56 Moving storage container Date: November 11, 2012 Contractor: William Cowart Permit status: Expired | Expiration date: November 15, 2012 | Permit id: Pa10078716 | |||||
SCORE 100 Dccr proposes to drill one geotechnical boring (pragi-62) located in the north parking lane south of 3745 w st nw. The boring will be 12 inches diameter and feet bgs, drilled by vacuum excavation methods. A monitoring well will be installed in the boring. All drilling generated waste will be drummed (solids and liquids), tested and shipped offsite for disposal. In the event the well is not completed within 1 day, the well shall be covered protected from surface water drainage, and the vertical migration of contaminants and other materials through the well casing and well annulus. A locking well cap will be installed and the rig parked over the excavation to prohibit vandalism. If no monitoring well is installed, the boring will be abandoned following ddoe requirements. No drilling spoils or excavated soils will be used at backfill. The monitoring well or well abandonment will be completed the same day. See idw management plan and attached schematics for additional information. The work Date: October 22, 2015 Contractor: E2cr Inc Client: Dc Water | Permit type: Excavation; monitoring well (single) | Permit status: Permit expired | Expiration date: March 31, 2016 | Permit id: Pa117986 | |||||
SCORE 99 Construction staging area Date: November 11, 2015 Contractor: E2cr C O Siva Balu Permit status: Permit expired | Expiration date: December 12, 2015 | Permit id: Pa10218865 |