Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
![]() Permit id: 06-01-115 | Parcel: 001110001000 | |||||
![]() Permit id: 12-06-007 | Parcel: 072231008000 | |||||
![]() Permit id: 13-04-084 | Parcel: 072231008000 | |||||
SCORE 89 Install 1" water meter; new sfd, bridgeway lakes 2 phase 1. Temporary water paid for six months from issuance date. ![]() ![]() Permit id: 06-0084 | |||||
SCORE 100 1. Pool- access is limited to site driveway. 2. A pre-inspection is required! All work shall comply with city standards and details 3. Contractor shall use appropriate stormwater bmps to avoid any stormwater contamination or tracking of soil into the street. 4. Final engineering encroachment inspection is required prior to building permit final inspection. 5. Any damage to the curb, gutter, sidewalk or landscape will be repaired prior to finalization of encroachment permit and deposit refu ![]() ![]() Permit id: 13-0148 | Parcel: 072231008000 |