Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 Dr corey-rtu 3 ton Date: November 3, 2014 Contractor: James Abraham Permit type: Commercial air conditioning air distribution systems | Permit status: Issued | Permit id: Mec-14-08690 | |||||
SCORE 95 Replace electrical to new rooftop unit. Date: November 3, 2014 Contractor: Michael Nielsen Permit type: Commercial electrical | Permit status: Issued | Permit id: Elc-14-10394 | |||||
SCORE 86 Installing new steel panels directly over existing, no insulation will be removed, install mastic strip, fasteners and commercial pipe boots. Install commercial wall flashing up to 12" around hvac curb and at top knee wall. Permit type: Commercial re-roof | Permit status: Issued | Permit id: Bld-13-12851 | |||||
Bldg #31-facia remodel Date: May 26, 2006 Value: $50,000 Permit status: Issued | Permit id: Bld-06-21127 | |||||
SCORE 93 Install new sign on front of building Date: April 4, 2012 Contractor: Steven Fritz Permit type: Commercial electrical | Permit status: Issued | Permit id: Elc-12-02640 | |||||
SCORE 93 Commercial plumbing Date: April 24, 2012 Contractor: Gary Chizek Permit status: Issued | Permit id: Plb-12-02428 | |||||
SCORE 100 Relocate customers existing walk-in freezer to their new location. 2. 5 horse power, outdoor condensing unit with matching evaporator coil. Date: April 2, 2012 Contractor: Kylon Rolles Permit type: Regrigeration/walk-in coolers and freezers | Permit status: Issued | Permit id: Mec-12-02258 |