Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Installation of emergency generator to an existing cell tower site. It is a single free standing intergral tank, single phase 80kw, 2 amp, 3 gallon diesel generator on a concrete precase slab. No construction, slab with generator is placed inside the fenced compound at grade. It will be directly into the existing 2 amp service. Date: November 8, 2013 Client: American Towers | Applicant: Bukunas | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1401520 | |||||
Electrical Date: November 15, 2013 Applicant: Eduardo L. Lopez | Permit status: Completed | Permit id: E1401371 | |||||
Revision to b1411894 to eliminating the proposed ramp on 3rd floor and changing the material of the exterior ramp from metal to wood. Date: December 19, 2014 Client: Peter Lloyd | Applicant: Skip Coburn | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1502768 | |||||
Interior and exterior alterations and repairs for aƓretail restaurant with 75 seats and occupants on the first floor including a retail bar/cocktail lounge with 2 occupants standinng and bar on the second floor; and 335 occupants standing and bar on the third floor. The use shall include a retail catering establishment with 15 occupants on the 1st floor.?? The use will include a new elevator penthouse, a new rood deck over an existing structure and new roof mounted mechanical equipment. Date: November 13, 2014 Client: Kozero | Applicant: Miller | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1411894 | |||||
Type of elevator : one (1) hydro/steel/ inside /passenger Date: December 5, 2014 Client: Cathedral Commons Partners Llc | Applicant: Thyssenkrupp Elevator Corp | Permit type: Elevator - new | Permit status: Permit issued | Permit id: En1500594 | |||||
Electrical Date: September 16, 2014 Applicant: Ralph Threatt | Permit status: Permit issued | Permit id: E1409100 | |||||
SCORE 96 Electrical Date: November 15, 2013 Contractor: Eduardo L. Lopez Permit status: Completed | Permit id: E1401371 | |||||
SCORE 100 Electrical Date: September 16, 2014 Contractor: Ralph Threatt Permit status: Permit issued | Permit id: E1409100 | |||||
SCORE 86 Mechanical Date: September 16, 2014 Contractor: Andrew P Carayiannis Permit status: Permit issued | Permit id: M1403252 | |||||
Plumbing and gas Date: September 16, 2014 Permit status: Permit issued | Permit id: P1408633 | |||||
Plumbing and gas Date: February 6, 2015 Client: Dc Eagle Development Llc | Permit status: Permit issued | Permit id: P1503286 | |||||
SCORE 100 Electrical Date: January 27, 2016 Contractor: Ralph Threatt Client: Dc Eagle Development Llc | Permit status: Completed | Permit id: E1603217 | |||||
SCORE 96 Electrical Date: May 17, 2016 Contractor: Ralph E. Jackson Client: Dc Eagle Development Llc | Permit status: Permit issued | Permit id: E1606497 | |||||
SCORE 93 Electrical Date: September 2, 2016 Contractor: Tracy A. Snyder Client: Dc Eagle Development Llc | Permit status: Permit issued | Permit id: E1609739 | |||||
SCORE 96 Electrical Date: November 15, 2013 Contractor: Eduardo L. Lopez Permit status: Completed | Permit id: E1401371 | |||||
SCORE 100 Electrical Date: September 16, 2014 Contractor: Ralph Threatt Permit status: Completed | Permit id: E1409100 | |||||
SCORE 86 Mechanical Date: September 16, 2014 Contractor: Andrew P Carayiannis Permit status: Completed | Permit id: M1403252 | |||||
Plumbing and gas Date: September 16, 2014 Permit status: Permit issued | Permit id: P1408633 | |||||
SCORE 100 Electrical Date: January 27, 2016 Contractor: Ralph Threatt Client: Dc Eagle Development Llc | Permit status: Completed | Permit id: E1603217 | |||||
SCORE 96 Electrical Date: May 17, 2016 Contractor: Ralph E. Jackson Client: Dc Eagle Development Llc | Permit status: Completed | Permit id: E1606497 | |||||
SCORE 86 Mechanical Date: September 16, 2014 Contractor: Andrew P Carayiannis Permit status: Completed | Permit id: M1403252 | |||||
SCORE 100 Plumbing and gas Date: September 16, 2014 Contractor: Jerone Scott Permit status: Permit issued | Permit id: P1408633 | |||||
SCORE 56 Installation of emergency generator to an existing cell tower site. It is a single free standing intergral tank, single phase 80kw, 2 amp, 3 gallon diesel generator on a concrete precase slab. No construction, slab with generator is placed inside the fenced compound at grade. It will be directly into the existing 2 amp service. Date: November 8, 2013 Contractor: Bukunas Client: American Towers | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1401520 | |||||
SCORE 96 Revision to b1411894 to eliminating the proposed ramp on 3rd floor and changing the material of the exterior ramp from metal to wood. Date: December 19, 2014 Contractor: Skip Coburn Client: Peter Lloyd | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1502768 | |||||
SCORE 96 Electrical Date: November 15, 2013 Contractor: Eduardo L. Lopez Permit status: Completed | Permit id: E1401371 | |||||
SCORE 100 Electrical Date: September 16, 2014 Contractor: Ralph Threatt Permit status: Completed | Permit id: E1409100 | |||||
SCORE 100 Plumbing and gas Date: September 16, 2014 Contractor: Jerone Scott Permit status: Permit issued | Permit id: P1408633 | |||||
SCORE 86 Mechanical Date: September 16, 2014 Contractor: Andrew P Carayiannis Permit status: Completed | Permit id: M1403252 | |||||
SCORE 80 At&t will remove and replace 3 antennas and install related support equipment at this existing monopole telecom site. Date: August 24, 2015 Contractor: Jessica Bingham Permit type: Miscellaneous | Permit status: Completed | Permit id: An1500209 | |||||
Plumbing and gas Date: February 6, 2015 Client: Dc Eagle Development Llc | Permit status: Completed | Permit id: P1503286 | |||||
SCORE 56 Installation of 56 solar pv panels on the roof. Date: August 18, 2016 Client: Ted Clements | Permit type: Solar system | Permit status: Permit issued | Permit id: Sol1600696 | |||||
SCORE 59 Remove 3 antennas and install 3 new antennas with an upgrade to related ancillary equipment and cables as per plans Date: December 19, 2016 Contractor: Dc Eagle Development Llc Client: Dc Eagle Development Llc | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: An1600233 | |||||
SCORE 93 Electrical Date: September 2, 2016 Contractor: Tracy A. Snyder Client: Dc Eagle Development Llc | Permit status: Permit issued | Permit id: E1609739 | |||||
SCORE 100 Electrical Date: January 27, 2016 Contractor: Ralph Threatt Client: Dc Eagle Development Llc | Permit status: Completed | Permit id: E1603217 | |||||
SCORE 96 Electrical Date: May 17, 2016 Contractor: Ralph E. Jackson Client: Dc Eagle Development Llc | Permit status: Completed | Permit id: E1606497 | |||||
SCORE 97 Interior and exterior alterations and repairs for aretail restaurant with 75 seats and occupants on the first floor including a retail bar/cocktail lounge with 2 occupants standinng and bar on the second floor; and 335 occupants standing and bar on the third floor. The use shall include a retail catering establishment with 15 occupants on the 1st floor. The use will include a new elevator penthouse, a new rood deck over an existing structure and new roof mounted mechanical equipment. Date: November 13, 2014 Contractor: Miller Client: Kozero | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1411894 | |||||
SCORE 95 Type of elevator : one (1) hydro/steel/ inside /passenger Date: December 5, 2014 Contractor: Thyssenkrupp Elevator Corp Client: Cathedral Commons Partners Llc | Permit type: Elevator - new | Permit status: Permit issued | Permit id: En1500594 | |||||
SCORE 59 Revision to b1411894 and b1502768 to remove restaurant, bar/cocktail lounge and catering establishment on the first floor. The first floor shall be storage accessory to second and third floor approved uses as bar / cocktail lounge Date: April 25, 2016 Contractor: Dc Eagle Development Llc Client: Dc Eagle Development, Llc | Permit type: Addition alteration repair | Permit status: Permit issued | Permit id: B1607148 | |||||
SCORE 56 Revision to b1411894 and b1502768 to remove restaurant, bar cocktail lounge and catering establishment on the first floor. The first floor shall be storage accessory to second and third floor approved uses as bar cocktail lounge Date: April 25, 2016 Contractor: Dc Eagle Development, Llc Client: Dc Eagle Development, Llc | Permit type: Addition alteration repair | Permit status: Permit issued | Permit id: B1607148 |