Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Hvac change out - fau or wall heater - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: June 13, 2016 Permit type: Residential alteration-addn | Permit status: Issued | Permit id: Pds2016-Resalt- | |||||
SCORE 96 Hvac change out - fau or wall heater - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: June 13, 2016 Contractor: Jerrys Heating And Air Conditioning Inc Permit type: Residential alteration-addn | Permit status: Issued | Permit id: Pds2016-Resalt- | |||||
SCORE 93 Re-roof (bora) for (10) condo buildings in avocado village. See pds2017-cmaspc-000056 for all clearances #8 8 sf (3692 avocado village ct) if a re-roof project is proposed, the following specifications apply. Existing roofing material bur proposed roofing material tpo manufacturer gaf brand and model everguard mil color (if cool roof required) tan built-up roofing assembly system number per attached listing report (if applicable) n a specific exemption from cool roof requirements (if applicable) steep or low sloped w no ducts in attic required building inspector field verification (if applicable) n a Permit type: Addn | Permit status: Issued | Permit id: Pds2017-Comalt- | |||||
SCORE 96 Hvac change out - fau or wall heater - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: June 13, 2016 Contractor: Jerrys Heating And Air Conditioning Inc Permit type: Mechanical - hvac change out | Permit status: Issued | Permit id: Pds2016-Resalt- |