Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 Replace (e) steel canopy for fuel island (e) columns to remain. Engineer: Alberto De La Merced | Engineer Phone: (626) 458-2578 | Applicant: Eduardo Ruvalcaba | Applicant Phone: (323) 257-7460 | Permit id: 1406120050 | |||||
SCORE 95 Replace wash bay with new wash bay - new steel structure Applicant: Mike Ferrin | Applicant Phone: (213) 210-6541 | Permit id: 1309190079 | |||||
SCORE 95 Remove existing meter service panel board. Install new concr ete pad for diesel fuel standby generatorautomatic transfer switch 200amp panel boardreceptacles conduit wires & associated hardware Engineer: Alberto De La Merced | Engineer Phone: (626) 458-2578 | Applicant: Alberto De La Merced | Applicant Phone: (626) 458-2578 | Permit id: 1402200003 | |||||
SCORE 86 Re-roof: tear off existing roof of 800 sqft of main office & install gaf timberline asphalt shingle roof astm: d3462 Engineer: Design Division | Engineer Phone: (626) 458-7887 | Applicant: Mike Ferring | Applicant Phone: (213) 252-9506 | Permit id: 1308130073 | |||||
SCORE 86 Re-roof:tear off existing roof of 2800 sqft of crew room & install gaf timberline asphalt shingle roof astm: d3462 Engineer: Design Division | Engineer Phone: (626) 458-7887 | Applicant: Mike Ferring | Applicant Phone: (213) 252-9506 | Permit id: 1308130075 |