Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Plumbing permit Date: October 25, 2010 Client: Zion Baptist Church Of Phila | Permit status: Completed | Permit id: 308121 | |||||
Plumbing permit Date: July 1, 2008 Client: Zion Baptist Church Of Phila | Permit status: Completed | Permit id: 161602 | |||||
Alteration permit Date: May 3, 2007 Client: Zion Baptist Church Of Phila | Permit status: Completed | Permit id: 26874 | |||||
Plumbing permit Date: July 1, 2008 Client: Zion Baptist Church Of Phila | Permit status: Completed | Permit id: 161602 | |||||
Alteration permit Date: May 3, 2007 Client: Zion Baptist Church Of Phila | Permit status: Completed | Permit id: 26874 | |||||
Plumbing permit Date: October 25, 2010 Client: Zion Baptist Church Of Phila | Permit status: Completed | Permit id: 308121 | |||||
SCORE 100 Replacing 1" distribution water line Date: October 25, 2010 Contractor: Ingrams Drain And Sewer Cleaning Client: Zion Baptist Church Of Phila | Permit type: Plumbing permit | Permit status: Completed | Completion date: June 20, 2015 | Permit id: 308121 | |||||
SCORE 88 Make safe permit - to comply case #502646 point and caulk the interior of the existing bell tower on the annex building of zion baptist church. Please contact the building inspector at least 24 hours prior to the start of work. Provide manufacturers installation instructions for the epoxy to the building inspector and a written report from the contractor describing the work alredy installed. To comply case #604556 to patch cracks to archways around 1st floor doorways and to epoxy seal the capstone at the top of the tower. Engineer must provide a final written report detailing the completion of the work and the final condition of the building in all areas that were made safe. No other work on this permit. Contractor has no employees per notarized letter. Date: November 20, 2017 Contractor: Lalace Llc Client: Zion Baptist Church Of Phila | Permit type: Alteration permit | Permit status: Active | Completion date: November 30, 2017 | Permit id: 829874 | |||||
SCORE 100 Install safewaste-floor sink to existing piping, food prep sink, floor drain replaced, garbage disposal Date: July 1, 2008 Contractor: Hakim Abdul Rasheed Client: Zion Baptist Church Of Phila | Permit type: Plumbing permit | Permit status: Completed | Completion date: June 6, 2015 | Permit id: 161602 | |||||
Renovate existing kitchen in the existing church only. Date: May 3, 2007 Client: Zion Baptist Church Of Phila | Permit type: Alteration permit | Permit status: Completed | Completion date: November 4, 2008 | Permit id: 26874 |