SCORE 95 Manhole access 11 days Contractor: Pepco Holdings Inc Permit status: Notpaid | Expiration date: September 30, 2013 | Permit id: 0 | |||||
SCORE 95 Manhole access 11 days Contractor: Pepco Holdings Inc Permit status: Notpaid | Expiration date: October 19, 2013 | Permit id: 0 | |||||
SCORE 95 Manhole access 11 days Contractor: Pepco Holdings Inc Permit status: Not paid | Expiration date: September 30, 2013 | Permit id: 0 | |||||
SCORE 95 Manhole access 11 days Contractor: Pepco Holdings Inc Permit status: Not paid | Expiration date: October 19, 2013 | Permit id: 0 | |||||
SCORE 86 One 6-inch diameter soil test boring will be drilled using continuous flight hollow stem augers. The boring will extend to a maximum depth of 15 feet below current site grades using a truck-mounted drill rig. The samples will be containerized for geotechnical classification and laboratory testing. After boring completion, the borehole will be grouted with bentonite slurry (2 lbs of bentonite to 1 gallon of water) and the auger cuttings and all other investigation derived waste (idw) will be containerized in sealed drums. Where necessary, pavement will be patched with quick set high strength concrete. Date: July 31, 2017 Contractor: Dmy Engineering Consultants Inc Permit type: Excavation; boring test pit (single), excavation; boring test pit (each addl) | Permit status: Assigned | Expiration date: September 12, 2017 | Permit id: 0 | |||||
SCORE 86 Excavation; boring test pit (single), excavation; boring test pit (each addl) Contractor: Dmy Engineering Consultants Inc Permit status: 12 | Expiration date: September 12, 2017 | Permit id: 0 | |||||
SCORE 95 Manhole access 11 days Contractor: Pepco Holdings Inc Permit status: Notpaid | Expiration date: October 19, 2013 | Permit id: 0 | |||||
SCORE 95 Manhole access 11 days Contractor: Pepco Holdings Inc Permit status: Notpaid | Expiration date: September 30, 2013 | Permit id: 0 | |||||
SCORE 86 Construction staging area Contractor: Dmy Engineering Consultants Inc Permit status: Assigned | Expiration date: February 8, 2018 | Permit id: 0 | |||||
SCORE 86 One 6-inch diameter soil test boring will be drilled using continuous flight hollow stem augers. The boring will extend to a maximum depth of 15 feet below current site grades using a truck-mounted drill rig. The samples will be containerized for geotechnical classification and laboratory testing. After boring completion, the borehole will be grouted with bentonite slurry (2 lbs of bentonite to 1 gallon of water) and the auger cuttings and all other investigation derived waste (idw) will be containerized in sealed drums. Where necessary, pavement will be patched with quick set high strength concrete. Contractor: Dmy Engineering Consultants Inc Permit status: Assigned | Expiration date: September 12, 2017 | Permit id: 0 | |||||
SCORE 95 Manhole access 11 days Contractor: Pepco Holdings Inc Permit status: Not paid | Expiration date: September 30, 2013 | Permit id: 0 | |||||
SCORE 64 Tv & film Date: October 22, 2013 Contractor: Table Of Content Permit status: Permit expired | Expiration date: October 23, 2013 | Permit id: Pa10119078 | |||||
SCORE 95 Manhole access 11 days Contractor: Pepco Holdings Inc Permit status: Not paid | Expiration date: October 19, 2013 | Permit id: 0 | |||||
SCORE 86 Construction staging area Contractor: Dmy Engineering Consultants Inc Permit status: Assigned | Expiration date: February 8, 2018 | Permit id: 0 |