Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 59 Construct trash rack in existing overflow inlet from thorton creek to meadowbrook pond for seattle public utilities per plan. Date: June 22, 2012 Value: $20,000 Applicant: Stevens, Greg | Permit type: Construction | Permit status: Permit closed | Current use: Commercial | Permit id: 6320066 | |||||
SCORE 95 Deconstruct classroom 1, classroom 2 and lavatory buildings per plot plan subject to field inspection (stfi). Date: December 9, 2011 Contractor: City Of Sea Spu Drain And Waste Applicant: Valmonte, Arnel | Permit type: Demolition | Permit status: Permit issued | Current use: Commercial | Permit id: 6304749 | |||||
SCORE 95 Deconstruction and salvage existing greenhouse at meadowbrook pond subject to field inspection (stfi). Date: November 18, 2010 Contractor: City Of Sea Spu Drain And Waste Applicant: Banslaben, Joel | Permit type: Demolition | Permit status: Permit closed | Current use: Commercial | Permit id: 6266400 | |||||
During winter of 2013, approximately 15 linear feet the thornton creek bank near the meadowbrook pond facility sloughed into the creek (see attached photo and location map). The bank appears to be fill material consisting mostly of compacted soil and rock. Spu plans to remove this sloughed material and install rip rap slope protection with more stable materials (see attached plan and section) . Applicant: Stevens, Greg | Permit type: Construction | Permit status: Initial information colle | Current use: Institutional | Permit id: 6363676 | |||||
Construct trash rack in existing overflow inlet from thorton creek to meadowbrook pond for seattle public utilities per plan. Date: June 22, 2012 Value: $20,000 Applicant: Stevens, Greg | Permit type: Construction | Permit status: Permit closed | Current use: Commercial | Permit id: 6320066 | |||||
During winter of 2013, approximately 15 linear feet the thornton creek bank near the meadowbrook pond facility sloughed into the creek (see attached photo and location map). The bank appears to be fill material consisting mostly of compacted soil and rock. Spu plans to remove this sloughed material and install rip rap slope protection with more stable materials (see attached plan and section) . Applicant: Stevens, Greg | Permit type: Construction | Permit status: Initial information colle | Current use: Institutional | Permit id: 6363676 | |||||
SCORE 59 Construct trash rack in existing overflow inlet from thorton creek to meadowbrook pond for seattle public utilities per plan. Date: December 4, 2012 Value: $20,000 Applicant: Stevens, Greg | Permit type: Construction | Permit status: Permit closed | Completion date: February 27, 2015 | Expiration date: December 4, 2015 | Current use: Commercial | Permit id: 6320066 | |||||
During winter of 2013, approximately 15 linear feet the thornton creek bank near the meadowbrook pond facility sloughed into the creek (see attached photo and location map). The bank appears to be fill material consisting mostly of compacted soil and rock. Spu plans to remove this sloughed material and install rip rap slope protection with more stable materials (see attached plan and section) . Applicant: Stevens, Greg | Permit type: Construction | Permit status: Initial information colle | Current use: Institutional | Permit id: 6363676 | |||||
SCORE 95 Land use application to allow a 10% capacity expansion (1. 5 million gallons) of an existing utility service use in a public facility (meadowbrook pond). Review includes 9,7 cu. Yds. Of dredging, removal of 10,0 cu. Yds. Of material (expansion area), new access ramps and widened access routes. Determination of non-significance prepared by seattle public utilities. Applicant: Stevens, Greg | Permit type: Sepa threshold determination | Permit status: Permit closed | Current use: Commercial | Permit id: 3013236 | |||||
During winter of 2013, approximately 15 linear feet the thornton creek bank near the meadowbrook pond facility sloughed into the creek (see attached photo and location map). The bank appears to be fill material consisting mostly of compacted soil and rock. Spu plans to remove this sloughed material and install rip rap slope protection with more stable materials (see attached plan and section) . Applicant: Stevens, Greg | Permit type: Construction | Permit status: Initial information colle | Current use: Institutional | Permit id: 6363676 | |||||
SCORE 56 Construct trash rack in existing overflow inlet from thorton creek to meadowbrook pond for seattle public utilities per plan. Date: December 4, 2012 Value: $20,000 Applicant: Stevens, Greg | Permit type: Construction | Permit status: Permit closed | Completion date: February 27, 2015 | Expiration date: December 4, 2015 | Current use: Commercial | Permit id: 6320066 | |||||
During winter of 2013, approximately 15 linear feet the thornton creek bank near the meadowbrook pond facility sloughed into the creek (see attached photo and location map). The bank appears to be fill material consisting mostly of compacted soil and rock. Spu plans to remove this sloughed material and install rip rap slope protection with more stable materials (see attached plan and section) . Applicant: Stevens, Greg | Permit type: Construction | Permit status: Initial information colle | Current use: Institutional | Permit id: 6363676 |