Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 60 Change out existing 125 amp main panel to 2 amp main panel. Date: May 23, 2012 Contractor: Kinnear Anthony B Permit status: Finaled | Permit id: B12-1748 | |||||
SCORE 83 Install 2 mini-split systems in sfd. Mechanical equipment: ground-mounted air conditioners, swimming pool pumps, and related and similar equipment may be placed within a required side or rear yard setback, provided that the equipment is: (a) not closer t Date: November 5, 2014 Contractor: K K A T Mechanical Permit type: Pool/spa | Permit status: Finaled | Permit id: B14-4473 | |||||
SCORE 65 Demo and rebuild exisitng deck 7 sf. Permit status: Finaled | Permit id: B13-4307 | |||||
SCORE 60 Add elevator, unconditioned storage area and expand third story master bedroom. Date: January 30, 2014 Contractor: Kinnear Anthony B Permit status: Issued | Permit id: B13-5179 | |||||
SCORE 65 6. 48 kw roof mounted pv system Date: October 23, 2014 Contractor: Ronald B Mc Clintock Permit type: Roof | Permit status: Finaled | Permit id: B14-4286 |