Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Expansion of three existing window openings and addition of one new window in compliance with engineered design and egress requirements. Filling in two existing window openings. Client: Cathrine Coppolecchia | Applicant: Milo Construction Corporation | Permit type: Building | Permit status: Cmp | Completion date: December 23, 2013 | Current use: Single family d | |||||
SCORE 96 Interior non-structural remodel to remove existing kitchen in order to comply with cpl2012-00556 for non-compliant adu. Scope of work includes removal of gas stove, refrigerator, and capping of 18inchx14inch section of existing sink by installation of silicone cutting board onto granite counter-top and leaving a 15inchx13inch section of existing sink (qualifying it as a bar sink). 18inchx14inch section of sink shall be left inoperable. Associated gas line and plumbing to be capped behind sheet rock wall. Client: David Kirk | Applicant: M J Construction | Permit type: Building, plumbing | Permit status: Cmp | Completion date: December 7, 2012 | Current use: Single family d | |||||
SCORE 96 Interior non-structural remodel to remove existing kitchen in order to comply with cpl2012-00556 for non-compliant adu. Scope of work includes removal of gas stove, refrigerator, and capping of 18inchx14inch section of existing sink by installation of silicone cutting board onto granite counter-top and leaving a 15inchx13inch section of existing sink (qualifying it as a bar sink). 18inchx14inch section of sink shall be left inoperable. Associated gas line and plumbing to be capped behind sheet rock wall. Client: David Kirk | Permit type: Building, plumbing | Permit status: Cmp | Completion date: December 7, 2012 | Current use: Single family detached dwelling, existin | Permit id: Pmt2012-05711 |