Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 92 Cell site modification - install emergency generator w concrete spill containment for existing verizon cell site Permit type: Commercial alteration-addn | Permit status: Completed | Completion date: September 27, 2013 | Permit id: Pds2013-Comalt- | |||||
Cell site modification for "verizon wireless to include removal and replacement of 4 panel antennas, the installation of 4 rrus, 1 raycap, and one hybriflex cable on an (e) monopine. 1 14 2016 plan change. Modified scope to match new plans. See c of a... Ss 11-06-15 one-time only 1 days plan check extension @25%..... Valid until 02-02-16... Tlh Date: August 6, 2014 Value: $16,246 Permit type: Commercial alteration-addn | Permit status: Pc invalid expired | Permit id: Pds2014-Comalt- | |||||
SCORE 100 Sqft pad for (n) generator for (e) at&t cell site. Permit type: New commercial acc structure | Permit status: Issued | Permit id: Pds2016-Comacc- | |||||
Cell site modification for at&t as follows sector a - remove antennas on position 1 & 2 sector a - install fwll antennas on position 1 & 2 sector b - remove antennas on position 1 & 2 sector b - install fwll antennas on position 1 & 2 2 new wcs rrus at sector a and 2 at sector b 2 new wcs rf filter at sector a and 2 at sector b 1 new dc-6 surge protector 1 new purcell cabinet 2 new dc trunks 1 new fiber trunks Date: October 5, 2016 Value: $50,000 Permit type: Commercial alteration-addn | Permit status: Open | Permit id: Pds2016-Comalt- | |||||
SCORE 100 Removal & replacement of six (6) panel antennas (4 proposed, 2 reserved for future installation), addition of six (6) rrus a2 packs (4 proposed, 2 reserved for future installation) addition of ywo (2) raycaps (1 mountedto tower, 1 mounted in shelter), addition of one (1) hybriflex cable on an existing monopine, addtion of two (2) 8mm ret jumper cables and addition of one (1) rack mounted baseband unit for dameron valley verizon wireless Permit type: Commercial alteration-addn | Permit status: Completed | Completion date: September 23, 2016 | Permit id: Pds2016-Comalt- | |||||
SCORE 82 Cell site modification for at&t as follows sector a - remove antennas on position 1 & 2 sector a - install fwll antennas on position 1 & 2 sector b - remove antennas on position 1 & 2 sector b - install fwll antennas on position 1 & 2 2 new wcs rrus at sector a and 2 at sector b 2 new wcs rf filter at sector a and 2 at sector b 1 new dc-6 surge protector 1 new purcell cabinet 2 new dc trunks 1 new fiber trunks Permit type: Addn | Permit status: Completed | Completion date: August 14, 2017 | Permit id: Pds2016-Comalt- | |||||
SCORE 100 Cell site mod for t-mobile install 3 new 80" high quad panel antennas (1 antenna per sector on existing monopine) install 3 new rrus (1 antenna per sector on existing monopine) install 1 purcell ssc equipment cabinet within new lease area install 6601 and 1 dus41 units inside new cabinet install 1pbc05 equipment cabinet within new lease area install 3 1 1 4" hcs cables(1hcs cable per sector) install 3 fiber jumpers (1 per sector) Permit type: Addn | Permit status: Completed | Completion date: December 20, 2017 | Permit id: Pds2017-Comalt- | |||||
Stormwater insp Date: October 26, 2016 Permit status: Monitor | Permit id: Pds2016-Comacc- | |||||
Final Date: September 24, 2013 Permit status: Pass | Permit id: Pds2013-Comalt- | |||||
Final Date: June 22, 2009 Permit status: Pass | Permit id: Pds2009-1019-20 | |||||
Underground electrical Date: December 24, 2008 Permit status: Pass | Permit id: Pds2008-1019-20 |