Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 73 Install anchor to secure feet pallett rack 8 hilti anchor (located in 26 middle) Permit status: Permit issued | Permit id: 15000-00552 | |||||
SCORE 98 Install new rooftop ac unit at shop building and associated electrical mechanical and plumbing. Permit status: Permit issued | Permit id: 15000-00458 | |||||
SCORE 98 Accessible walk and parking restripe. Permit status: Permit issued | Permit id: 15000-01782 | |||||
SCORE 86 Office tenant improvement for 26 upper. Convert space from lab to office space. Includes 4 new mezzanines and skylights. Permit status: Permit issued | Permit id: 14000-01767 | |||||
SCORE 98 14-2991 - revised equipment and layout ![]() ![]() Permit status: Permit issued | Permit id: 15rev-00036 | |||||
SCORE 98 Tesla motors: sheet metal shop expansion phase 1 building 26(lower) addition of (n) full height interior partion walls, (n) low height wall and new roll-up doors with related mech, struct and elect. Approx 3456 sq ft Permit status: Permit issued | Permit id: 14000-01452 | |||||
SCORE 93 Tenent impovement ~1600sf for existing firm "tesla motors" at 24 lower. Includes full height interior partitions for colaboration and equipment room associated mechanical, electrical and plumbing. Mechanical work throughout 24 lower. Permit status: Permit issued | Permit id: 14000-01400 | |||||
SCORE 92 Install (3) tec-90s, (3) step down transformers, (1) absorber motors, daq cabinet, chiller and disconnect in 2cl dyno lab. Install new step down transformer after the meter and stand at ch 25m. Permit status: Permit issued | Permit id: 14000-00816 | |||||
SCORE 98 Building 26l: install new 50-foot interior wall 08 26 2014 14rev-005 revised plans include additional scope of work valuation to 130k ( change contactor to 440847 ) Permit status: Permit issued | Permit id: 14000-00630 | |||||
SCORE 92 Building 26l: install new equipment in dyno lab, including two (2) 4-square machines Permit status: Permit issued | Permit id: 14000-00629 | |||||
SCORE 92 Installation of bridge crane system in 26m with associated electrical equipment. Permit status: Permit issued | Permit id: 14000-00247 | |||||
SCORE 92 Tesla upper; tenant improvements(elec only)includes install lighting and outlets and change door swing. ![]() ![]() Permit status: Permit issued | Permit id: 13000-03287 | |||||
SCORE 92 Tesla: install interior roll up door, new step transformers located after the meter, new thermal chambers, new vibration tables, new uninterupted power supplies Permit status: Permit issued | Permit id: 13000-03142 | |||||
SCORE 92 26 lower; install transformers on racks and associated electrical work. Permit status: Permit issued | Permit id: 13000-02990 | |||||
SCORE 92 Testing equipment in power eletronics lab 26m: install temperature chambers, transformers, te- chamber oven, ac source and low pony wall. Permit status: Permit issued | Permit id: 13000-02870 | |||||
SCORE 92 Lab equipment in cellcharacterization lab on 26l: install chambers, themal enclosures, new double door and recepticles. Permit status: Permit issued | Permit id: 13000-02869 | |||||
SCORE 92 Tesla: installation of equipment and exhaust fan on lower floor; scope of work includes equipment installation previously issued under 11-3244 and 11-1063 which were never finaled per meeting with bud, peter and fire dept. Permit status: Permit issued | Permit id: 13000-02744 | |||||
SCORE 92 Building 26l, tesla: install (n) equipment -haas plasma cutter Permit status: Permit issued | Permit id: 13000-02570 | |||||
SCORE 98 Install 12 level 2 evse, associated transformers from existing panels. ![]() ![]() Permit status: Permit issued | Permit id: 14000-02991 | |||||
SCORE 98 Tesla, building 26 middle: equipment installation of two transformers (located after the meter) and two tec90s Permit status: Permit issued | Permit id: 15000-00036 | |||||
SCORE 98 Tesla: new storage racks in building 26 middle Permit status: Permit issued | Permit id: 14000-03176 | |||||
SCORE 98 Install tec- electric equipment at 24midle. Permit status: Permit issued | Permit id: 15000-01781 | |||||
SCORE 98 Install (1) thermal chamber in 26 lower for "tesla motors" associated electrical. Permit status: Permit issued | Permit id: 14000-02621 | |||||
13-3287: revised lighting and power 26 upper ![]() Permit status: Permit issued | Permit id: 14rev-00529 | |||||
SCORE 98 Equipment install for tesla motors at 26 lower. Permit status: Permit issued | Permit id: 14000-01977 | |||||
SCORE 92 14-6 : additional scope of work at same area 26l. Valuation increased from 10k to to 135k and associated fees re-assessed on parent permit. ![]() ![]() Permit status: Permit issued | Permit id: 14rev-00500 | |||||
SCORE 98 14-1452 - revise glazing height associated structural. ![]() ![]() Permit status: Permit issued | Permit id: 14rev-00481 | |||||
SCORE 98 14-1452 - revised electrical mechanical and plumbing for 26 lower. ![]() ![]() Permit status: Permit issued | Permit id: 14rev-00453 | |||||
SCORE 59 Installation of (n) halt chamber with associated support equipment, liquid nitrogen dewars, (n) exhaust fan at exterior of building Permit status: Permit issued | Permit id: 14000-01760 | |||||
SCORE 98 14000-01452: revision for client changes on mechanical, electrical and plumbing. And related architectural and structural changes for phase 1 sheet-metal shop ![]() ![]() Permit status: Permit issued | Permit id: 14rev-00442 | |||||
SCORE 84 Tesla motors: 26 lower electric work. New receptacles and subpanels. ![]() ![]() Permit status: Permit issued | Permit id: 14000-01857 | |||||
SCORE 95 Tesla: add two interior partition walls and two doors to create an additional office. ![]() ![]() Permit status: Permit issued | Permit id: 13000-00493 | |||||
SCORE 91 Mechanical upgrade to 26 lower for existing firm "tesla" ~2600sf ![]() ![]() Permit status: Permit issued | Permit id: 14000-01441 | |||||
SCORE 92 13-2638: revise equipment anchorage detail. ![]() ![]() Permit status: Permit issued | Permit id: 14rev-00108 | |||||
SCORE 92 Equipment install for cnc machine Permit status: Permit issued | Permit id: 14000-00253 | |||||
SCORE 92 13-3142: revised electrical and add new thermal chamber. ![]() ![]() Permit status: Permit issued | Permit id: 14rev-00040 | |||||
SCORE 92 13000-02636: post will no longer be embeded in concrete, so revised calcs and detail provided to show post is anchorted to footing ![]() ![]() Permit status: Permit issued | Permit id: 13rev-00774 | |||||
SCORE 92 Install charging station on 24m and (6) quad drops on 26l. ![]() ![]() Permit status: Permit issued | Permit id: 13000-03397 | |||||
SCORE 92 13-2869: addition of (14) 120v quad receptacles ![]() ![]() Permit status: Permit issued | Permit id: 13rev-00789 | |||||
SCORE 92 (13000-03287) title 24 updates ![]() ![]() Permit status: Permit issued | Permit id: 13rev-00788 | |||||
SCORE 92 Commercial: install 33 exterior evses including installation of 150kva transformer in landscaping ![]() ![]() Permit status: Permit issued | Permit id: 13000-02636 | |||||
SCORE 92 13-2636: revised trenching plan and associated changes. ![]() ![]() Permit status: Permit issued | Permit id: 13rev-00732 | |||||
SCORE 92 13-2570: revise anchorage for equipment. ![]() ![]() Permit status: Permit issued | Permit id: 13rev-00706 | |||||
SCORE 92 Relocate crane in 26 lower Permit status: Permit issued | Permit id: 13000-02989 | |||||
SCORE 92 26 middle; install (2) transformers and associated electrical work. Permit status: Permit issued | Permit id: 13000-02952 | |||||
SCORE 92 Lab equipmeent includes wall mounted charging station associated structural and electrical. Permit status: Permit issued | Permit id: 13000-02843 | |||||
SCORE 92 Tesla: install (3) tec power supplies, (3) transformers, (2) absorber fans, & (1) new 400amp 480volt panel in dyno lab on second floor. Permit status: Permit issued | Permit id: 13000-02657 | |||||
SCORE 92 Install full height walls to create new work space, metal fabrication equipment (cng press, brake hydraulic shear) and lighting in sheet metal shop approx 2138 sq ft Permit status: Permit issued | Permit id: 13000-02638 | |||||
SCORE 92 Bldg 26l install (n) equipment: dyono #6, tec 905 transformers, water chiller, electrocal disconnect and battery system. Install (n) interior door. ![]() ![]() Permit status: Permit issued | Permit id: 12000-01054 | |||||
SCORE 92 Bldg 24l- equipment expansion for phase 2: (1) fume hood, (2) glove boxes & dry room equipment for cell research ![]() ![]() Permit status: Permit issued | Permit id: 12000-00588 | |||||
SCORE 92 (ref permit #11-1063) building 26l: electrical revisions to thermal chambers. ![]() ![]() Permit status: Permit issued | Permit id: 12rev-00207 | |||||
SCORE 92 Building 24, tesla: install a 24m-nvh vehicle chamber and lift with associated electrical and mechanical. ![]() ![]() Permit status: Permit issued | Permit id: 12000-00501 | |||||
SCORE 86 Existing tenant "tesla" tenant improvement in cafeteria area includes relocating existing equipment and replacing sink and associated millwork. Permit status: Permit issued | Permit id: 15000-01327 | |||||
SCORE 86 14000-01767: revisions to add a drop ceiling in the large conference room and adding an acoustic roof panel below the mezzanine, new lighting in the large conference room. Mechanical detail changes required by inspector. Chair to mezzanine removed from scope of work ![]() ![]() Permit status: Permit issued | Permit id: 15rev-00200 | |||||
SCORE 86 15-1327: revised fire rating assembly. ![]() ![]() Permit status: Permit issued | Permit id: 15rev-00364 | |||||
SCORE 98 26 middle equipment install includes new welding equipment associated electrical chiller Permit status: Permit issued | Permit id: 15000-01003 | |||||
SCORE 59 Tesla: replace lighting throughout all three connected buildings and parking lot. No additional fixtures added. At the parking lot replace light fixtures one for one on (e) light poles. ![]() ![]() Permit status: In plan check | Permit id: 15000-01701 | |||||
SCORE 86 14000-01767: revision to t-24 ![]() ![]() Permit status: Permit issued | Permit id: 15rev-00369 | |||||
SCORE 98 15-548: revised mechacnical and associated structural architectural. ![]() ![]() Permit status: Permit issued | Permit id: 15rev-00257 | |||||
Existing tenant interior non-structural demo (3787sf) at cafeteria in preparation for separate permit tenant improvement. ![]() Permit status: Approved | Permit id: 15000-01217 | |||||
SCORE 94 Commercial water line replacement. No work in public row. ![]() ![]() Permit status: Permit issued | Permit id: 15000-01255 | |||||
SCORE 92 16-2276: revised plans include trench runs and associated electrical work. Includes new electrical equipment. ![]() ![]() Permit status: In plan check | Permit id: 17rev-00245 | |||||
SCORE 73 Install pallet racks (5) Permit status: Finaled | Permit id: 17000-00190 | |||||
SCORE 92 Installation of tesla power pack, inverter and new switch gear at rear courtyard. Permit status: Permit issued | Permit id: 16000-02276 | |||||
SCORE 92 16000-02276: revision revised electrical, existing 800amp breaker to remain ![]() ![]() Permit status: Completed | Permit id: 17rev-00678 | |||||
SCORE 98 Tenant improvement at 26 lower 3400sf and equipment install for "tesla motors" Permit status: Permit issued | Permit id: 16000-01207 | |||||
Install (2) tec- and associated elecrtical work @ 26 lower. ![]() ![]() Permit status: Approved | Permit id: 17000-01186 | |||||
SCORE 84 Equipment install 26 middle (1) tec- unit Permit status: Finaled | Permit id: 16000-02254 | |||||
SCORE 98 Tesla motors equipment install 26 lower includes environmental chamber and associated cooling system and (2) tec and associated electrical work. Permit status: Finaled | Permit id: 17000-00125 | |||||
SCORE 84 Install transformer 1 to 2 volt in prepartion associated panels in preparation expansion energy lab. Permit status: Approved | Permit id: 17000-01629 | |||||
SCORE 95 Expand on existing photovoltaic system. Install roof mounted panels for 18kw. ![]() ![]() Permit status: In plan check | Permit id: 17000-01824 |