Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Install (1) gps antenna on roof and connect to existing equipment room. Install new equipment associated electrical work. Value: $5,000 Permit type: Project - building permit | Permit status: In plan check | Permit id: 16000-00396 | |||||
SCORE 73 Tesla: installation of two (2) 12-foot tall storage racks. Permit type: Project - building permit | Permit status: Permit issued | Permit id: 16000-00362 | |||||
SCORE 98 Equipment rack and tec- transformer at 26 lower. Permit type: Project - building permit | Permit status: Permit issued | Permit id: 16000-00265 | |||||
SCORE 98 15-2862: revised anchorage design for laser generator. Date: January 21, 2016 Contractor: Coulter Construction Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 16rev-00049 | |||||
SCORE 75 Install commercial rooftop photovoltaic system 20. 4kw on panels. Date: January 11, 2016 Contractor: Hunt Electric Inc Permit type: Project - building permit | Permit status: Approved | Permit id: 16000-00070 | |||||
SCORE 98 15-2235: revised plans include additional scope relocation dyno 17, 18 and associated equipment. Date: January 5, 2016 Contractor: Coulter Construction Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 16rev-00004 | |||||
SCORE 84 Tesla: building 26 middle. Install75kva step down transformer after the meter. Install (2) 225 amp sub panels, receptacles, and disconnects. No exterior work Permit type: Project - building permit | Permit status: Permit issued | Permit id: 15000-03087 | |||||
SCORE 98 Relocate (2) sets equipment at 26 lower Permit type: Project - building permit | Permit status: Permit issued | Permit id: 15000-03067 | |||||
SCORE 98 Existing firm "tesla motors" equipment install at 26 middle with associated mecanical and electrical. Permit type: Project - building permit | Permit status: In plan check | Permit id: 15000-02862 | |||||
SCORE 98 15-1965: revised structural for hanging wall system Date: October 23, 2015 Contractor: Coulter Construction Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 15rev-00633 | |||||
SCORE 86 Existing firm tesla - tenant improvement ~300sf coffee station at 26 upper for employees. Includes new millwork and plumbing and electrical. Permit type: Project - building permit | Permit status: Permit issued | Permit id: 15000-02405 | |||||
SCORE 98 Building 26 lower, tesla: equipment installation for (e) tenant. Scope of work includes eight (8) (n) tec90s and a closed loop process piping system for (e) dynometers (12, 13, 14, and 15) Permit type: Project - building permit | Permit status: Permit issued | Permit id: 15000-02235 | |||||
SCORE 98 Tesla: 26 lower. Remodel for (e) tenant space. Scope of work includes interior partitions and doors. Permit type: Project - building permit | Permit status: Permit issued | Permit id: 15000-01965 | |||||
SCORE 98 Install tec- electric equipment at 24midle. Permit type: Project - building permit | Permit status: Permit issued | Permit id: 15000-01781 | |||||
SCORE 98 Accessible walk and parking restripe. Permit type: Project - building permit | Permit status: Permit issued | Permit id: 15000-01782 | |||||
SCORE 59 Tesla: replace lighting throughout all three connected buildings and parking lot. No additional fixtures added. At the parking lot replace light fixtures one for one on (e) light poles. Date: July 1, 2015 Contractor: Enlight Energy Efficient Lighting Inc Permit type: Project - building permit | Permit status: In plan check | Permit id: 15000-01701 | |||||
SCORE 86 15-1327: revised fire rating assembly. Date: June 23, 2015 Contractor: C W Driver Incorporated Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 15rev-00364 | |||||
SCORE 86 14000-01767: revision to t-24 Date: June 24, 2015 Contractor: Spediacci Construction Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 15rev-00369 | |||||
SCORE 86 Existing tenant "tesla" tenant improvement in cafeteria area includes relocating existing equipment and replacing sink and associated millwork. Permit type: Project - building permit | Permit status: Permit issued | Permit id: 15000-01327 | |||||
SCORE 94 Commercial water line replacement. No work in public row. Date: May 19, 2015 Contractor: Preston Pipelines Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 15000-01255 | |||||
Existing tenant interior non-structural demo (3787sf) at cafeteria in preparation for separate permit tenant improvement. Permit type: Project - building permit | Permit status: Approved | Permit id: 15000-01217 | |||||
SCORE 98 26 middle equipment install includes new welding equipment associated electrical chiller Permit type: Project - building permit | Permit status: Permit issued | Permit id: 15000-01003 | |||||
SCORE 86 14000-01767: revisions to add a drop ceiling in the large conference room and adding an acoustic roof panel below the mezzanine, new lighting in the large conference room. Mechanical detail changes required by inspector. Chair to mezzanine removed from scope of work Date: March 30, 2015 Contractor: Spediacci Construction Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 15rev-00200 | |||||
SCORE 73 Install anchor to secure feet pallett rack 8 hilti anchor (located in 26 middle) Permit type: Project - building permit | Permit status: Permit issued | Permit id: 15000-00552 | |||||
SCORE 98 Install new rooftop ac unit at shop building and associated electrical mechanical and plumbing. Permit type: Project - building permit | Permit status: Permit issued | Permit id: 15000-00458 | |||||
SCORE 98 14-2991 - revised equipment and layout Date: January 27, 2015 Contractor: Coulter Construction Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 15rev-00036 | |||||
SCORE 98 Install 12 level 2 evse, associated transformers from existing panels. Date: November 20, 2014 Contractor: Coulter Construction Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 14000-02991 | |||||
SCORE 98 Tesla, building 26 middle: equipment installation of two transformers (located after the meter) and two tec90s Permit type: Project - building permit | Permit status: Permit issued | Permit id: 15000-00036 | |||||
SCORE 98 Tesla: new storage racks in building 26 middle Permit type: Project - building permit | Permit status: Permit issued | Permit id: 14000-03176 | |||||
SCORE 86 Office tenant improvement for 26 upper. Convert space from lab to office space. Includes 4 new mezzanines and skylights. Permit type: Project - building permit | Permit status: Permit issued | Permit id: 14000-01767 | |||||
13-3287: revised lighting and power 26 upper Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 14rev-00529 | |||||
SCORE 98 Install (1) thermal chamber in 26 lower for "tesla motors" associated electrical. Permit type: Project - building permit | Permit status: Permit issued | Permit id: 14000-02621 | |||||
SCORE 98 Equipment install for tesla motors at 26 lower. Permit type: Project - building permit | Permit status: Permit issued | Permit id: 14000-01977 | |||||
SCORE 92 14-6 : additional scope of work at same area 26l. Valuation increased from 10k to to 135k and associated fees re-assessed on parent permit. Date: August 26, 2014 Contractor: Tesla Motors Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 14rev-00500 | |||||
SCORE 98 14-1452 - revise glazing height associated structural. Date: August 19, 2014 Contractor: Coulter Construction Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 14rev-00481 | |||||
SCORE 98 14-1452 - revised electrical mechanical and plumbing for 26 lower. Date: August 6, 2014 Contractor: Coulter Construction Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 14rev-00453 | |||||
SCORE 98 14000-01452: revision for client changes on mechanical, electrical and plumbing. And related architectural and structural changes for phase 1 sheet-metal shop Date: July 30, 2014 Contractor: Coulter Construction Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 14rev-00442 | |||||
SCORE 59 Installation of (n) halt chamber with associated support equipment, liquid nitrogen dewars, (n) exhaust fan at exterior of building Permit type: Project - building permit | Permit status: Permit issued | Permit id: 14000-01760 | |||||
SCORE 84 Tesla motors: 26 lower electric work. New receptacles and subpanels. Date: July 18, 2014 Contractor: G L Frederick Permit type: Project - building permit | Permit status: Permit issued | Permit id: 14000-01857 | |||||
SCORE 93 Tenent impovement ~1600sf for existing firm "tesla motors" at 24 lower. Includes full height interior partitions for colaboration and equipment room associated mechanical, electrical and plumbing. Mechanical work throughout 24 lower. Permit type: Project - building permit | Permit status: Permit issued | Permit id: 14000-01400 | |||||
SCORE 98 Tesla motors: sheet metal shop expansion phase 1 building 26(lower) addition of (n) full height interior partion walls, (n) low height wall and new roll-up doors with related mech, struct and elect. Approx 3456 sq ft Permit type: Project - building permit | Permit status: Permit issued | Permit id: 14000-01452 | |||||
SCORE 91 Mechanical upgrade to 26 lower for existing firm "tesla" ~2600sf Date: June 17, 2014 Contractor: Bay Air Systems Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 14000-01441 | |||||
SCORE 92 Install (3) tec-90s, (3) step down transformers, (1) absorber motors, daq cabinet, chiller and disconnect in 2cl dyno lab. Install new step down transformer after the meter and stand at ch 25m. Permit type: Project - building permit | Permit status: Permit issued | Permit id: 14000-00816 | |||||
SCORE 92 Building 26l: install new equipment in dyno lab, including two (2) 4-square machines Permit type: Project - building permit | Permit status: Permit issued | Permit id: 14000-00629 | |||||
SCORE 92 13-2638: revise equipment anchorage detail. Date: February 21, 2014 Contractor: Tesla Motors Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 14rev-00108 | |||||
SCORE 92 Equipment install for cnc machine Permit type: Project - building permit | Permit status: Permit issued | Permit id: 14000-00253 | |||||
SCORE 92 Installation of bridge crane system in 26m with associated electrical equipment. Permit type: Project - building permit | Permit status: Permit issued | Permit id: 14000-00247 | |||||
SCORE 92 13-3142: revised electrical and add new thermal chamber. Date: January 22, 2014 Contractor: Tesla Motors Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 14rev-00040 | |||||
SCORE 92 Tesla: install interior roll up door, new step transformers located after the meter, new thermal chambers, new vibration tables, new uninterupted power supplies Permit type: Project - building permit | Permit status: Permit issued | Permit id: 13000-03142 | |||||
SCORE 92 Install charging station on 24m and (6) quad drops on 26l. Date: December 20, 2013 Contractor: Tesla Motors Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 13000-03397 | |||||
SCORE 92 13-2869: addition of (14) 120v quad receptacles Date: December 20, 2013 Contractor: Tesla Motors Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00789 | |||||
SCORE 92 (13000-03287) title 24 updates Date: December 20, 2013 Contractor: Tesla Motors Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00788 | |||||
SCORE 92 13000-02636: post will no longer be embeded in concrete, so revised calcs and detail provided to show post is anchorted to footing Date: December 13, 2013 Contractor: Tesla Motors Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00774 | |||||
SCORE 92 Tesla upper; tenant improvements(elec only)includes install lighting and outlets and change door swing. Date: December 13, 2013 Contractor: Tesla Motors Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 13000-03287 | |||||
SCORE 92 13-2636: revised trenching plan and associated changes. Date: November 22, 2013 Contractor: Tesla Motors Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00732 | |||||
SCORE 92 Lab equipment in cellcharacterization lab on 26l: install chambers, themal enclosures, new double door and recepticles. Permit type: Project - building permit | Permit status: Permit issued | Permit id: 13000-02869 | |||||
SCORE 92 Testing equipment in power eletronics lab 26m: install temperature chambers, transformers, te- chamber oven, ac source and low pony wall. Permit type: Project - building permit | Permit status: Permit issued | Permit id: 13000-02870 | |||||
SCORE 92 26 lower; install transformers on racks and associated electrical work. Permit type: Project - building permit | Permit status: Permit issued | Permit id: 13000-02990 | |||||
SCORE 92 Relocate crane in 26 lower Permit type: Project - building permit | Permit status: Permit issued | Permit id: 13000-02989 | |||||
SCORE 92 13-2570: revise anchorage for equipment. Date: November 13, 2013 Contractor: Tesla Motors Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00706 | |||||
SCORE 92 26 middle; install (2) transformers and associated electrical work. Permit type: Project - building permit | Permit status: Permit issued | Permit id: 13000-02952 | |||||
SCORE 92 Commercial: install 33 exterior evses including installation of 150kva transformer in landscaping Date: October 1, 2013 Contractor: Tesla Motors Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 13000-02636 | |||||
SCORE 92 Tesla: installation of equipment and exhaust fan on lower floor; scope of work includes equipment installation previously issued under 11-3244 and 11-1063 which were never finaled per meeting with bud, peter and fire dept. Permit type: Project - building permit | Permit status: Permit issued | Permit id: 13000-02744 | |||||
SCORE 92 Lab equipmeent includes wall mounted charging station associated structural and electrical. Permit type: Project - building permit | Permit status: Permit issued | Permit id: 13000-02843 | |||||
SCORE 92 Building 26l, tesla: install (n) equipment -haas plasma cutter Permit type: Project - building permit | Permit status: Permit issued | Permit id: 13000-02570 | |||||
SCORE 92 Install full height walls to create new work space, metal fabrication equipment (cng press, brake hydraulic shear) and lighting in sheet metal shop approx 2138 sq ft Permit type: Project - building permit | Permit status: Permit issued | Permit id: 13000-02638 | |||||
SCORE 95 Tesla: add two interior partition walls and two doors to create an additional office. Date: February 21, 2013 Contractor: Tashcon Corp Permit type: Project - building permit | Permit status: Permit issued | Permit id: 13000-00493 | |||||
13-3287: revised lighting and power 26 upper Date: September 5, 2014 Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 14rev-00529 | |||||
SCORE 92 Bldg 26l install (n) equipment: dyono #6, tec 905 transformers, water chiller, electrocal disconnect and battery system. Install (n) interior door. Date: May 8, 2012 Contractor: Tesla Motors Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-01054 | |||||
SCORE 92 Bldg 24l- equipment expansion for phase 2: (1) fume hood, (2) glove boxes & dry room equipment for cell research Date: March 16, 2012 Contractor: Tesla Motors Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-00588 | |||||
SCORE 92 (ref permit #11-1063) building 26l: electrical revisions to thermal chambers. Date: April 11, 2012 Contractor: Tesla Motors Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00207 | |||||
SCORE 92 Building 24, tesla: install a 24m-nvh vehicle chamber and lift with associated electrical and mechanical. Date: March 6, 2012 Contractor: Tesla Motors Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-00501 | |||||
Existing tenant interior non-structural demo (3787sf) at cafeteria in preparation for separate permit tenant improvement. Date: May 14, 2015 Permit type: Project - building permit | Permit status: Approved | Permit id: 15000-01217 | |||||
Install (1) gps antenna on roof and connect to existing equipment room. Install new equipment associated electrical work. Date: February 19, 2016 Value: $5,000 Permit type: Project - building permit | Permit status: In plan check | Permit id: 16000-00396 | |||||
SCORE 84 Install new 8 amp distribution panel and feeder . Install new disconnect switches (1) 1 amp and (1) 2 amp. Date: June 16, 2016 Contractor: G L Frederick Permit type: Project - building permit | Permit status: Permit issued | Permit id: 16000-01473 | |||||
Tesla motors equipment install 26 lower includes environmental chamber and associated cooling system and (2) tec and associated electrical work. Date: January 19, 2017 Value: $24,000 Permit type: Project - building permit | Permit status: Approved | Permit id: 17000-00125 | |||||
SCORE 84 Equipment install 26 middle (1) tec- unit Permit type: Project - building permit | Permit status: Finaled | Permit id: 16000-02254 | |||||
SCORE 98 16-1407: revised wall design at 26l. Date: July 6, 2016 Contractor: Coulter Construction Inc Permit type: Revision-building permit | Permit status: Permit issued | Permit id: 16rev-00419 | |||||
SCORE 98 16-623: deferred cleanroom structure associated electrical mechanical Date: April 21, 2016 Contractor: Coulter Construction Inc Permit type: Revision-building permit | Permit status: Permit issued | Permit id: 16rev-00260 | |||||
Installation of tesla power pack, inverter and new switch gear at rear courtyard. Date: September 9, 2016 Value: $38,828 Permit type: Project - building permit | Permit status: Approved | Permit id: 16000-02276 | |||||
SCORE 98 Equipment install at 26 middle includes machine press, plasma cleaner and sintering system. Associated cleanroom to be deferred submittal. Permit type: Project - building permit | Permit status: Permit issued | Permit id: 16000-00623 | |||||
SCORE 73 Install pallet racks (5) Permit type: Project - building permit | Permit status: In plan check | Permit id: 17000-00190 | |||||
SCORE 98 15-548: revised mechacnical and associated structural / architectural. Date: May 4, 2015 Contractor: Coulter Construction Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 15rev-00257 | |||||
SCORE 98 Mechanical work includes additional 3 fan coils ceiling mounted for added cooling and associated ductwork, plumbing and electric. Permit type: Project - building permit | Permit status: Permit issued | Permit id: 16000-03273 | |||||
SCORE 98 Building 26l: install new 50-foot interior wall 08/26/2014 14rev-005 revised plans include additional scope of work valuation to 130k ( change contactor to 440847 ) Permit type: Project - building permit | Permit status: Permit issued | Permit id: 14000-00630 | |||||
SCORE 92 Tesla: install (3) tec power supplies, (3) transformers, (2) absorber fans, & (1) new 400amp/480volt panel in dyno lab on second floor. Permit type: Project - building permit | Permit status: Permit issued | Permit id: 13000-02657 | |||||
SCORE 98 Tenant improvement at 26 lower 3400sf and equipment install for "tesla motors" Permit type: Project - building permit | Permit status: Permit issued | Permit id: 16000-01207 |