Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Install tpo mil membrane over existing modified bitumen roof after fan-fold 1 2" insulation been installed. All perimeter will be secure using term-bar with screws. Date: June 3, 2011 Contractor: Premier Roofing Inc Permit type: Roofing | Permit status: Pass | Completion date: June 3, 2011 | Current use: Residential | Permit id: Bld2011-03233 | |||||
SCORE 64 Install tpo mil membrane over existing modified bitumen roof after fan-fold 1/2" insulation been installed. All perimeter will be secure using term-bar with screws. Date: June 3, 2011 Contractor: Premier Roofing Inc.Gibson Duplex Permit type: Roofing | Permit status: Inspections | Completion date: June 3, 2011 | Current use: Residential | Permit id: Bld2011-03233 |