Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Zoning permit Date: April 22, 2013 Client: Warfield Ervin | Client Company: Erwin Warfield | Permit status: Completed | Permit id: 461670 | |||||
Suppression permit Date: September 19, 2013 Client: Warfield Ervin | Client Company: Erwin Warfield | Permit status: Completed | Permit id: 490577 | |||||
Alteration permit Date: January 16, 2014 Client: Warfield Ervin | Client Company: Erwin Warfield | Permit status: Completed | Permit id: 453462 | |||||
Electrical permit Date: April 24, 2013 Client: Warfield Ervin | Client Company: Erwin Warfield | Permit status: Completed | Permit id: 452157 | |||||
Use permit Date: January 16, 2014 Client: Warfield Ervin | Client Company: Erwin Warfield | Permit status: Completed | Permit id: 511422 | |||||
Zoning permit Date: April 22, 2013 Client: Warfield Ervin | Client Company: Erwin Warfield | Permit status: Completed | Permit id: 461670 | |||||
Electrical permit Date: April 24, 2013 Client: Warfield Ervin | Client Company: Erwin Warfield | Permit status: Completed | Permit id: 452157 | |||||
Use permit Date: January 16, 2014 Client: Warfield Ervin | Client Company: Erwin Warfield | Permit status: Completed | Permit id: 511422 | |||||
Alteration permit Date: January 16, 2014 Client: Warfield Ervin | Client Company: Erwin Warfield | Permit status: Completed | Permit id: 453462 | |||||
Suppression permit Date: September 19, 2013 Client: Warfield Ervin | Client Company: Erwin Warfield | Permit status: Completed | Permit id: 490577 | |||||
SCORE 100 For the installation of a two (2) inch fire service line w. Backflow preventor (bfp) assembly and for installation of a fire suppression system as per nfpa 13r. Separate permit required for certificate of occupancy. Date: September 19, 2013 Contractor: B. M. Consulting Services Inc Client: Warfield Shaniqnia | Permit type: Suppression permit | Permit status: Completed | Completion date: June 12, 2014 | Permit id: 490577 | |||||
For a lot adjustment to create one (1) lot from two (2) existing lots at 03408 (opa accn#112272400) & 034 (opa accn#112272500) n 19th st; size & location as shown in approved plans. Date: April 22, 2013 Client: Warfield Shaniqnia | Permit type: Zoning permit | Permit status: Completed | Completion date: May 31, 2013 | Permit id: 461670 | |||||
SCORE 96 For resolution of dept. Of l&i case# 366893 for level ii alterations & a complete change of occupancy classification to create a residential care facility & for the creation of openings in exist. Interior bearing wall at 2nd & 3rd floors; building to be fully sprinklered. Date: January 16, 2014 Contractor: Dignity Community Construction Client: Warfield Shaniqnia | Permit type: Alteration permit | Permit status: Completed | Completion date: February 3, 2015 | Permit id: 453462 | |||||
For use as group living personal care home for maximum forty-four (44) adults & four (4) live in staff w. All zba provisos as previously approved. See permit ap# 4616 for application. Date: January 16, 2014 Client: Warfield Shaniqnia | Permit type: Use permit | Permit status: Completed | Completion date: December 30, 2016 | Permit id: 511422 | |||||
SCORE 100 Installing a 600amp service per 2008 nec. Meter sockets are to be rated at 3 amps. Date: April 24, 2013 Contractor: Brians Electrical Works Client: Warfield Shaniqnia | Permit type: Electrical permit | Permit status: Completed | Completion date: July 22, 2013 | Permit id: 452157 |