Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 80 Roof mount residential solar pv for existing sfd (no meter upgrade). Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: August 21, 2013 Contractor: Omar Baha Permit type: Electrical : 8002 - | Permit status: Permit finaled | Completion date: September 18, 2013 | Permit id: Pds2013-Resalt- | |||||
Roof mount residential solar pv for existing sfd (no meter upgrade). Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: August 21, 2013 Permit type: Residential alteration-addn | Permit status: Completed | Completion date: September 18, 2013 | Permit id: Pds2013-Resalt- | |||||
SCORE 100 Roof mount residential solar pv for existing sfd (no meter upgrade). Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: August 21, 2013 Contractor: Solar West Electric Inc Permit type: Residential alteration-addn | Permit status: Completed | Completion date: September 18, 2013 | Permit id: Pds2013-Resalt- | |||||
Final Date: September 17, 2013 Permit status: Pass | Permit id: Pds2013-Resalt- |