Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Mechanical permit Date: February 5, 2010 Client: Smolij Irene | Permit status: Completed | Permit id: 261237 | |||||
Electrical permit Date: April 22, 2010 Client: Matzel Laura Garrison Robert T | Permit status: Completed | Permit id: 274291 | |||||
Zoning permit Date: April 15, 2010 Client: Matzel Laura Garrison Robert T | Permit status: Completed | Permit id: 271253 | |||||
Alteration permit Date: December 15, 2009 Client: Smolij Irene | Permit status: Completed | Permit id: 253310 | |||||
Plumbing permit Date: October 15, 2007 Client: Dunbar Thomas A | Permit status: Completed | Permit id: 108912 | |||||
Addition permit Date: April 15, 2010 Client: Matzel Laura Garrison Robert T | Permit status: Completed | Permit id: 271250 | |||||
SCORE 100 Total re-wire: new wiring, receptacles, switches, fixtures ( circuit panel).... In accordance with 2008 code Date: January 15, 2010 Contractor: Mtm Electrical Contractors Client: Smolij Irene | Permit type: Electrical permit | Permit status: Expired | Completion date: January 15, 2010 | Permit id: 256620 | |||||
SCORE 89 Install 100,0 btu heating and ac in a sfd Date: February 5, 2010 Contractor: Neil Rosenberg Client: Smolij Irene | Permit type: Mechanical permit | Permit status: Completed | Completion date: September 17, 2010 | Permit id: 261237 | |||||
SCORE 93 Footway street opening. 5" lateral, housedrain house trap fresh air inlet Date: June 30, 2017 Contractor: Richard Ladavich Client: Smolij Irene | Permit type: Plumbing permit | Permit status: Completed | Completion date: July 10, 2017 | Permit id: 796507 | |||||
Rear addition at 2nd floor Date: April 15, 2010 Client: Matzel Laura Garrison Robert T | Permit type: Zoning permit | Permit status: Completed | Completion date: April 15, 2010 | Permit id: 271253 | |||||
SCORE 86 Bedroom addition: install wiring and devices for hardwire smoke detector, light and switch and four duplex receptacles...... In accordance with 2005 nec Date: April 22, 2010 Contractor: Nichloas Pellegrino Client: Matzel Laura Garrison Robert T | Permit type: Electrical permit | Permit status: Completed | Completion date: August 3, 2010 | Permit id: 274291 | |||||
SCORE 93 Tie in ductwork for new extention to existing hvac system for the new addition to sfd. No penetrationto firerated assembly Date: April 23, 2010 Contractor: Carl Kurtz Client: Matzel Laura Garrison Robert T | Permit type: Mechanical permit | Permit status: Completed | Completion date: January 21, 2011 | Permit id: 274732 | |||||
Interior alterations to include new sheetrock throughout and stucco 1st floor front. Applicant agrees to limit the construction to comply with ez permit standard for interior alterations, dated february 2007. Deviation from the standard will result in revocation of this permit and imposition of further penalties. Date: December 15, 2009 Client: Smolij Irene | Permit type: Alteration permit | Permit status: Completed | Completion date: September 17, 2010 | Permit id: 253310 | |||||
SCORE 100 Curb trap & lateral, drain, fai Date: October 15, 2007 Contractor: Thomas Burke Jr Client: Andrucyk Thomas M | Permit type: Plumbing permit | Permit status: Completed | Completion date: October 15, 2007 | Permit id: 108912 | |||||
Rear addition at the second floor. Permit to construction a 6 x rear addition at the second floor level of an existing single family dwelling. Separate permits required for electrical and mechanical work. Date: April 15, 2010 Client: Matzel Laura Garrison Robert T | Permit type: Addition permit | Permit status: Completed | Completion date: July 16, 2010 | Permit id: 271250 |