Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Atlantic aviation hangar 1 & office Date: October 28, 2016 Permit status: Inspections | Current use: Commercial | Permit id: Bld2016-02683 | |||||
SCORE 94 Structural repair to existing hanger includes engineering design review of repair methods. Date: November 17, 2010 Contractor: Webb Brothers Construction Inc Permit status: Closed | Current use: Commercial | Permit id: Bld2010-07975 | |||||
SCORE 100 Fire sprinkler system provided in hanger area is nfpa-13 light hazard ordinary occupancy protection with . 17 gpm density. Structure is not approved for any high-piled combustible storage (2012 ifc chapter 32) or any hazardous operations (2012 ifc chapter 50) or any aircraft maintenance (2012 ifc chapter 20) without modifications in accordance with 2012 ifc section 914. 8. Change of use and or operations including tenants will need to be evaluated on an individual basis for foam fire protection requirements due to the overall fire area of the group ii hanger; any changes shall not be permitted without the express written approval of the: airport authority, building official, and fire official. Date: December 29, 2016 Contractor: Interwest Fire Protection Permit type: Fire | Permit status: Inspections | Current use: Commercial | Permit id: Bld2016-11119 | |||||
SCORE 100 Date: October 28, 2016 Contractor: Na Permit id: Bld2016-02683 | |||||
SCORE 100 Date: December 29, 2016 Contractor: Na Permit id: Bld2016-11119 | |||||
SCORE 98 Low voltage Date: December 5, 2017 Contractor: Wasatch Electric Permit status: Inspections | Current use: Commercial | Permit id: Bld2017-03973 | |||||
SCORE 100 Sign Date: September 5, 2017 Contractor: Allied Awning And Rental Inc Permit status: Inspections | Permit id: Bld2017-07785 |