Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 59 We are adding wiring for speakers and a tv for a theater and speakers and a tv for a game room, and a tv for a bed room. The other wiring is existing from the original build of the home. New lines will be run from the original av distribution panel in the hvac room to the rack location all in the basement. Date: April 26, 2012 Contractor: Homevision Solutions Inc Permit type: Low voltage | Permit status: Issued | Permit id: Be-201203360 | |||||
SCORE 65 Basement finish Date: April 24, 2012 Contractor: Drh Electric Permit type: Electrical | Permit status: Issued | Permit id: Be-201203278 | |||||
SCORE 56 6 gas taps Date: December 22, 2011 Contractor: Blalock Heating And Air Inc Permit type: Hvac | Permit status: Issued | Permit id: Bm-201103090 | |||||
SCORE 65 Temporary electric power application do not process need temp power letter hs 12 17 11. Received temp power form 12-19-2011 qah Date: December 5, 2011 Contractor: Drh Electric Permit type: Electrical | Permit status: Issued | Permit id: Be-201108883 | |||||
SCORE 65 Electric Date: November 4, 2011 Contractor: Drh Electric Permit type: Electrical | Permit status: Issued | Permit id: Be-201107906 | |||||
SCORE 86 Hvac work-gas line to pool heater Date: October 28, 2011 Contractor: Rickey Pines Contractors Inc Permit type: Hvac | Permit status: Issued | Permit id: Bm-201102582 | |||||
SCORE 56 3 4 ton mini split heat pump Date: October 26, 2011 Contractor: Blalock Hearing And Air Permit type: Hvac | Permit status: Issued | Permit id: Bm-201102557 | |||||
SCORE 99 Pool house plumbing Date: October 20, 2011 Contractor: Bobbys Plumbing Permit type: Plumbing | Permit status: Issued | Permit id: Bp-201103048 | |||||
SCORE 59 Add low voltage for alarm, telephone and data- Date: August 19, 2011 Contractor: Ultimate Security Of America Permit type: Low voltage | Permit status: Issued | Permit id: Be-201105918 |