Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] install a 5. 94 kw solar pv system using 22 itek 270w modules and 2 eltek 29 inverters. ![]() ![]() Permit type: Electrical | Permit status: Permit closed | Completion date: August 14, 2014 | Expiration date: August 4, 2015 | Current use: Single family / duplex | Permit id: 6430267 | |||||
SCORE 95 Spot repair along with linere (4") to 6" x 4" trans ![]() ![]() Applicant: Bob Oates Sewer Rooter | Permit type: Side sewer | Permit status: Permit closed | Completion date: May 7, 2014 | Expiration date: May 6, 2015 | Current use: Single family / duplex | Permit id: 6390961 | |||||
SCORE 88 Adding outlet for circuit extension ![]() ![]() Permit type: Electrical | Permit status: Permit closed | Completion date: September 28, 2011 | Expiration date: September 26, 2012 | Current use: Single family / duplex | Permit id: 6296898 | |||||
SCORE 100 Spot repair along with linere (4") to 6" x 4" trans ![]() ![]() Applicant: Bob Oates Sewer Rooter Llc | Permit type: Side sewer | Permit status: Permit closed | Completion date: May 7, 2014 | Expiration date: May 6, 2015 | Current use: Single family / duplex | Permit id: 6390961 |