Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 87 14000:00230: field clarifications by bldg inspector for emergency power and emergency light fixtures Date: February 27, 2015 Contractor: Guarantee Interiors Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 15rev-00123 | |||||
SCORE 95 Xerox: 7464 sf ti on 3rd floor includes remodel of (e) lobby, office, and conference area. Upgrade of an existing toilet core adjacent to the office space. Mechanical, plumbing and electrical associated with all spaces above to be modified. Add (n) exterior door exiting to courtyard. Permit type: Project - building permit | Permit status: Permit issued | Permit id: 14000-02400 | |||||
SCORE 100 Replace main breaker Date: June 3, 2014 Contractor: Rogers Electric Permit type: Project - building permit | Permit status: Permit issued | Permit id: 14000-01300 | |||||
SCORE 87 Interior non structural demo (5,0 sf). T. I. On 14000-00230 Date: January 28, 2014 Contractor: Guarantee Interiors Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 14000-00244 | |||||
SCORE 64 Interior non-structural demo ~5,236 sf in preparation for ti to follow. 3rd floor only. Date: December 16, 2013 Contractor: Ownder Builder Permit type: Project - building permit | Permit status: Permit issued | Permit id: 13000-03296 | |||||
SCORE 100 (13-112) creating a bridge over un-earthed utility conduit Date: August 13, 2013 Contractor: Rogers Electric Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00510 | |||||
SCORE 59 Install (4) level "1" evse at parking lower parking lot. Date: January 15, 2013 Contractor: Hb And Hh Management Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 13000-00177 | |||||
SCORE 100 Install (2) phase 2 electrical vehicle chargers in parking lot, install (n) 400-amp service. Date: January 10, 2013 Contractor: Rogers Electric Permit type: Project - building permit | Permit status: Permit issued | Permit id: 13000-00112 | |||||
SCORE 64 Parc: remodel for existing tenant. Installation of forty (40) pieces of equipment into a new cleanroom. Cleanroom building built as a part of permit 16000-02954 Permit type: Project - building permit | Permit status: In plan check | Permit id: 16000-03035 | |||||
SCORE 64 Parc: remodel for existing tenant. Scope of work includes 6,3 sf of remodel on the first floor, two new roof exhaust fans and stacks, replacement of diesel generator. Permit type: Project - building permit | Permit status: In plan check | Permit id: 16000-02954 | |||||
SCORE 64 Parc: commercial exterior ti to include (2) new utility yards (liq hyd and liq nitro tanks and pad, di water system and pad) replacement of existing emergency generator, and new rooftop exhaust equipment Permit type: Project - building permit | Permit status: In plan check | Permit id: 16000-03169 | |||||
SCORE 64 Interior non-structural demo 63 sf Date: September 23, 2016 Contractor: Air Conditioning Innovations Permit type: Project - building permit | Permit status: Permit issued | Permit id: 16000-02404 | |||||
SCORE 87 Xerox u&o and ti: (5,0 sf) remodel portion of 2nd and 3rd floors. Add (n) stairs. Remodel (e) bathroom. Add (n) rooftop hvac equipment. Regarde portion of parking lot. U&o sent 4/28/15 Permit type: Project - building permit | Permit status: Permit issued | Permit id: 14000-00230 | |||||
SCORE 87 14000:00230: field clarifications by bldg inspector for emergency power and emergency light fixtures Date: February 27, 2015 Contractor: Guarantee Interiors Inc Permit status: Permit issued | Permit id: 15rev-00123 | |||||
SCORE 87 Interior non structural demo (5,0 sf). T. I. On 14000-00230 Date: January 28, 2014 Contractor: Guarantee Interiors Inc Permit status: Permit issued | Permit id: 14000-00244 | |||||
SCORE 64 Interior non-structural demo ~5,236 sf in preparation for ti to follow. 3rd floor only. Date: December 16, 2013 Contractor: Ownder Builder Permit status: Permit issued | Permit id: 13000-03296 | |||||
SCORE 87 17000-01479: revision includes phase 2. Additional scope on 3rd floor include buildout exhibition demonstration room and break room. Permit valuation increased by 98k and all associated fees collected under main permit. Permit status: Permit issued | Permit id: 17rev-00563 | |||||
SCORE 95 Xerox: 7464 sf ti on 3rd floor includes remodel of (e) lobby, office, and conference area. Upgrade of an existing toilet core adjacent to the office space. Mechanical, plumbing and electrical associated with all spaces above to be modified. Add (n) exterior door exiting to courtyard. Permit status: Permit issued | Permit id: 14000-02400 | |||||
SCORE 100 Replace main breaker Date: June 3, 2014 Contractor: Rogers Electric Permit status: Permit issued | Permit id: 14000-01300 | |||||
SCORE 100 (13-112) creating a bridge over un-earthed utility conduit Date: August 13, 2013 Contractor: Rogers Electric Permit status: Permit issued | Permit id: 13rev-00510 | |||||
SCORE 59 Install (4) level "1" evse at parking lower parking lot. Date: January 15, 2013 Contractor: Hb And Hh Management Inc Permit status: Permit issued | Permit id: 13000-00177 | |||||
SCORE 100 Install (2) phase 2 electrical vehicle chargers in parking lot, install (n) 400-amp service. Date: January 10, 2013 Contractor: Rogers Electric Permit status: Permit issued | Permit id: 13000-00112 | |||||
SCORE 87 Xerox u&o and ti: (5,0 sf) remodel portion of 2nd and 3rd floors. Add (n) stairs. Remodel (e) bathroom. Add (n) rooftop hvac equipment. Regarde portion of parking lot. U&o sent 4 28 15 Date: January 27, 2014 Contractor: Guarantee Interiors Inc Permit status: Finaled | Permit id: 14000-00230 | |||||
SCORE 80 Parc: remodel for existing tenant. Installation of forty (40) pieces of equipment into a new cleanroom. Cleanroom building built as a part of permit 16000-02954 Permit status: Permit issued | Permit id: 16000-03035 | |||||
SCORE 80 Parc: commercial exterior ti to include (2) new utility yards , di water system and pad) replacement of existing emergency generator, and new rooftop exhaust equipment Permit status: Permit issued | Permit id: 16000-03169 | |||||
SCORE 87 Existing firm "xerox" office ti 2900sf includes new office layout. Associated mep. Permit status: Permit issued | Permit id: 17000-01479 | |||||
SCORE 80 16ooo-o3169: add pad for deferred ln2 tank and associated equipment. Includes parking restriping and equipment fencing. Date: October 17, 2017 Contractor: Icom Mechanical Inc Permit status: In plan check | Permit id: 17rev-00673 | |||||
SCORE 80 Parc: remodel for existing tenant. Scope of work includes 6,3 sf of remodel on the first floor, two new roof exhaust fans and stacks, replacement of diesel generator. Permit status: Permit issued | Permit id: 16000-02954 |