Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 Balcony decking replacement - same size, location, dimensions - units 201 & 304. Client: John Leboeff,Little Leboeff | Applicant: P B M Inc | Permit type: Building | Permit status: Cmp | Completion date: February 9, 2005 | Current use: Multifamily dwe | |||||
SCORE 95 Balcony decking replacement - same size, location, dimensions - units 201 & 304. Client: John Leboeff | Permit type: Building | Permit status: Cmp | Completion date: February 9, 2005 | Current use: Multifamily dwellings, existing, deck, a | Permit id: Pmt2004-03458 | |||||
SCORE 95 Replace existing deck with new. 72 sf Client: Joel Podgorski,Heike Podgorski | Applicant: P B M Inc | Permit type: Building | Permit status: N&v | Current use: Single family a | |||||
SCORE 95 Replace existing deck with new. 72 sf Client: Joel Podgorski | Permit type: Building | Permit status: N&v | Current use: Single family attached dwelling, deck, r | Permit id: Pmt2005-02150 | |||||
SCORE 99 Roofing permit for overlay of 24 squares of versa shield over cedar and stone coated metal. Date: April 5, 2007 Contractor: Horn Brothers Roofing Company Client: Joyce Trujillo,Michael Trujillo | Applicant: Horn Brothers Roofing Company | Permit type: Roofing | Permit status: Cmp | Completion date: April 25, 2007 | Current use: Multifamily dwe | |||||
SCORE 99 Roofing permit for overlay of 24 squares of versa shield over cedar and stone coated metal. Client: Joyce Trujillo | Permit type: Roofing | Permit status: Cmp | Completion date: April 25, 2007 | Current use: Multifamily dwellings, existing | Permit id: Pmt2007-01229 | |||||
SCORE 80 Repair and replace floor and walls of existing deck. Client: Christine Sydoriak | Applicant: Hci Interiors & Remodel Llc | Permit type: Building | Permit status: Cmp | Completion date: February 18, 2009 | Current use: Multifamily dwe | |||||
SCORE 80 Repair and replace floor and walls of existing deck. Client: Christine Sydoriak | Permit type: Building | Permit status: Cmp | Completion date: February 18, 2009 | Current use: Multifamily dwellings, repair | Permit id: Pmt2008-04732 | |||||
SCORE 100 Units 102 and 202: structural repairs to water damged floor and wall framing per structural engineerfoots specifications. Work to occur in floor ceiling between units and in walls of unit 102. Scope to include replacement of tub unit in bathroom of unit 202. Client: Christine Sydoriak | Permit type: Building, plumbing | Permit status: Cmp | Completion date: September 26, 2017 | Current use: Multifamily dwellings, repair | Permit id: Pmt2017-03209 | |||||
SCORE 80 Repair and replace floor and walls of existing deck. Client: Matthew Ball | Applicant: Hci Interiors & Remodel Llc | Permit type: Building | Permit status: Cmp | Completion date: February 18, 2009 | Current use: Multifamily dwe | |||||
SCORE 80 Repair and replace floor and walls of existing deck. Client: Matthew Ball | Permit type: Building | Permit status: Cmp | Completion date: February 18, 2009 | Current use: Multifamily dwellings, repair | Permit id: Pmt2008-04738 | |||||
SCORE 84 Installation of a degreee tilt-up ballasted grid-tie 5. 52 kw photovoltaic system on multifamily building #3315 at the remington post complex. Array to be nested in a lower roof area and remain below top edge of existing parapet wall -- shadow of array will not leave the rooftop. See engineerfoots letter and drawings for specific information. Date: November 23, 2011 Contractor: Diversified Electric And Controls Applicant: Diversified Electric & Controls | Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 10, 2012 | Current use: Multifamily dwe | |||||
SCORE 95 Replace-in-kind, two 285,0 btu boilers located in basement boiler room of condo complex. Date: September 18, 2013 Contractor: Timberline Mechanical Systems Client: Steven Oncley,Nancy Oncley | Applicant: Timberline Mechanical Systems | Permit type: Mechanical | Permit status: Cmp | Completion date: October 9, 2013 | Current use: Multifamily dwe | |||||
SCORE 79 Remington post-total tear-off & reroof of mfd, 36. 89 squares of built-up asphalt on a pitch represented as 1 8inch per foot. New polyiso to be installed and inpected at midroof inspection. Densdeck to be installed to achieve class a rating. Mid-roof inspection required if pitch is less than 4 12. Date: January 30, 2014 Contractor: Central States Roofing And Insulating Client: Steven Oncley,Nancy Oncley | Applicant: Central States Roofing & Insulating | Permit type: Roofing | Permit status: Iss | Current use: Multifamily dwe | |||||
SCORE 95 Replace-in-kind, two 285,0 btu boilers located in basement boiler room of condo complex. Client: Steven Oncley | Permit type: Mechanical | Permit status: Cmp | Completion date: October 9, 2013 | Current use: Multifamily dwellings, existing | Permit id: Pmt2013-04680 | |||||
SCORE 79 Remington post-total tear-off & reroof of mfd, 36. 89 squares of built-up asphalt on a pitch represented as 1 8inch per foot. New polyiso to be installed and inpected at midroof inspection. Densdeck to be installed to achieve class a rating. Mid-roof inspection required if pitch is less than 4 12. Client: Steven Oncley | Permit type: Roofing | Permit status: Cmp | Completion date: March 7, 2016 | Current use: Multifamily dwellings, existing | Permit id: Pmt2014-00507 | |||||
SCORE 84 Installation of a degreee tilt-up ballasted grid-tie 5. 52 kw photovoltaic system on multifamily building #3315 at the remington post complex. Array to be nested in a lower roof area and remain below top edge of existing parapet wall -- shadow of array will not leave the rooftop. See engineerfoots letter and drawings for specific information. Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 10, 2012 | Current use: Multifamily dwellings, existing | Permit id: Pmt2011-05144 |