Building Permits at 33 Arch St Boston MA


Estimated Price

Beds

Baths

Rooms

Sq.Ft.

Built:   Lot size:   Taxed:
RENOVATION HISTORY
Based on the information received from building department, associated with 33 Arch St Boston MA over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
Installing security system.
Date:  July 7, 2010
Value:   $3,000

Client: Arch St Tower L | Permit type: Erect | Current use: Comm | Permit id: Elv32160 | Parcel: 304643010
2010/07/0730009533 Arch St Boston Ma 02110
SCORE
89
Fire alarm for cbre tenant space fit up. Job #9453
Date:  August 4, 2010
Value:   $2,000
Contractor: Arthur Murphy

Client: Arch St Tower L | Permit type: Electrical | Current use: Comm | Permit id: Efa36590 | Parcel: 304643020
2010/08/0420008933 Arch St Boston Ma 02110Arthur Murphy
SCORE
98
Install 1 sink and heater
Date:  August 12, 2010
Value:   $5,000
Contractor: Joseph Kennedy

Client: Arch St Tower L | Permit type: Plumbing | Current use: Comm | Permit id: Pl37201 | Parcel: 304643010
2010/08/1250009833 Arch St Boston Ma 02110Joseph Kennedy
Offices retail restaurant c o-for offices 21st. Fl. -only alt 43611 issued 10 7 10
Date:  March 11, 2011

Client: Arch St Tower L | Current use: Comm | Permit id: Coo64654 | Parcel: 304643010
2011/03/1109533 Arch St Boston Ma 02110
SCORE
100
Fire alarm
Date:  March 24, 2011
Value:   $3,500
Contractor: Karen Sykes

Client: Arch St Tower L | Permit type: Fire alarm | Current use: Comm | Permit id: Efa69102 | Parcel: 304643020
2011/03/24350010033 Arch St Boston Ma 02110Karen Sykes
SCORE
95
Job numbers 9093 &; 9094 - cbre 33 arch street 32nd floor - nstar to install 100 amp meter
Date:  May 20, 2011
Value:   $2,000
Contractor: Brian Murphy

Client: Arch St Tower L | Permit type: Electrical | Current use: Comm | Permit id: E77605 | Parcel: 304643010
2011/05/2020009533 Arch St Boston Ma 02110Brian Murphy
SCORE
100
Fire alarm 32st floor
Date:  January 6, 2012
Value:   $1,500
Contractor: Karen Sykes

Client: Arch St Tower L | Permit type: Fire alarm | Current use: Comm | Permit id: Efa113138 | Parcel: 304643020
2012/01/06150010033 Arch St Boston Ma 02110Karen Sykes
SCORE
95
Job number 10163 - cbre 33 arch street floors 10 and 28 - demo office space
Date:  April 12, 2012
Value:   $10,000
Contractor: Brian Murphy

Client: Arch St Tower L | Permit type: Electrical | Current use: Comm | Permit id: E130832 | Parcel: 304643020
2012/04/12100009533 Arch St Boston Ma 02110Brian Murphy
SCORE
96
Renovation to 10th & 28th floors
Date:  May 14, 2012
Value:   $350,000
Contractor: Barbara Ensign

Client: Arch St Tower L | Permit type: Electrical | Current use: Comm | Permit id: E135569 | Parcel: 304643020
2012/05/143500009633 Arch St Boston Ma 02110Barbara Ensign
SCORE
100
Fast track permit : renovations to existing office space on the 9th floor to include selective demo of finishes install new carpet ceiling paint added fire alarm devices sprinkler relocates. Fast track permit
Date:  October 4, 2012
Value:   $100,000

Client: Arch St Tower L | Permit type: Fast track applicati | Current use: Mixed | Permit id: Alt185381 | Parcel: 304643020
2012/10/0410000010033 Arch St Boston Ma 02110Christina Guarnotta
SCORE
100
Legal occupancy:; offices retail restaurant. Coo for offices on the 9th floor. Alt185381 issued: 10 4 12
Date:  November 16, 2012
Value:   $99,150

Client: Arch St Tower L | Permit id: Coo199769 | Parcel: 304643010
2012/11/169915010033 Arch St Boston Ma 02110Christina Guarnotta
SCORE
100
Build out of spec suite on the 30th floor. Work to include selective demo install new finishes mep upgrades sprinkler relocates fire alarm modifications. Fast track all work per plans.
Date:  May 30, 2013
Value:   $50,000

Client: Arch St Tower L | Permit type: Fast track applicati | Current use: Comm | Permit id: Alt245537 | Parcel: 304643020
2013/05/305000010033 Arch St Boston Ma 02110Christina Guarnotta
SCORE
100
Build out of spec suite on the 32nd floor. Work to include new finishes sprinkler relocates mep upgrades fire alarm modifications. Fast track all work per plans.
Date:  May 30, 2013
Value:   $100,000

Client: Arch St Tower L | Permit type: Fast track applicati | Current use: Comm | Permit id: Alt245531 | Parcel: 304643020
2013/05/3010000010033 Arch St Boston Ma 02110Christina Guarnotta
SCORE
100
Insight global - 11th floor -; tenant build out of new offices conference room and open area in vacant space.; work includes selective demo of finishes new finishes mep upgrades new lighting and;relocates to the sprinkler;and fire alarm system.;
Date:  June 18, 2013
Value:   $250,000

Client: Arch St Tower L | Permit type: Fast track applicati | Current use: Comm | Permit id: Alt252131 | Parcel: 304643010
2013/06/1825000010033 Arch St Boston Ma 02110Christina Guarnotta
SCORE
100
Legal occupancy:; offices retail restaurant alt20931 2013 coo for offices on the;11th floor (global insight) alt252131 issued: 6 18 13
Date:  September 5, 2013
Value:   $250,000

Client: Arch St Tower L | Permit type: Fast track applicati | Current use: Comm | Permit id: Coo279768 | Parcel: 304643010
2013/09/0525000010033 Arch St Boston Ma 02110Christina Guarnotta
Install conduit; [ contractor waveguide]; approved by nstar; 20 x 2; all work 8 am to 4 pm; bosdyon police area a; 343-4239; ; cobucs #; 1380126782680;
Date:  November 7, 2013

Client: Arch St Tower L | Permit type: Service | Permit id: Exca-30162 | Parcel: 304643010
2013/11/0709533 Arch St Boston Ma 02110
SCORE
100
Minor renovations to office space on the 20th floor to include selective demo construct 2 new walls 2 electrical outlets 2 sprinkler relocates no fire alarm egress not affected.
Date:  December 12, 2013
Value:   $15,000

Client: Arch St Tower L | Permit type: Renovations -interio | Current use: Comm | Permit id: Sf312307 | Parcel: 304643020
2013/12/121500010033 Arch St Boston Ma 02110Christina Guarnotta
Reset vault top level to surrounding pavement; 7 x 10 sdwk only; all work 7am-7pm
Date:  June 19, 2014

Client: Arch St Tower L | Permit type: Maintenance | Permit id: Exca-37453 | Parcel: 304643020
2014/06/1909533 Arch St Boston Ma 02110
SCORE
100
Renovation of existing tenant space on the 30th floor for tek systems. Work to include new offices conference rooms and pantry. All new flooring paint and millwork. Relocated sprinkler heads new fire alarm.
Date:  June 27, 2014
Value:   $225,000

Client: Arch St Tower L | Permit type: Fast track applicati | Current use: Comm | Permit id: Alt376672 | Parcel: 304643020
2014/06/2722500010033 Arch St Boston Ma 02110Christina Guarnotta
Offices retail restaurant co-for offices 21st. Fl. -only alt 43611 issued 10710
Date:  March 11, 2011

Permit status: Expired | Current use: Comm | Permit id: Coo64654 | Parcel: 0304643020
2011/03/1109533 Arch St Boston Ma 02110
Installing security system.
Date:  July 7, 2010
Value:   $3,000

Permit type: Erect | Permit status: Expired | Current use: Comm | Permit id: Elv32160 | Parcel: 0304643010
2010/07/0730009533 Arch St Boston Ma 02110
Install new data cable and terminate
Date:  May 15, 2015
Value:   $15,000

Permit type: Low voltage | Permit status: Expired | Current use: Comm | Permit id: Elv473325 | Parcel: 0304643010
2015/05/15150009533 Arch St Boston Ma 02110
Installation of security devices.
Date:  July 9, 2015
Value:   $4,758

Permit type: Low voltage | Permit status: Open | Current use: Comm | Permit id: Elv490677 | Parcel: 0304643010
2015/07/0947589533 Arch St Boston Ma 02110
SCORE
100
11 th floor
Date:  September 21, 2015
Value:   $3,000
Contractor: Karen Sykes

Permit type: Fire alarm | Permit status: Open | Current use: Comm | Permit id: Efa521227 | Parcel: 0304643010
2015/09/21300010033 Arch St Boston Ma 02110Karen Sykes
Install conduit; x 12"; rdwy; guar 2012; lateral policy approved by pic; (tl); 7am-7pm; boston police detail area a 343-4239; (1); extension
Date:  October 28, 2015

Permit type: Service | Permit status: Expired | Permit id: Exca-533858 | Parcel: 0304643010
2015/10/2809533 Arch St Boston Ma 02110
Installation of floo
Date:  May 21, 2015

Permit status: Na | Permit id: Chm470603 | Parcel: 0304643020
2015/05/2109533 Arch St Boston Ma 02110
Installation of new av and smoke detection for tenant renovation; ~; doc 20141112
Date:  August 18, 2014

Permit status: Na | Permit id: Bfdf393828 | Parcel: 0304643020
2014/08/1809533 Arch St Boston Ma 02110
Relocate 18 sprinklers
Date:  October 19, 2012

Permit status: Na | Permit id: Sprk191380 | Parcel: 0304643020
2012/10/1909533 Arch St Boston Ma 02110
Installation of floo
Date:  June 7, 2012

Permit status: Na | Permit id: Chm149251 | Parcel: 0304643010
2012/06/0709533 Arch St Boston Ma 02110
Installation of floo
Date:  June 7, 2012

Permit status: Na | Permit id: Chm149257 | Parcel: 0304643020
2012/06/0709533 Arch St Boston Ma 02110
Renovation of space requiring device relocations and additions. Doc#20130764
Date:  July 19, 2013

Permit status: Na | Permit id: Bfdf259024 | Parcel: 0304643020
2013/07/1909533 Arch St Boston Ma 02110
Bagging of smoke detectors
Date:  July 30, 2015

Permit status: Na | Permit id: Bsd497175 | Parcel: 0304643020
2015/07/3009533 Arch St Boston Ma 02110
Relocate;53 existing sprinklers and add 5 new to ceiling grid. Total of 58 sprinkler heads.; work to be done per nfpa stands. One floor zone at a time.
Date:  July 10, 2013

Permit status: Na | Permit id: Sprk260700 | Parcel: 0304643020
2013/07/1009533 Arch St Boston Ma 02110
Temporary bagging of smoke detectors during renovations.
Date:  December 17, 2014

Permit status: Na | Permit id: Bsd434491 | Parcel: 0304643020
2014/12/1709533 Arch St Boston Ma 02110
Temporary bagging of smoke detectors
Date:  December 18, 2014

Permit status: Na | Permit id: Bsd435299 | Parcel: 0304643010
2014/12/1809533 Arch St Boston Ma 02110
Installation shall be inaccordance with the requirements of nfpa 13 and 7 cmr. Only one floor shall be impaired at any given time.
Date:  July 21, 2014

Permit status: Na | Permit id: Sprk381878
2014/07/2109533 Arch St Boston Ma 02110
Only one floor shall be impaired at any given time..... Installation shall comply with 7 cmr and nfpa 13
Date:  January 8, 2015

Permit status: Na | Permit id: Sprk435731 | Parcel: 0304643020
2015/01/0809533 Arch St Boston Ma 02110
Relocate 27 sprinklers on 31st floor. Work to be done one floor zone at a time per nfpa 13 stands 7 cmr.
Date:  April 4, 2011

Permit status: Na | Permit id: Sprk70315 | Parcel: 0304643010
2011/04/0409533 Arch St Boston Ma 02110
Street occupancy
Date:  March 19, 2013

Permit status: Expired | Permit id: Occu-228078 | Parcel: 0304643020
2013/03/1909533 Arch St Boston Ma 02110
Erect and maintain protective staging on sidewalk; ; working hrs; 7 am to 4 pm
Date:  June 22, 2015

Permit type: Staging | Permit status: Expired | Permit id: Occu-486526 | Parcel: 0304643010
2015/06/2209533 Arch St Boston Ma 02110
Relocate (13) existing sprinkler heads &; add (3) new to new ceiling grid.
Date:  June 7, 2012

Permit status: Na | Permit id: Sprk146095 | Parcel: 0304643010
2012/06/0709533 Arch St Boston Ma 02110
Relocate sprinkler piping and heads for new floor plan on the 21st floor coordinate;with building management so that only one floor is impaired within the building at any time
Date:  November 29, 2010

Permit status: Na | Permit id: Sprk52796 | Parcel: 0304643010
2010/11/2909533 Arch St Boston Ma 02110
Relocate (10) sprinklers on;32nd floor
Date:  January 18, 2012

Permit status: Na | Permit id: Sprk113292 | Parcel: 0304643010
2012/01/1809533 Arch St Boston Ma 02110
Relocate (24) existing sprinklers heads &; add (5) new sprinkler heads to new ceiling grid
Date:  June 7, 2012

Permit status: Na | Permit id: Sprk146078 | Parcel: 0304643010
2012/06/0709533 Arch St Boston Ma 02110
Temporary bagging of smoke detectors for dust conrol during renovation work
Date:  July 22, 2013

Permit status: Na | Permit id: Bsd265343 | Parcel: 0304643020
2013/07/2209533 Arch St Boston Ma 02110
Demo to include drywall &; finish work (cbre) secure any floor openings
Date:  March 26, 2012

Permit status: Na | Permit id: Fdc126512 | Parcel: 0304643010
2012/03/2609533 Arch St Boston Ma 02110
Relocate existing sprinkler heads to new ceiling grid. Work to be done per nfpa stands. 7 cmr. Work to be done one floor zone at a time.
Date:  March 7, 2012

Permit status: Na | Permit id: Sprk121190 | Parcel: 0304643010
2012/03/0709533 Arch St Boston Ma 02110
Tenant re-fit:; 1 heads relocated on 10th floor heads relocated on 28th floor. Work to be done one floor zone at a time per nfpa stands. 7 cmr.
Date:  May 18, 2012

Permit status: Na | Permit id: Sprk138330 | Parcel: 0304643010
2012/05/1809533 Arch St Boston Ma 02110
SCORE
100
Relocations of av and smoke detection for tenant renovation.
Date:  June 3, 2015
Contractor: William Weber

Permit type: Bfd other | Permit status: Na | Permit id: Bfdf466219 | Parcel: 0304643020
2015/06/03010033 Arch St Boston Ma 02110William Weber
Temporary bagging of smoke detectors for dust control during construction
Date:  January 30, 2012

Permit status: Na | Permit id: Bsd115571 | Parcel: 0304643010
2012/01/3009533 Arch St Boston Ma 02110
Relocate (4) sprinklers for new ceiling work 32nd floor
Date:  August 6, 2010

Permit status: Na | Permit id: Sprk34564 | Parcel: 0304643020
2010/08/0609533 Arch St Boston Ma 02110
Renovation to existing office space on 9th floor; ~; doc# 20121242
Date:  November 7, 2012

Permit status: Na | Permit id: Bfdf193956 | Parcel: 0304643010
2012/11/0709533 Arch St Boston Ma 02110
Coordinate impairment with the buildings impairment coordinator (required by 527 cmr 1. Section 16. 3) so that only one zone is impaired at any given time within the building... Installation shall comply with 7 cmr and nfpa 13
Date:  August 14, 2015

Permit type: Bfd other | Permit status: Na | Permit id: Sprk504352 | Parcel: 0304643020
2015/08/1409533 Arch St Boston Ma 02110
Install new dry valves on standpipe in garage in accordance with isd approved sprinkler plans
Date:  November 14, 2013

Permit status: Na | Permit id: Sprk301097 | Parcel: 0304643010
2013/11/1409533 Arch St Boston Ma 02110
Install speakerstrobes pull station &; booster; ~; doc# 20120691
Date:  June 18, 2012

Permit status: Na | Permit id: Bfdf149926 | Parcel: 0304643010
2012/06/1809533 Arch St Boston Ma 02110
Installation of floo
Date:  August 29, 2013

Permit status: Na | Permit id: Chm266708 | Parcel: 0304643010
2013/08/2909533 Arch St Boston Ma 02110
Temporary bagging of smoke detectors
Date:  April 14, 2015

Permit status: Na | Permit id: Bsd461880 | Parcel: 0304643020
2015/04/1409533 Arch St Boston Ma 02110
New tenant moving into existing space - relocation of 1 av and 1 smoke detection device required for renovation; ~; doc# 20140245
Date:  June 11, 2014

Permit status: Na | Permit id: Bfdf363015 | Parcel: 0304643010
2014/06/1109533 Arch St Boston Ma 02110
Installation inaccordance with nfpa 13 and 7 cmr only one floor shall be impaired at any given time
Date:  June 4, 2014

Permit status: Na | Permit id: Sprk365367 | Parcel: 0304643010
2014/06/0409533 Arch St Boston Ma 02110
Relocate one speaker strobe only due to wall relocation. Work to be done per nfpa stands 7 cmr. ; ~; doc# 20150045
Date:  February 26, 2015

Permit status: Na | Permit id: Bfdf443330 | Parcel: 0304643020
2015/02/2609533 Arch St Boston Ma 02110
Installation of inte
Date:  November 7, 2013

Permit status: Na | Permit id: Chm293280 | Parcel: 0304643020
2013/11/0709533 Arch St Boston Ma 02110
Install speaker strobes &; booster; ~; doc# 20120692
Date:  June 28, 2012

Permit status: Na | Permit id: Bfdf149918 | Parcel: 0304643020
2012/06/2809533 Arch St Boston Ma 02110
SCORE
100
Installation of new av for tenant renovation to be completed in (3) floors one floor at a time.; 24 th floor 116 23 rd floor 516 22nd floor 9 16. Work per nfpa stands 7 cmr no occupancy on impaired floor. ;
Date:  December 22, 2015
Contractor: William Weber

Permit type: Bfd other | Permit status: Na | Permit id: Bfdf532703 | Parcel: 0304643010
2015/12/22010033 Arch St Boston Ma 02110William Weber
Temporary bagging of smoke detectors for dust control during renovation work
Date:  July 8, 2013

Permit status: Na | Permit id: Bsd259038 | Parcel: 0304643020
2013/07/0809533 Arch St Boston Ma 02110
Renovation of space requiring;2 av relocation. Doc#20130836
Date:  July 25, 2013

Permit status: Na | Permit id: Bfdf264615 | Parcel: 0304643010
2013/07/2509533 Arch St Boston Ma 02110
Installation of new av and smoke detection for tenant renovation;(floor 30); ~; doc# 20140927
Date:  August 7, 2014

Permit status: Na | Permit id: Bfdf382049 | Parcel: 0304643010
2014/08/0709533 Arch St Boston Ma 02110
Date:  April 9, 2015

Permit status: Na | Permit id: Alfob461005 | Parcel: 0304643010
2015/04/0909533 Arch St Boston Ma 02110
Relocate 14 sprinkler heads. Work to be done per nfpa stands 7 cmr one floor zone at a time.
Date:  July 22, 2013

Permit status: Na | Permit id: Sprk261473 | Parcel: 0304643010
2013/07/2209533 Arch St Boston Ma 02110
Test
Date:  June 6, 2012

Permit type: Installation of floo | Permit status: Na | Permit id: Chm148469 | Parcel: 0304643010
2012/06/0609533 Arch St Boston Ma 02110
Relocate (85) sprinklers 11th floor
Date:  August 13, 2010

Permit status: Na | Permit id: Sprk37505 | Parcel: 0304643020
2010/08/1309533 Arch St Boston Ma 02110
Install speaker strobes on 32nd floor; ~; doc# 20120026
Date:  February 8, 2012

Permit status: Na | Permit id: Bfdf114162 | Parcel: 0304643020
2012/02/0809533 Arch St Boston Ma 02110
Only one zone shall be impaired at any given time within the building.
Date:  May 11, 2015

Permit type: Bfd other | Permit status: Na | Permit id: Sprk464501 | Parcel: 0304643010
2015/05/1109533 Arch St Boston Ma 02110
Renovation of space requiring 4 new av and 2 smokes. Doc#20130837
Date:  July 25, 2013

Permit status: Na | Permit id: Bfdf264613 | Parcel: 0304643010
2013/07/2509533 Arch St Boston Ma 02110
Installing 3 new addressable monitor modules for the new dry sprinkler system being installed by sprinkler contractor doc20131530 work to be done per nfpa stands 7 cmr.
Date:  February 10, 2014

Permit status: Na | Permit id: Bfdf324963 | Parcel: 0304643020
2014/02/1009533 Arch St Boston Ma 02110
Relocation of existing sprinkler heads to accommodate new ceiling layout 32nd floor
Date:  February 25, 2011

Permit status: Na | Permit id: Sprk64365 | Parcel: 0304643020
2011/02/2509533 Arch St Boston Ma 02110
Relocate (3) sprinklers for new ceiling work.
Date:  April 25, 2012

Permit status: Na | Permit id: Sprk131050
2012/04/2509533 Arch St Boston Ma 02110
SCORE
100
Demo and rebuild of walls floors ceiling stairs and doors. Also to include carpet and paint
Date:  August 25, 2015
Contractor: Regina Olivieri

Permit type: Bfd other | Permit status: Na | Permit id: Fdc506464 | Parcel: 0304643010
2015/08/25010033 Arch St Boston Ma 02110Regina Olivieri
SCORE
82
Installing/relocating audio/visual in tenant space.; 21st floor
Date:  September 2, 2015

Permit type: Bfd other | Permit status: Na | Permit id: Bfdf502872 | Parcel: 0304643020
2015/09/0208233 Arch St Boston Ma 02110Erica Burgos J And M Brown Company
Relocate 3 sprinklers on the 22 23 and 24th floors.; work to be done per nfpa stands. 7 cmr. One floor zone at a time.
Date:  September 22, 2015

Permit type: Bfd other | Permit status: Na | Permit id: Sprk520460 | Parcel: 0304643020
2015/09/2209533 Arch St Boston Ma 02110
Installation of (2) speaker/ strobe devices (1) strobe only device (1) remote alarm indicator ans (1) addressable smoke detector doc#20100683
Date:  August 19, 2010

Permit status: Na | Permit id: Bfdf37672 | Parcel: 0304643020
2010/08/1909533 Arch St Boston Ma 02110
Renovations to include drywall glass doors &;flooring
Date:  July 19, 2013

Permit status: Na | Permit id: Fdc262908 | Parcel: 0304643010
2013/07/1909533 Arch St Boston Ma 02110
Installation of floo
Date:  September 16, 2015

Permit status: Na | Permit id: Chm515769 | Parcel: 0304643020
2015/09/1609533 Arch St Boston Ma 02110
Demo/renovations of existing space to include drywall ceiling paint &; flooring
Date:  December 23, 2013

Permit status: Na | Permit id: Fdc312482 | Parcel: 0304643010
2013/12/2309533 Arch St Boston Ma 02110
Selective demo of one office interior finishes relocate
Date:  May 20, 2014

Permit status: Na | Permit id: Fdc362560 | Parcel: 0304643010
2014/05/2009533 Arch St Boston Ma 02110
Offices retail restaurant c/o-for offices 21st. Fl. -only alt 43611 issued 10/7/10
Date:  March 11, 2011

Permit status: Na | Current use: Comm | Permit id: Coo64654 | Parcel: 0304643020
2011/03/1109533 Arch St Boston Ma 02110
Installation of inte
Date:  August 4, 2014

Permit status: Na | Permit id: Chm387598 | Parcel: 0304643010
2014/08/0409533 Arch St Boston Ma 02110
Bagging of smoke detectors
Date:  November 18, 2010

Permit status: Na | Permit id: Bsd51942 | Parcel: 0304643020
2010/11/1809533 Arch St Boston Ma 02110
Close portion of arch st from franklin to milk; 504 for placement of a crane; boston police area a; 343-4239
Date:  August 12, 2015

Permit type: Cranes | Permit status: Expired | Permit id: Occu-486524 | Parcel: 0304643010
2015/08/1209533 Arch St Boston Ma 02110
Renovations to include drywall patching &; paint
Date:  July 5, 2012

Permit status: Na | Permit id: Fdc159172 | Parcel: 0304643010
2012/07/0509533 Arch St Boston Ma 02110
Demo of existing for new layout to include drywall partitions millwork flooring paint &; interior glazing
Date:  April 14, 2015

Permit status: Na | Permit id: Fdc461885 | Parcel: 0304643020
2015/04/1409533 Arch St Boston Ma 02110
Installation of floo
Date:  November 15, 2012

Permit status: Na | Permit id: Chm200448 | Parcel: 0304643020
2012/11/1509533 Arch St Boston Ma 02110
Work to include selective demo drywall and ceiling patching flooring and paint
Date:  December 18, 2014

Permit status: Na | Permit id: Fdc435309 | Parcel: 0304643010
2014/12/1809533 Arch St Boston Ma 02110
Install smoke detectors and speaker strobes - doc 20110365
Date:  April 25, 2011

Permit status: Na | Permit id: Bfdf70618 | Parcel: 0304643010
2011/04/2509533 Arch St Boston Ma 02110
Temporary bagging of smoke detectors for dust control during construction / renovation work
Date:  January 26, 2011

Permit status: Na | Permit id: Bsd61447 | Parcel: 0304643020
2011/01/2609533 Arch St Boston Ma 02110
SCORE
100
Abandoned by christina - 5-30-2013 build out of spec suite on the 11th floor. Work to include selective demo of finishes new finishes new kitchen area it room/electrical closet conference room new lighting hvac plumbing sprinkler relocates fire alarm. Fast track. As per plans
Date:  April 2, 2013
Value:   $300,000

Permit type: Fast track applicati | Permit status: Expired | Current use: Comm | Permit id: Alt230374 | Parcel: 0304643020
2013/04/0230000010033 Arch St Boston Ma 02110Garland Building Company
Bagging of smoke detectors
Date:  September 3, 2014

Permit status: Na | Permit id: Bsd230519 | Parcel: 0304643020
2014/09/0309533 Arch St Boston Ma 02110
Cutting &; welding for modifications/repairs to the base bldg piping &; mechanical systems (dpl) bfd paid detail required
Date:  December 31, 2012

Permit status: Na | Permit id: Cbw209116 | Parcel: 0304643020
2012/12/3109533 Arch St Boston Ma 02110
Installation of inte
Date:  August 29, 2013

Permit status: Na | Permit id: Chm264267 | Parcel: 0304643010
2013/08/2909533 Arch St Boston Ma 02110
Stand boiler at curb; two spaces
Date:  April 2, 2015

Permit type: Street occupancy | Permit status: Expired | Permit id: Occu-459514
2015/04/0209533 Arch St Boston Ma 02110
Walls ceiling flooring
Date:  August 5, 2010

Permit status: Na | Permit id: Fdc36547 | Parcel: 0304643010
2010/08/0509533 Arch St Boston Ma 02110
Demo/office renovations;to include drywall painting ceiling &; flooring etc
Date:  December 30, 2011

Permit status: Na | Permit id: Fdc112054 | Parcel: 0304643020
2011/12/3009533 Arch St Boston Ma 02110
Install boosters speakers strobes smoke detectors pull stations doc20120568
Date:  June 18, 2012

Permit status: Na | Permit id: Bfdf141246 | Parcel: 0304643010
2012/06/1809533 Arch St Boston Ma 02110
To conduct the following: repair concrete parking garage deck waterproofing &; sealants for storage of propane (4) 33lbs tanks in saf-t-stor cylinder cabinet
Date:  August 21, 2015

Permit type: Bfd other | Permit status: Na | Permit id: Gp510634 | Parcel: 0304643020
2015/08/2109533 Arch St Boston Ma 02110
Tenant fit-out add a/v and initiating devices to floor doc#20110114
Date:  February 8, 2011

Permit status: Na | Permit id: Bfdf62443 | Parcel: 0304643010
2011/02/0809533 Arch St Boston Ma 02110
SCORE
100
Demo/renovations to office space on the 11th floor to include drywall painting ceiling flooring
Date:  September 22, 2015

Permit type: Bfd other | Permit status: Na | Permit id: Fdc521288 | Parcel: 0304643020
2015/09/22010033 Arch St Boston Ma 02110Garland Building Company
Cutting / welding for installation of two hinges and brackets for loading dock freight doors bfd paid detail required
Date:  September 4, 2013

Permit status: Na | Permit id: Cbw278156 | Parcel: 0304643020
2013/09/0409533 Arch St Boston Ma 02110
Demolition / renovation of existing office;space to inlcude drywall ceiling paint and flooring
Date:  July 8, 2013

Permit status: Na | Permit id: Fdc259037 | Parcel: 0304643010
2013/07/0809533 Arch St Boston Ma 02110
SCORE
100
Drywall painting ceiling flooring for demo/office renovations
Date:  July 24, 2015

Permit type: Bfd other | Permit status: Na | Permit id: Fdc496717 | Parcel: 0304643010
2015/07/24010033 Arch St Boston Ma 02110Garland Building Company
Temporary bagging of smoke detectors for dust control during construction work
Date:  August 25, 2015

Permit status: Na | Permit id: Bsd506491 | Parcel: 0304643010
2015/08/2509533 Arch St Boston Ma 02110
Bagging of smoke detectors
Date:  April 30, 2012

Permit status: Na | Permit id: Bsd135697 | Parcel: 0304643010
2012/04/3009533 Arch St Boston Ma 02110
Brazing for removal of compressor filter dryer &; expansion valve bfd paid detail required
Date:  May 2, 2014

Permit status: Na | Permit id: Cbw356072 | Parcel: 0304643010
2014/05/0209533 Arch St Boston Ma 02110
Renovation work to include drywall paint and finish work
Date:  September 30, 2010

Permit status: Na | Permit id: Fdc44511 | Parcel: 0304643010
2010/09/3009533 Arch St Boston Ma 02110
Demo to include drywall of partitions &; interior finishes
Date:  July 16, 2014

Permit status: Na | Permit id: Fdc382370 | Parcel: 0304643010
2014/07/1609533 Arch St Boston Ma 02110
Install conduit; [ contractor waveguide]; approved by nstar; x 2; all work 8 am to 4 pm; bosdyon police area a; 343-4239; / cobucs #; 1380126782680;
Date:  November 7, 2013

Permit type: Service | Permit status: Expired | Permit id: Exca-301625 | Parcel: 0304643020
2013/11/0709533 Arch St Boston Ma 02110
Install smoke detector &; speaker strobes - doc 20110366
Date:  April 25, 2011

Permit status: Na | Permit id: Bfdf70628 | Parcel: 0304643010
2011/04/2509533 Arch St Boston Ma 02110
Renovation to include drywall partitions carpet paint and;millwork (secure any floor openings)
Date:  May 11, 2012

Permit status: Na | Permit id: Fdc140059 | Parcel: 0304643020
2012/05/1109533 Arch St Boston Ma 02110
Reset vault top level to surrounding pavement; 7 x sdwk only; all work 7am-7pm
Date:  June 19, 2014

Permit type: Maintenance | Permit status: Expired | Permit id: Exca-374539 | Parcel: 0304643010
2014/06/1909533 Arch St Boston Ma 02110
To conduct the following: store 2 gallons of diesel fuel used for temporary generator power for film shoot "unfinished business"
Date:  October 3, 2014

Permit type: Bfd other | Permit status: Na | Permit id: Gp413857 | Parcel: 0304643020
2014/10/0309533 Arch St Boston Ma 02110
Temporary bagging of smoke detectors for dust control during construction
Date:  January 5, 2012

Permit status: Na | Permit id: Bsd112302 | Parcel: 0304643010
2012/01/0509533 Arch St Boston Ma 02110
Renovations for;new tenant to include demo drywall new walls ceilings &; finishes
Date:  January 30, 2012

Permit status: Na | Permit id: Fdc116058 | Parcel: 0304643020
2012/01/3009533 Arch St Boston Ma 02110
Stand moving truck at curb; one space
Date:  August 7, 2012

Permit type: Street occupancy | Permit status: Expired | Permit id: Occu-170343 | Parcel: 0304643010
2012/08/0709533 Arch St Boston Ma 02110
Temporary bagging of smoke detectors for dust control during construction
Date:  January 5, 2012

Permit status: Na | Permit id: Bsd112417 | Parcel: 0304643010
2012/01/0509533 Arch St Boston Ma 02110
Renovation / modification to include construction of (3) new offices with non-load bearing partitions accoustical ceilings and paint
Date:  April 11, 2012

Permit status: Na | Permit id: Fdc129592 | Parcel: 0304643010
2012/04/1109533 Arch St Boston Ma 02110
Bagging of smoke detectors;(maintain log &; security)
Date:  May 24, 2010

Permit status: Na | Permit id: Bsd26737 | Parcel: 0304643020
2010/05/2409533 Arch St Boston Ma 02110
Installation of (1) control module (5) horn/ strobe devices doc#20100658
Date:  August 16, 2010

Permit status: Na | Permit id: Bfdf37086 | Parcel: 0304643010
2010/08/1609533 Arch St Boston Ma 02110
Renovations to include new finishes millwork partitions &; minor meps
Date:  March 14, 2011

Permit status: Na | Permit id: Fdc66860 | Parcel: 0304643010
2011/03/1409533 Arch St Boston Ma 02110
Burning &; welding for modification/repairs to base bldg piping &; mechanical systems bfd paid detail required
Date:  April 17, 2013

Permit status: Na | Permit id: Cbw233970 | Parcel: 0304643010
2013/04/1709533 Arch St Boston Ma 02110
Renovations to include drywall &; finishes
Date:  August 27, 2010

Permit status: Na | Permit id: Fdc39895 | Parcel: 0304643020
2010/08/2709533 Arch St Boston Ma 02110
Demo/renovations of existing office space to include drywall ceiling paint &; flooring
Date:  October 15, 2012

Permit status: Na | Permit id: Fdc189831 | Parcel: 0304643020
2012/10/1509533 Arch St Boston Ma 02110
On-going constructionon on 21st floor
Date:  September 20, 2010

Permit status: Na | Permit id: Bsd43053 | Parcel: 0304643010
2010/09/2009533 Arch St Boston Ma 02110
Renovations on the 20th floor to include minor demo of non bearing office partitions removal of flooring &; ceilings. Patching ceilings walls building new partitions lighting &; finishes
Date:  December 17, 2014

Permit status: Na | Permit id: Fdc434495 | Parcel: 0304643010
2014/12/1709533 Arch St Boston Ma 02110
Temporary bagging of smoke detectors for dust control during mainentance work (sweeping / cleaning)
Date:  February 25, 2013

Permit status: Na | Permit id: Bsd221627 | Parcel: 0304643010
2013/02/2509533 Arch St Boston Ma 02110
Construction / renovation of office build out of existing office space
Date:  January 26, 2011

Permit status: Na | Permit id: Fdc61445 | Parcel: 0304643010
2011/01/2609533 Arch St Boston Ma 02110
Welding of stairwell post column lines a-b ;3-4 c-e d;to;include 4 &; 7 (garage) ; bfd paid detail required
Date:  September 11, 2012

Permit status: Na | Permit id: Cbw181230 | Parcel: 0304643010
2012/09/1109533 Arch St Boston Ma 02110
Drywall partition ceiling flooring electrical and sprinkler
Date:  August 5, 2010

Permit status: Na | Permit id: Fdc36538 | Parcel: 0304643010
2010/08/0509533 Arch St Boston Ma 02110
Bagging of smoke detectors due to general maintainence
Date:  January 28, 2010

Permit status: Na | Permit id: Bsd12434 | Parcel: 0304643020
2010/01/2809533 Arch St Boston Ma 02110
Bagging of smoke detectors
Date:  October 15, 2012

Permit status: Na | Permit id: Bsd189835 | Parcel: 0304643010
2012/10/1509533 Arch St Boston Ma 02110
Selective removal of walls and new finishes
Date:  September 7, 2010

Permit status: Na | Permit id: Fdc41100 | Parcel: 0304643010
2010/09/0709533 Arch St Boston Ma 02110
Cutting &; welding for installation of support steel &; new;stairwell (dpl 5-1-2011); bfd paid detail required
Date:  November 30, 2010

Permit status: Na | Permit id: Cbw53227 | Parcel: 0304643010
2010/11/3009533 Arch St Boston Ma 02110
Prep demo remove walls ciling grid tiles and flooring on 11th floor
Date:  July 12, 2010

Permit status: Na | Permit id: Fdc33176 | Parcel: 0304643010
2010/07/1209533 Arch St Boston Ma 02110
Electrical low voltage
Date:  July 7, 2010
Value:   $3,000

Client: Arch St Tower L | Permit type: Erect | Current use: Comm | Permit id: Elv32160
2010/07/0730009533 Arch St Boston Ma 02110
SCORE
100
Electrical fire alarms
Date:  March 24, 2011
Value:   $3,500
Contractor: Karen Sykes

Client: Arch St Tower L | Permit type: Fire alarm | Current use: Comm | Permit id: Efa69090
2011/03/24350010033 Arch St Boston Ma 02110Karen Sykes
Certificate of occupancy
Date:  March 11, 2011

Client: Arch St Tower L | Current use: Comm | Permit id: Coo64654
2011/03/1109533 Arch St Boston Ma 02110
Excavation permit
Date:  October 28, 2015

Client: Arch St Tower L | Permit type: Service | Permit id: Exca-533858
2015/10/2809533 Arch St Boston Ma 02110
Electrical low voltage
Date:  July 9, 2015
Value:   $4,758

Client: Arch St Tower L | Permit type: Low voltage | Current use: Comm | Permit id: Elv490677
2015/07/0947589533 Arch St Boston Ma 02110
Electrical low voltage
Date:  May 15, 2015
Value:   $15,000

Client: Arch St Tower L | Permit type: Low voltage | Current use: Comm | Permit id: Elv473325
2015/05/15150009533 Arch St Boston Ma 02110
Offices retail restaurant c o-for offices 21st. Fl. -only alt 43611 issued 10 7 10
Date:  March 11, 2011

Client: T-C Arch St Llc | Permit status: Expired | Current use: Comm | Permit id: Coo64654 | Parcel: 0304643020
2011/03/1109533 Arch St Boston Ma 02110
SCORE
98
Plumbing permit
Date:  August 12, 2010
Value:   $5,000
Contractor: Joseph Kennedy

Client: T-C Arch St Llc | Permit type: Plumbing | Current use: Comm | Permit id: Pl37203
2010/08/1250009833 Arch St Boston Ma 02110Joseph Kennedy
SCORE
95
Electrical fire alarms
Date:  April 28, 2016
Value:   $1,800
Contractor: David Noon

Client: T-C Arch St Llc | Permit type: Fire alarm | Permit status: Expired | Current use: Comm | Permit id: Efa584628 | Parcel: 0304643010
2016/04/2818009533 Arch St Boston Ma 02110David Noon
SCORE
82
Concrete repairs to the garages facade. Work will include crack repairs repairs to spalled areas waterproofing and sealants.
Date:  July 14, 2017
Value:   $309,520
Contractor: Ronald Santosuosso

Client: T-C Arch St Llc | Permit type: Interior/exterior work | Permit status: Open | Current use: Comm | Permit id: Sf730257 | Parcel: 0304643020
2017/07/143095208233 Arch St Boston Ma 02110Ronald Santosuosso
SCORE
100
Electrical permit
Date:  January 6, 2011
Value:   $250
Contractor: Karen Sykes

Client: Arch St Tower L | Permit type: Electrical | Permit status: Expired | Current use: Comm | Permit id: E58037 | Parcel: 0304643020
2011/01/0625010033 Arch St Boston Ma 02110Karen Sykes
SCORE
100
Electrical permit
Date:  April 18, 2012
Value:   $8,000
Contractor: Karen Sykes

Client: Arch St Tower L | Permit type: Electrical | Permit status: Expired | Current use: Comm | Permit id: E130703 | Parcel: 0304643020
2012/04/18800010033 Arch St Boston Ma 02110Karen Sykes
SCORE
100
Electrical fire alarms
Date:  May 25, 2012
Value:   $1,500
Contractor: Karen Sykes

Client: Arch St Tower L | Permit type: Fire alarm | Permit status: Expired | Current use: Comm | Permit id: Efa144482 | Parcel: 0304643010
2012/05/25150010033 Arch St Boston Ma 02110Karen Sykes
SCORE
84
Electrical low voltage
Date:  July 22, 2013
Value:   $15,000
Contractor: Herbert Buchine

Client: Arch St Tower L | Permit type: Low voltage | Permit status: Expired | Current use: Comm | Permit id: Elv266012 | Parcel: 0304643020
2013/07/22150008433 Arch St Boston Ma 02110Herbert Buchine
SCORE
100
Electrical low voltage
Date:  April 18, 2012
Value:   $3,000
Contractor: Karen Sykes

Client: Arch St Tower L | Permit type: Low voltage | Permit status: Expired | Current use: Comm | Permit id: Elv130916 | Parcel: 0304643010
2012/04/18300010033 Arch St Boston Ma 02110Karen Sykes
SCORE
100
Electrical permit
Date:  January 6, 2012
Value:   $10,000
Contractor: Marc Frisoli

Client: Arch St Tower L | Permit type: Electrical | Permit status: Expired | Current use: Comm | Permit id: E113254 | Parcel: 0304643010
2012/01/061000010033 Arch St Boston Ma 02110Marc Frisoli
SCORE
100
Electrical permit
Date:  March 24, 2011
Value:   $14,000
Contractor: Karen Sykes

Client: Arch St Tower L | Permit type: Electrical | Permit status: Expired | Current use: Comm | Permit id: E69099 | Parcel: 0304643020
2011/03/241400010033 Arch St Boston Ma 02110Karen Sykes
SCORE
100
Electrical permit
Date:  July 23, 2015
Value:   $50,000
Contractor: Jeffrey Catalano

Client: Arch St Tower L | Permit type: Electrical | Permit status: Expired | Current use: Comm | Permit id: E497301 | Parcel: 0304643020
2015/07/235000010033 Arch St Boston Ma 02110Jeffrey Catalano
SCORE
100
Electrical fire alarms
Date:  December 23, 2013
Value:   $4,000
Contractor: Karen Sykes

Client: Arch St Tower L | Permit type: Fire alarm | Permit status: Expired | Current use: Comm | Permit id: Efa313683 | Parcel: 0304643020
2013/12/23400010033 Arch St Boston Ma 02110Karen Sykes
SCORE
100
Electrical low voltage
Date:  August 11, 2010
Value:   $1,300
Contractor: Kevin Flaherty

Client: Arch St Tower L | Permit type: Low voltage | Permit status: Expired | Current use: Comm | Permit id: Elv37011 | Parcel: 0304643020
2010/08/11130010033 Arch St Boston Ma 02110Kevin Flaherty
SCORE
95
Electrical fire alarms
Date:  May 18, 2010
Value:   $10,000
Contractor: David Noon

Client: Arch St Tower L | Permit type: Fire alarm | Permit status: Expired | Current use: Comm | Permit id: Efa26303 | Parcel: 0304643020
2010/05/18100009533 Arch St Boston Ma 02110David Noon
SCORE
95
Electrical low voltage
Date:  February 6, 2012
Value:   $725
Contractor: William Lemos

Client: Arch St Tower L | Permit type: Low voltage | Permit status: Expired | Current use: Comm | Permit id: Elv117712 | Parcel: 0304643010
2012/02/067259533 Arch St Boston Ma 02110William Lemos
SCORE
100
Electrical fire alarms
Date:  July 27, 2015
Value:   $3,000
Contractor: Karen Sykes

Client: Arch St Tower L | Permit type: Fire alarm | Permit status: Expired | Current use: Comm | Permit id: Efa498489 | Parcel: 0304643010
2015/07/27300010033 Arch St Boston Ma 02110Karen Sykes
SCORE
100
Electrical low voltage
Date:  March 28, 2012
Value:   $1,500
Contractor: Karen Sykes

Client: Arch St Tower L | Permit type: Low voltage | Permit status: Expired | Current use: Comm | Permit id: Elv126856 | Parcel: 0304643010
2012/03/28150010033 Arch St Boston Ma 02110Karen Sykes
SCORE
100
Electrical low voltage
Date:  January 8, 2015
Value:   $15,000
Contractor: Karen Sykes

Client: Arch St Tower L | Permit type: Low voltage | Permit status: Expired | Current use: Comm | Permit id: Elv439385 | Parcel: 0304643010
2015/01/081500010033 Arch St Boston Ma 02110Karen Sykes
SCORE
100
Electrical fire alarms
Date:  December 31, 2014
Value:   $1,000
Contractor: Ivy White

Client: Arch St Tower L | Permit type: Fire alarm | Permit status: Expired | Current use: Comm | Permit id: Efa438089 | Parcel: 0304643010
2014/12/31100010033 Arch St Boston Ma 02110Ivy White
SCORE
100
Electrical fire alarms
Date:  April 25, 2012
Value:   $18,500
Contractor: Karen Sykes

Client: Arch St Tower L | Permit type: Fire alarm | Permit status: Expired | Current use: Comm | Permit id: Efa135239 | Parcel: 0304643020
2012/04/251850010033 Arch St Boston Ma 02110Karen Sykes
SCORE
99
Electrical low voltage
Date:  April 11, 2011
Value:   $3,500
Contractor: Richard Penney

Client: Arch St Tower L | Permit type: Low voltage | Permit status: Expired | Current use: Comm | Permit id: Elv71619 | Parcel: 0304643010
2011/04/1135009933 Arch St Boston Ma 02110Richard Penney
SCORE
95
Electrical permit
Date:  November 18, 2010
Value:   $3,500
Contractor: David Noon

Client: Arch St Tower L | Permit type: Electrical | Permit status: Expired | Current use: Comm | Permit id: E52075 | Parcel: 0304643010
2010/11/1835009533 Arch St Boston Ma 02110David Noon
SCORE
99
Electrical low voltage
Date:  October 17, 2012
Value:   $6,000
Contractor: Richard Penney

Client: Arch St Tower L | Permit type: Low voltage | Permit status: Expired | Current use: Comm | Permit id: Elv190926 | Parcel: 0304643010
2012/10/1760009933 Arch St Boston Ma 02110Richard Penney
SCORE
95
Electrical fire alarms
Date:  November 18, 2010
Value:   $500
Contractor: David Noon

Client: Arch St Tower L | Permit type: Fire alarm | Permit status: Expired | Current use: Comm | Permit id: Efa52070 | Parcel: 0304643010
2010/11/185009533 Arch St Boston Ma 02110David Noon
SCORE
100
Electrical permit
Date:  March 24, 2011
Value:   $18,000
Contractor: Karen Sykes

Client: Arch St Tower L | Permit type: Electrical | Permit status: Expired | Current use: Comm | Permit id: E69095 | Parcel: 0304643010
2011/03/241800010033 Arch St Boston Ma 02110Karen Sykes
SCORE
100
Electrical fire alarms
Date:  May 25, 2012
Value:   $700
Contractor: Karen Sykes

Client: Arch St Tower L | Permit type: Fire alarm | Permit status: Expired | Current use: Comm | Permit id: Efa144472 | Parcel: 0304643010
2012/05/2570010033 Arch St Boston Ma 02110Karen Sykes
SCORE
100
Plumbing permit
Date:  May 25, 2010
Value:   $18,000
Contractor: Kevin Almeida

Client: Arch St Tower L | Permit type: Plumbing | Permit status: Expired | Current use: Comm | Permit id: Pl27046 | Parcel: 0304643020
2010/05/251800010033 Arch St Boston Ma 02110Kevin Almeida
SCORE
95
Electrical permit
Date:  September 16, 2010
Value:   $15,000
Contractor: David Noon

Client: Arch St Tower L | Permit type: Electrical | Permit status: Expired | Current use: Comm | Permit id: E42727 | Parcel: 0304643010
2010/09/16150009533 Arch St Boston Ma 02110David Noon
SCORE
100
Plumbing permit
Date:  December 29, 2014
Value:   $3,650
Contractor: Chad Perry

Client: Arch St Tower L | Permit type: Plumbing | Permit status: Expired | Current use: Comm | Permit id: Pl437402 | Parcel: 0304643020
2014/12/29365010033 Arch St Boston Ma 02110Chad Perry
SCORE
100
Electrical fire alarms
Date:  October 19, 2012
Value:   $2,000
Contractor: John Omahony

Client: Arch St Tower L | Permit type: Electrical | Permit status: Expired | Current use: Comm | Permit id: Efa193551 | Parcel: 0304643020
2012/10/19200010033 Arch St Boston Ma 02110John Omahony
SCORE
94
Electrical fire alarms
Date:  July 17, 2013
Value:   $4,000
Contractor: Michael Weber

Client: Arch St Tower L | Permit type: Fire alarm | Permit status: Expired | Current use: Comm | Permit id: Efa264373 | Parcel: 0304643020
2013/07/1740009433 Arch St Boston Ma 02110Michael Weber
SCORE
100
Renovation of 28th floor area with new furniture layouts and lighting modifications
Date:  September 19, 2016
Value:   $15,000
Contractor: William Weber

Client: T-C Arch St Llc | Permit type: Electrical | Permit status: Open | Current use: Comm | Permit id: E638047 | Parcel: 0304643020
2016/09/191500010033 Arch St Boston Ma 02110William Weber
SCORE
82
Job #12399 cbre floors 21 & 22 make safe demo & temp lights
Date:  October 14, 2016
Value:   $45,000
Contractor: Kristin Emond

Client: T-C Arch St Llc | Permit type: Electrical | Permit status: Open | Current use: Comm | Permit id: E646923 | Parcel: 0304643020
2016/10/14450008233 Arch St Boston Ma 02110Kristin Emond
SCORE
86
Popup lunch service in lobby of building
Date:  April 15, 2016
Contractor: Mark Barry

Client: T-C Arch St Llc | Permit type: Other | Permit status: Expired | Current use: Comm | Permit id: Sf580661 | Parcel: 0304643020
2016/04/1508633 Arch St Boston Ma 02110Mark Barry
SCORE
82
Job #12399 cbre floors 21 & 22 make safe demo & temp lights
Date:  October 14, 2016
Value:   $10,000
Contractor: Kristin Emond

Client: T-C Arch St Llc | Permit type: Fire alarm | Permit status: Open | Current use: Comm | Permit id: Efa646926 | Parcel: 0304643010
2016/10/14100008233 Arch St Boston Ma 02110Kristin Emond
SCORE
99
Interior office renovations on the 21st and 22nd floor to include electrical make safe and selective demolition.
Date:  October 21, 2016
Value:   $210,510

Client: T-C Arch St Llc | Permit type: Renovations -interior nsc | Permit status: Open | Current use: Comm | Permit id: Sf649692 | Parcel: 0304643020
2016/10/212105109933 Arch St Boston Ma 02110David M Corderman Jr
SCORE
86
Office renovation to include demolition on 21st and 22nd floor architectural finishes including drywall act flooring and paint as well as mep upgrades.
Date:  November 3, 2016
Value:   $296,550
Contractor: James Tully

Client: T-C Arch St Llc | Permit type: Fast track application | Permit status: Open | Current use: Comm | Permit id: Alt647014 | Parcel: 0304643010
2016/11/032965508633 Arch St Boston Ma 02110James Tully
SCORE
100
Build out of office space for tenant "data dog" on the 32nd floor. Work to include selective demo of finishes new finishes drywall electrical lighting hvac sprinkler adds relocates new fire alarm.
Date:  May 4, 2016
Value:   $200,000

Client: T-C Arch St Llc | Permit type: Fast track application | Permit status: Expired | Current use: Comm | Permit id: Alt581982 | Parcel: 0304643020
2016/05/0420000010033 Arch St Boston Ma 02110Garland Building Company
SCORE
100
Offices retail restaurant certificate for the offices on the 32nd floor alt581982 issued: 5 4 16
Date:  November 8, 2016
Value:   $200,000

Client: T-C Arch St Llc | Permit type: Fast track application | Permit status: Expired | Current use: Comm | Permit id: Coo653837 | Parcel: 0304643020
2016/11/0820000010033 Arch St Boston Ma 02110Christina Guarnotta
SCORE
84
Low voltage voice and data cabling
Date:  July 5, 2012
Value:   $26,000
Contractor: Herbert Buchine

Permit type: Low voltage | Current use: Comm | Permit id: Elv146020
2012/07/05260008433 Arch St Boston Ma 02110Herbert Buchine
SCORE
89
Common corridor renovation. Job #9446
Date:  August 4, 2010
Value:   $7,500
Contractor: Arthur Murphy

Client: Arch St Tower L | Permit type: Electrical | Current use: Comm | Permit id: E35666 | Parcel: 304643020
2010/08/0475008933 Arch St Boston Ma 02110Arthur Murphy
SCORE
74
Proposed work: tenant fit-out including drywalls ceiling mechanical electrical relocate sprinkler heads to new ceiling grid and wall layout installation on one pantry kitchen per plan last action: ready to issue
Date:  July 15, 2013
Contractor: Commodore Builders

Permit type: Fast track application | Current use: Comm | Permit id: Alt9895
2013/07/1507433 Arch St Boston Ma 02110Commodore Builders
SCORE
94
Installation of general power and lighting for tenant fit out
Date:  June 28, 2013
Value:   $60,000
Contractor: Michael Weber

Client: Arch St Tower L | Permit type: Electrical | Current use: Comm | Permit id: E258982 | Parcel: 304643020
2013/06/28600009433 Arch St Boston Ma 02110Michael Weber
SCORE
100
New sink & heater
Date:  July 17, 2014
Value:   $16,000
Contractor: Kevin Almeida

Client: Arch St Tower L | Permit type: Plumbing | Current use: Comm | Permit id: Pl381335 | Parcel: 304643020
2014/07/171600010033 Arch St Boston Ma 02110Kevin Almeida
SCORE
100
Install wiring within office cubicles on 14th floor for digatas
Date:  December 20, 2013
Value:   $200
Contractor: Thomas Newton

Client: Arch St Tower L | Permit type: Electrical | Current use: Comm | Permit id: E313692 | Parcel: 304643020
2013/12/2020010033 Arch St Boston Ma 02110Thomas Newton
SCORE
100
Sec phase 2 - install interconnecting stairwell work includes structural drywall partition ceiling tiles flooring hvac electrical sprinkler and finish work
Date:  October 7, 2010
Value:   $100,000
Contractor: Francesca Dirico

Client: Arch St Tower L | Permit type: Fast track application | Current use: Comm | Permit id: Alt43611 | Parcel: 304643010
2010/10/0710000010033 Arch St Boston Ma 02110Francesca Dirico
SCORE
96
Renovation to 10th & 28th floors
Date:  May 14, 2012
Value:   $350,000

Client: Arch St Tower L | Permit type: Electrical | Permit status: Expired | Current use: Comm | Permit id: E135569 | Parcel: 0304643020
2012/05/143500009633 Arch St Boston Ma 02110Mgm Electric Co. Inc
SCORE
95
Legal occupancy:; offices retail restaurant certificate of occupancy for the spec suite on the 30th floor alt383562 issued: 7 21 14
Date:  December 12, 2014
Value:   $275,000
Contractor: Glenn Doble

Client: Arch St Tower L | Permit type: Fast track application | Permit status: Expired | Current use: Comm | Permit id: Coo432044 | Parcel: 0304643010
2014/12/122750009533 Arch St Boston Ma 02110Glenn Doble
SCORE
100
Water heater installation
Date:  November 9, 2012
Value:   $3,000
Contractor: Michael Petrilli

Client: Arch St Tower L | Permit type: Plumbing | Current use: Comm | Permit id: Pl190077 | Parcel: 304643010
2012/11/09300010033 Arch St Boston Ma 02110Michael Petrilli
SCORE
94
Pantry renovations
Date:  April 27, 2015
Value:   $10,000
Contractor: David Mccarthy

Client: Arch St Tower L | Permit type: Plumbing | Permit status: Expired | Current use: Comm | Permit id: Pl465492 | Parcel: 0304643020
2015/04/27100009433 Arch St Boston Ma 02110David Mccarthy
SCORE
100
Offices retail restaurant c o-for offices 21st. Fl. -only permit #alt 22159 4 30 10 sf 42745 issued 9 151 0
Date:  January 11, 2011
Contractor: Francesca Dirico

Client: Arch St Tower L | Permit status: Expired | Current use: Comm | Permit id: Coo51074 | Parcel: 0304643010
2011/01/11010033 Arch St Boston Ma 02110Francesca Dirico
SCORE
100
11th floor multi tenant corridor - new drywall partition ceiling tiles flooring hvac electrical sprinkler fa and finish work
Date:  August 3, 2010
Value:   $45,000
Contractor: Francesca Dirico

Client: Arch St Tower L | Permit type: Fast track application | Current use: Comm | Permit id: Alt35752 | Parcel: 304643010
2010/08/034500010033 Arch St Boston Ma 02110Francesca Dirico
SCORE
100
Minor renovations to office space on the 20th floor to include selective demo construct 2 new walls 2 electrical outlets 2 sprinkler relocates no fire alarm egress not affected.
Date:  December 12, 2013
Value:   $15,000

Client: Arch St Tower L | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Comm | Permit id: Sf312307 | Parcel: 0304643010
2013/12/121500010033 Arch St Boston Ma 02110Garland Building Company
SCORE
95
Job number 10163 - cbre 33 arch street floors and 28 - demo office space
Date:  April 12, 2012
Value:   $10,000
Contractor: Brian Murphy

Client: Arch St Tower L | Permit type: Electrical | Permit status: Expired | Current use: Comm | Permit id: E130832 | Parcel: 0304643020
2012/04/12100009533 Arch St Boston Ma 02110Brian Murphy
SCORE
95
Offices retail restaurant coo for offices - 30th floor alt376672 issued 6 27 2014
Date:  September 12, 2014
Value:   $225,000
Contractor: Glenn Doble

Client: Arch St Tower L | Permit type: Fast track application | Permit status: Na | Current use: Comm | Permit id: Coo401888 | Parcel: 0304643020
2014/09/122250009533 Arch St Boston Ma 02110Glenn Doble
SCORE
100
Renovate small open area with new office furniture and additional receptacles
Date:  March 18, 2010
Value:   $5,000
Contractor: Michael Mcdonald

Client: Arch St Tower L | Permit type: Electrical | Current use: Comm | Permit id: E18270 | Parcel: 304643020
2010/03/18500010033 Arch St Boston Ma 02110Michael Mcdonald
SCORE
94
Installation of new service for tenant space
Date:  August 15, 2013
Value:   $5,000
Contractor: Michael Weber

Client: Arch St Tower L | Permit type: Electrical | Permit status: Expired | Current use: Comm | Permit id: E274827 | Parcel: 0304643020
2013/08/1550009433 Arch St Boston Ma 02110Michael Weber
SCORE
100
Demo 11th floor office space build new conference room supply room/closet new kitchen area install new paint and carpet throughout reconfigure electrical closet. Includes sprinkler relocates new fire alarm.
Date:  September 23, 2015
Value:   $220,000

Client: Arch St Tower L | Permit type: Fast track application | Permit status: Expired | Current use: Comm | Permit id: Alt521295 | Parcel: 0304643010
2015/09/2322000010033 Arch St Boston Ma 02110Garland Building Company
SCORE
100
Floor box outlets & fan
Date:  July 2, 2012
Value:   $7,800
Contractor: Ronald Forgione

Client: Arch St Tower L | Permit type: Electrical | Current use: Comm | Permit id: E155820 | Parcel: 304643010
2012/07/02780010033 Arch St Boston Ma 02110Ronald Forgione
SCORE
100
Removal and replacement of waterproofing
Date:  October 20, 2014
Value:   $476,355
Contractor: Joseph Pasquarello

Client: Arch St Tower L | Permit type: Renovations -interior nsc | Current use: Comm | Permit id: Sf418378 | Parcel: 304643010
2014/10/2047635510033 Arch St Boston Ma 02110Joseph Pasquarello
SCORE
100
Install new water heater hook up dishwasher
Date:  June 2, 2014
Value:   $2,344
Contractor: Michael Petrilli

Client: Arch St Tower L | Permit type: Plumbing | Current use: Comm | Permit id: Pl368214 | Parcel: 304643010
2014/06/02234410033 Arch St Boston Ma 02110Michael Petrilli
SCORE
100
Cbre - 11th floor manamgement office work includes drywall partition ceiling tiles flooring elelctrcial hvac sprinkler fa and finish work
Date:  August 11, 2010
Value:   $75,000
Contractor: Francesca Dirico

Client: Arch St Tower L | Permit type: Fast track application | Current use: Comm | Permit id: Alt36750 | Parcel: 304643010
2010/08/117500010033 Arch St Boston Ma 02110Francesca Dirico
SCORE
100
Fast track permit application: interior renovations for creative circle on the 20th floor. Work to include selective interior demolition of non-load bearing partitions new act and grid new doors and frames new carpet and paint as well as minor electrical sprinkler plumbing and hvac work. All work is per construction documents. No structural or egress changes.
Date:  December 23, 2014
Value:   $130,000
Contractor: Urshula Patel

Client: Arch St Tower L | Permit type: Fast track application | Permit status: Expired | Current use: Comm | Permit id: Alt434149 | Parcel: 0304643010
2014/12/2313000010033 Arch St Boston Ma 02110Urshula Patel
SCORE
93
Sediment carbon water filtration systrm
Date:  July 24, 2012
Value:   $500
Contractor: Mark St. Hilaire

Client: Arch St Tower L | Permit type: Plumbing | Current use: Comm | Permit id: Pl164177 | Parcel: 304643020
2012/07/245009333 Arch St Boston Ma 02110Mark St. Hilaire
SCORE
100
Offices retail restaurant temp. Coo for offices (24th floor) (phase 1) - adding;(23rd floor) (phase;2);- to expire in days on 8 26 2016 pending completion of phased work alt5052 issued 9 3 2015
Date:  January 11, 2016
Value:   $4,000,000
Contractor: Regina Olivieri

Client: Arch St Tower L | Permit type: Fast track application | Permit status: Expired | Current use: Comm | Permit id: Coo552679 | Parcel: 0304643020
2016/01/11400000010033 Arch St Boston Ma 02110Regina Olivieri
SCORE
96
New 1 amp electrical service for verizon wireless
Date:  August 18, 2015
Value:   $7,500
Contractor: Edward Noseworthy

Client: Arch St Tower L | Permit type: Electrical | Permit status: Open | Current use: Comm | Permit id: E503346 | Parcel: 0304643020
2015/08/1875009633 Arch St Boston Ma 02110Edward Noseworthy
SCORE
100
New sink & heater
Date:  August 11, 2014
Value:   $9,000
Contractor: Kevin Almeida

Client: Arch St Tower L | Permit type: Plumbing | Permit status: Expired | Current use: Comm | Permit id: Pl392706 | Parcel: 0304643010
2014/08/11900010033 Arch St Boston Ma 02110Kevin Almeida
SCORE
91
33rd floor office tenant fit out ( costar group );new partitions mep hvac ceilings finishes sprinkler system and fire alarm;
Date:  April 30, 2010
Value:   $1,500,000
Contractor: Michael Hoglund

Client: Arch St Tower L | Permit type: Fast track application | Current use: Comm | Permit id: Alt22159 | Parcel: 304643010
2010/04/3015000009133 Arch St Boston Ma 02110Michael Hoglund
SCORE
100
Insatll (2) new av units in near conference room 2574.
Date:  March 20, 2012
Value:   $2,500
Contractor: Dennis Mahoney

Client: Arch St Tower L | Permit type: Fire alarm | Current use: Comm | Permit id: Efa125286 | Parcel: 304643020
2012/03/20250010033 Arch St Boston Ma 02110Dennis Mahoney
SCORE
84
32nd floor: selective removal of one office architectural finishes relocate (3) sprinkler heads change out hot water heater add hvac cooling to server room electrical and relocate (1)horn strobe and (1) smoke detector.
Date:  May 29, 2014
Value:   $84,935
Contractor: Glenn A Doble

Client: Arch St Tower L | Permit type: Fast track application | Current use: Comm | Permit id: Alt362574 | Parcel: 304643020
2014/05/29849358433 Arch St Boston Ma 02110Glenn A Doble
SCORE
100
Low voltage wiring for cbre relocation to 10th fl and reconfiguration on fl28
Date:  May 7, 2012
Value:   $30,000
Contractor: Julie Colantoni

Client: Arch St Tower L | Permit type: Low voltage | Current use: Comm | Permit id: Elv132824 | Parcel: 304643010
2012/05/073000010033 Arch St Boston Ma 02110Julie Colantoni
SCORE
100
Install wiring within office cubicles on 31st floor for juniper pharmaceuticals
Date:  December 23, 2015
Value:   $400
Contractor: Thomas Newton

Client: Arch St Tower L | Permit type: Electrical | Permit status: Open | Current use: Comm | Permit id: E543256 | Parcel: 0304643010
2015/12/2340010033 Arch St Boston Ma 02110Thomas Newton
SCORE
100
Renovation on the 12th floor of an existing building. Work to include: selective demolition drywall and ceiling patching flooring and paint.
Date:  December 16, 2014
Value:   $49,114
Contractor: Anthony Cocuzzo

Client: Arch St Tower L | Permit type: Renovations -interior nsc | Current use: Comm | Permit id: Sf435252 | Parcel: 304643010
2014/12/164911410033 Arch St Boston Ma 02110Anthony Cocuzzo
SCORE
100
Installation of tel data for expansion space.
Date:  May 27, 2016
Value:   $14,000
Contractor: William Weber

Client: T-C Arch St Llc | Permit type: Low voltage | Permit status: Expired | Current use: Comm | Permit id: Elv595755 | Parcel: 0304643010
2016/05/271400010033 Arch St Boston Ma 02110William Weber
SCORE
62
Installation of 8 new telecom voice and data cable locations. Cabling from existing it server room to office expansion area and new conference room. The proposed drawing calls for 1 voice data outlet per office and a total of 4 voice data outlets within new conference room.
Date:  July 9, 2012
Value:   $10,000
Contractor: Jonathan Fallon

Client: Arch St Tower L | Permit type: Low voltage | Permit status: Expired | Current use: Comm | Permit id: Elv159909 | Parcel: 0304643010
2012/07/09100006233 Arch St Boston Ma 02110Jonathan Fallon
SCORE
89
Tenant space build out. Job #9452
Date:  August 4, 2010
Value:   $51,000
Contractor: Arthur Murphy

Client: Arch St Tower L | Permit type: Electrical | Current use: Comm | Permit id: E36585 | Parcel: 304643010
2010/08/04510008933 Arch St Boston Ma 02110Arthur Murphy
SCORE
100
Offices retail restaurant doc#alt434149; certificate of occupancy for;offices;on the 21st floor alt491619 issued: 7/14/15
Date:  September 22, 2015
Value:   $350,000

Client: Arch St Tower L | Permit type: Fast track application | Permit status: Expired | Current use: Comm | Permit id: Coo519475 | Parcel: 0304643020
2015/09/2235000010033 Arch St Boston Ma 02110Garland Building Company
SCORE
100
Minor interior renovations to the 32nd floor. Work to include minor demolition of non-load bearing drywall partition. Construction of new non-load bearing drywall partitions. New finishes to include carpet base paint acoustical ceilings doors. Minor electrical fire protection included.
Date:  January 4, 2012
Value:   $100,000
Contractor: Daniel Oneill

Client: Arch St Tower L | Permit type: Fast track application | Current use: Comm | Permit id: Alt109942 | Parcel: 304643020
2012/01/0410000010033 Arch St Boston Ma 02110Daniel Oneill
SCORE
91
Renovations on the 11th floor to include removal on non demising office partitions to open up space.
Date:  January 13, 2010
Value:   $20,000
Contractor: Urshula S Patel

Client: Arch St Tower L | Permit type: Renovations -interior nsc | Current use: Comm | Permit id: Sf10744 | Parcel: 304643010
2010/01/13200009133 Arch St Boston Ma 02110Urshula S Patel
SCORE
100
Renovation of space on the 32nd floor for new tenant
Date:  May 15, 2014
Value:   $15,000
Contractor: William Weber

Client: Arch St Tower L | Permit type: Electrical | Current use: Comm | Permit id: E362900 | Parcel: 304643010
2014/05/151500010033 Arch St Boston Ma 02110William Weber
SCORE
95
Job numbers 9093 &; 9094 - cbre 33 arch street 32nd floor - nstar to install 1 amp meter
Date:  May 20, 2011
Value:   $2,000
Contractor: Brian Murphy

Client: Arch St Tower L | Permit type: Electrical | Permit status: Expired | Current use: Comm | Permit id: E77605 | Parcel: 0304643020
2011/05/2020009533 Arch St Boston Ma 02110Brian Murphy
SCORE
100
20th floor fit out
Date:  May 25, 2012
Value:   $10,000
Contractor: Karen Sykes

Client: Arch St Tower L | Permit type: Electrical | Permit status: Expired | Current use: Comm | Permit id: E144478 | Parcel: 0304643020
2012/05/251000010033 Arch St Boston Ma 02110Karen Sykes
SCORE
100
Renovation of tenant space adding lighting and power.
Date:  May 27, 2016
Value:   $86,000
Contractor: William Weber

Client: T-C Arch St Llc | Permit type: Electrical | Permit status: Expired | Current use: Comm | Permit id: E595843 | Parcel: 0304643020
2016/05/278600010033 Arch St Boston Ma 02110William Weber
SCORE
95
32 floor relocate lights add 2 outlets
Date:  July 13, 2010
Value:   $1,000
Contractor: David Noon

Client: Arch St Tower L | Permit type: Electrical | Current use: Comm | Permit id: E33461 | Parcel: 304643020
2010/07/1310009533 Arch St Boston Ma 02110David Noon
SCORE
100
Renovation of existing fire alarm devices on floors 22 23 & 24 for tenant fit up. Work to be completed over (3) phases
Date:  October 1, 2015
Value:   $75,000
Contractor: William Weber

Client: Arch St Tower L | Permit type: Fire alarm | Permit status: Open | Current use: Comm | Permit id: Efa524516 | Parcel: 0304643010
2015/10/017500010033 Arch St Boston Ma 02110William Weber
SCORE
100
Install access control and cctv cameras for renovation of floors 22 23 24 sec
Date:  October 6, 2015
Value:   $50,000
Contractor: Brian Souza

Client: Arch St Tower L | Permit type: Low voltage | Permit status: Open | Current use: Comm | Permit id: Elv526519 | Parcel: 0304643020
2015/10/065000010033 Arch St Boston Ma 02110Brian Souza
SCORE
100
Installation of plumbing for kitchen
Date:  February 10, 2011
Value:   $12,000
Contractor: Kevin Maceachern

Client: Arch St Tower L | Permit type: Plumbing | Current use: Comm | Permit id: Pl63537 | Parcel: 304643020
2011/02/101200010033 Arch St Boston Ma 02110Kevin Maceachern
SCORE
99
Install security card readers
Date:  June 1, 2012
Value:   $5,000
Contractor: Richard Penney

Client: Arch St Tower L | Permit type: Low voltage | Current use: Comm | Permit id: Elv146072 | Parcel: 304643020
2012/06/0150009933 Arch St Boston Ma 02110Richard Penney
SCORE
98
Temp 800a feed for temp generator
Date:  July 19, 2013
Value:   $8,000
Contractor: John Penney

Client: Arch St Tower L | Permit type: Electrical | Current use: Comm | Permit id: E265498 | Parcel: 304643020
2013/07/1980009833 Arch St Boston Ma 02110John Penney
SCORE
100
Legal occupancy:; offices retail restaurant. Coo for offices on the 9th floor. Alt185381 issued: 10/4/12
Date:  November 16, 2012
Value:   $99,150

Client: Arch St Tower L | Permit status: Expired | Permit id: Coo199769 | Parcel: 0304643010
2012/11/169915010033 Arch St Boston Ma 02110Garland Building Company
SCORE
94
Renovation of existing space with new lighting and general power on 30th floor
Date:  July 17, 2013
Value:   $15,000
Contractor: Michael Weber

Client: Arch St Tower L | Permit type: Electrical | Current use: Comm | Permit id: E264374 | Parcel: 304643020
2013/07/17150009433 Arch St Boston Ma 02110Michael Weber
SCORE
86
Dla piper - 25th floor -; selective demo to existing walls. New walls and finishes including drywall flooring ceilings painting.; modifications to;existing mechanical electrical fire alarm and fire sprinkler;protection.
Date:  February 9, 2012
Value:   $301,592
Contractor: Josh Hines

Client: Arch St Tower L | Permit type: Fast track application | Current use: Comm | Permit id: Alt117179 | Parcel: 304643020
2012/02/093015928633 Arch St Boston Ma 02110Josh Hines
SCORE
100
Renovation of existing tenant space on the 30th floor for "tek systems". Work to include new offices conference rooms and pantry. All new flooring paint and millwork. Relocated sprinkler heads new fire alarm.
Date:  June 27, 2014
Value:   $225,000

Client: Arch St Tower L | Permit type: Fast track application | Permit status: Expired | Current use: Comm | Permit id: Alt376672 | Parcel: 0304643020
2014/06/2722500010033 Arch St Boston Ma 02110Garland Building Company
SCORE
100
New sink & heater
Date:  June 8, 2012
Value:   $10,000
Contractor: Kevin Almeida

Client: Arch St Tower L | Permit type: Plumbing | Current use: Comm | Permit id: Pl148965 | Parcel: 304643010
2012/06/081000010033 Arch St Boston Ma 02110Kevin Almeida
SCORE
100
Fast track permit renovations on the 31st floor to include new drywall partitions new finishes new hvac electrical and sprinkler all as per plans and specs submitted for permitting.
Date:  March 17, 2011
Value:   $110,000
Contractor: Urshula Patel

Client: Arch St Tower L | Permit type: Fast track application | Current use: Comm | Permit id: Alt66864 | Parcel: 304643010
2011/03/1711000010033 Arch St Boston Ma 02110Urshula Patel
SCORE
100
Sound masking speakers
Date:  November 8, 2012
Value:   $2,000
Contractor: Karen Sykes

Client: Arch St Tower L | Permit type: Low voltage | Current use: Comm | Permit id: Elv198423 | Parcel: 304643010
2012/11/08200010033 Arch St Boston Ma 02110Karen Sykes
SCORE
100
Demo some existing office space and install new lighting and power for new offices 2504 2505 and 2574.
Date:  March 20, 2012
Value:   $22,000
Contractor: Dennis Mahoney

Client: Arch St Tower L | Permit type: Electrical | Current use: Comm | Permit id: E125282 | Parcel: 304643020
2012/03/202200010033 Arch St Boston Ma 02110Dennis Mahoney
SCORE
100
Renovation of tenant space on the 20th floor with new lighting and power
Date:  April 21, 2015
Value:   $50,000
Contractor: William Weber

Client: Arch St Tower L | Permit type: Electrical | Permit status: Expired | Current use: Comm | Permit id: E464230 | Parcel: 0304643020
2015/04/215000010033 Arch St Boston Ma 02110William Weber
SCORE
100
Sec - 21st floor minor renoavtions include new office and finishes drywall partition ceiling tiles flooring relocate 4 sprinkler heads and assoacited lighting
Date:  September 15, 2010
Value:   $78,000
Contractor: Francesca Dirico

Client: Arch St Tower L | Permit type: Renovations -interior nsc | Current use: Comm | Permit id: Sf42745 | Parcel: 304643010
2010/09/157800010033 Arch St Boston Ma 02110Francesca Dirico
SCORE
100
S14-653 20 workstations @ 33 arch st.
Date:  August 20, 2014
Value:   $200
Contractor: John Omahony

Client: Arch St Tower L | Permit type: Electrical | Permit status: Expired | Current use: Comm | Permit id: E396828 | Parcel: 0304643020
2014/08/2020010033 Arch St Boston Ma 02110John Omahony
SCORE
100
Installallation of electrical service for new tenant space
Date:  July 30, 2013
Value:   $10,000
Contractor: John Mclaughlin

Client: Arch St Tower L | Permit type: Service change | Permit status: Expired | Current use: Comm | Permit id: E268572 | Parcel: 0304643020
2013/07/301000010033 Arch St Boston Ma 02110John Mclaughlin
SCORE
100
New sink & heater
Date:  July 3, 2013
Value:   $9,500
Contractor: Kevin Almeida

Client: Arch St Tower L | Permit type: Plumbing | Current use: Comm | Permit id: Pl260059 | Parcel: 304643020
2013/07/03950010033 Arch St Boston Ma 02110Kevin Almeida
SCORE
89
Installation of 3 security devices
Date:  June 15, 2015
Value:   $4,000
Contractor: Alfred Ortolani

Client: Arch St Tower L | Permit type: Low voltage | Permit status: Expired | Current use: Comm | Permit id: Elv481710 | Parcel: 0304643010
2015/06/1540008933 Arch St Boston Ma 02110Alfred Ortolani
SCORE
100
Legal occupancy:; offices retail &; restaurant.; alt109942 cbre - 10th and 28th floors demo. 10th floor new renovations. Coo for;cbre offices on the;10th &; 28th floors. Alt126061; issued: 3 28 12
Date:  August 28, 2012
Value:   $1,300,000
Contractor: Francesca Dirico

Client: Arch St Tower L | Permit type: Fast track application | Permit status: Expired | Current use: Comm | Permit id: Coo167254 | Parcel: 0304643010
2012/08/28130000010033 Arch St Boston Ma 02110Francesca Dirico
SCORE
100
Cbre - 10th and 28th floors demo 10th floor new renovations include dryall hvavc electrical sprinkler. Plumbing and finish work 28th floor selective renovation all new finshes include drywall partition electrical hvac sprinkler plumbing and finish work phased project first complete 10th floor and then 28th
Date:  March 28, 2012
Value:   $1,300,000
Contractor: Francesca Dirico

Client: Arch St Tower L | Permit type: Fast track application | Permit status: Expired | Current use: Comm | Permit id: Alt126061 | Parcel: 0304643010
2012/03/28130000010033 Arch St Boston Ma 02110Francesca Dirico
SCORE
100
Install 110 data communications outlets
Date:  June 10, 2010
Value:   $55,000
Contractor: Julie Colantoni

Client: Arch St Tower L | Permit type: Low voltage | Permit status: Expired | Current use: Comm | Permit id: Elv29363 | Parcel: 0304643020
2010/06/105500010033 Arch St Boston Ma 02110Julie Colantoni
SCORE
100
Remodel of office space 32nd flr - oc&c
Date:  January 14, 2011
Value:   $25,000
Contractor: William Weber

Client: Arch St Tower L | Permit type: Electrical | Current use: Comm | Permit id: Efa58336 | Parcel: 304643010
2011/01/142500010033 Arch St Boston Ma 02110William Weber
SCORE
94
Instalaltion of new fire alarm a v devices for tenant fit out
Date:  June 28, 2013
Value:   $6,500
Contractor: Michael Weber

Client: Arch St Tower L | Permit type: Fire alarm | Permit status: Expired | Current use: Comm | Permit id: Efa258979 | Parcel: 0304643010
2013/06/2865009433 Arch St Boston Ma 02110Michael Weber
SCORE
100
Install cat 5 cables for trading desk
Date:  July 2, 2012
Value:   $3,800
Contractor: Ronald Forgione

Client: Arch St Tower L | Permit type: Low voltage | Current use: Comm | Permit id: Elv155827 | Parcel: 304643010
2012/07/02380010033 Arch St Boston Ma 02110Ronald Forgione
SCORE
100
Nstar meter installation wo# 2009984
Date:  July 9, 2014
Value:   $500
Contractor: William Weber

Client: Arch St Tower L | Permit type: Electrical | Current use: Comm | Permit id: E382068 | Parcel: 304643020
2014/07/0950010033 Arch St Boston Ma 02110William Weber
SCORE
89
Fire alarm work for tenant space. Job #9452
Date:  August 4, 2010
Value:   $2,000
Contractor: Arthur Murphy

Client: Arch St Tower L | Permit type: Electrical | Current use: Comm | Permit id: Efa36586 | Parcel: 304643010
2010/08/0420008933 Arch St Boston Ma 02110Arthur Murphy
SCORE
100
Installation of (40) tel data locations for tenant fit out
Date:  June 19, 2014
Value:   $12,000
Contractor: William Weber

Client: Arch St Tower L | Permit type: Electrical | Permit status: Expired | Current use: Comm | Permit id: Elv375222 | Parcel: 0304643020
2014/06/191200010033 Arch St Boston Ma 02110William Weber
SCORE
100
Build out of spec suite on the 32nd floor. Work to include new finishes sprinkler relocates mep upgrades fire alarm modifications. Fast track all work per plans.
Date:  May 30, 2013
Value:   $100,000

Client: Arch St Tower L | Permit type: Fast track application | Permit status: Expired | Current use: Comm | Permit id: Alt245531 | Parcel: 0304643020
2013/05/3010000010033 Arch St Boston Ma 02110Garland Building Company
SCORE
95
Job 11712 - harbor capital 33 arch street 20th floor - install 11 down lights and 1 track light
Date:  August 28, 2015
Value:   $5,000
Contractor: Brian Murphy

Client: Arch St Tower L | Permit type: Electrical | Permit status: Open | Current use: Comm | Permit id: E512279 | Parcel: 0304643010
2015/08/2850009533 Arch St Boston Ma 02110Brian Murphy
SCORE
100
Lighting retrofit for 33 arch street replace (62) existing fixtures
Date:  February 4, 2013
Value:   $4,900
Contractor: Bill Mclaughlin

Client: Arch St Tower L | Permit type: Electrical | Current use: Comm | Permit id: E218162 | Parcel: 304643020
2013/02/04490010033 Arch St Boston Ma 02110Bill Mclaughlin
SCORE
100
Renovation of existing tenant space on 30th floor for new tenant to include lighting and power
Date:  July 9, 2014
Value:   $40,000
Contractor: William Weber

Client: Arch St Tower L | Permit type: Electrical | Current use: Comm | Permit id: E381695 | Parcel: 304643010
2014/07/094000010033 Arch St Boston Ma 02110William Weber
SCORE
100
Offices retail restaurant doc#alt5052 certificate of occupancy for the offices on the;11th floor alt521295 issued: 9/23/15
Date:  December 3, 2015
Value:   $220,000

Client: Arch St Tower L | Permit type: Fast track application | Permit status: Expired | Current use: Comm | Permit id: Coo542065 | Parcel: 0304643010
2015/12/0322000010033 Arch St Boston Ma 02110Christina Guarnotta
SCORE
84
Offices retail restaurant c o-for offices 32nd floor: -only alt 362574 issued 5 29 14
Date:  July 30, 2014
Value:   $84,935
Contractor: Glenn A Doble

Client: Arch St Tower L | Permit type: Fast track application | Permit status: Expired | Current use: Comm | Permit id: Coo387820 | Parcel: 0304643020
2014/07/30849358433 Arch St Boston Ma 02110Glenn A Doble
SCORE
82
Drill two exploratory holes in faade to investigate leakage
Date:  August 31, 2016
Value:   $35,363
Contractor: Ronald Santosuosso

Client: T-C Arch St Llc | Permit type: Interior/exterior work | Permit status: Open | Current use: Comm | Permit id: Sf632478 | Parcel: 0304643020
2016/08/31353638233 Arch St Boston Ma 02110Ronald Santosuosso
SCORE
100
Install 1 hot water tank and 1 kitchen sink on the 31st floor
Date:  March 31, 2011
Value:   $2,400
Contractor: Paul Dionne

Client: Arch St Tower L | Permit type: Plumbing | Current use: Comm | Permit id: Pl69727 | Parcel: 304643020
2011/03/31240010033 Arch St Boston Ma 02110Paul Dionne
SCORE
77
Interior renovation and reconfiguration of approximately 24 sq ft of existing office space on the 28th floor. Work to include; selective demo lighting electrical plumbing partitions and tel data.
Date:  August 9, 2016
Value:   $115,000
Contractor: George Oconnell

Client: T-C Arch St Llc | Permit type: Renovations -interior nsc | Permit status: Open | Current use: Comm | Permit id: Sf622418 | Parcel: 0304643020
2016/08/091150007733 Arch St Boston Ma 02110George Oconnell
SCORE
100
Provide wiring for card access panel replacement install new cameras wire 5 new doors.
Date:  June 11, 2012
Value:   $55,000
Contractor: Brian Souza

Client: Arch St Tower L | Permit type: Low voltage | Current use: Comm | Permit id: Elv149946 | Parcel: 304643010
2012/06/115500010033 Arch St Boston Ma 02110Brian Souza
SCORE
100
Minor interior renovations for insight global on the 20th floor to include new non-load bearing drywall partitions new carpet paint act millwork. Work to include minor power lighting fire alarm plumbing hvac and fire protection work.
Date:  May 21, 2012
Value:   $150,000
Contractor: Urshula Patel

Client: Arch St Tower L | Permit type: Fast track application | Current use: Comm | Permit id: Alt139592 | Parcel: 304643020
2012/05/2115000010033 Arch St Boston Ma 02110Urshula Patel
SCORE
100
Install water line for coffee maker
Date:  November 9, 2015
Value:   $900
Contractor: Kevin Maceachern

Client: Arch St Tower L | Permit type: Plumbing | Permit status: Open | Current use: Comm | Permit id: Pl537002 | Parcel: 0304643010
2015/11/0990010033 Arch St Boston Ma 02110Kevin Maceachern
SCORE
99
Low voltage tel data and security
Date:  March 28, 2011
Value:   $5,000
Contractor: Richard Penney

Client: Arch St Tower L | Permit type: Low voltage | Permit status: Expired | Current use: Comm | Permit id: Elv69429 | Parcel: 0304643020
2011/03/2850009933 Arch St Boston Ma 02110Richard Penney
SCORE
100
Nstar meter installation on 30th floor for new tenant (work order 02058213)
Date:  March 24, 2015
Value:   $1,500
Contractor: William Weber

Client: Arch St Tower L | Permit type: Electrical | Permit status: Expired | Current use: Comm | Permit id: E456327 | Parcel: 0304643020
2015/03/24150010033 Arch St Boston Ma 02110William Weber
SCORE
100
Relocation of existing fire alarm devices on the 32nd floor for tenant renovation
Date:  May 15, 2014
Value:   $3,500
Contractor: William Weber

Client: Arch St Tower L | Permit type: Fire alarm | Current use: Comm | Permit id: Efa362909 | Parcel: 304643010
2014/05/15350010033 Arch St Boston Ma 02110William Weber
SCORE
89
Crack repairs of concrete garge decking waterproofing membrane repairs and replacement and sealents
Date:  August 20, 2015
Value:   $399,820
Contractor: Ron Santosuosso

Client: Arch St Tower L | Permit type: Interior/exterior work | Permit status: Open | Current use: Comm | Permit id: Sf510442 | Parcel: 0304643020
2015/08/203998208933 Arch St Boston Ma 02110Ron Santosuosso
SCORE
100
Demo existing office space on the 21st floor and build out new space for tenant including all new offices drywall painting reuse of all ceilings flooring and lighting sprinkler work and new fire alarm devices. Plumbing demo only.
Date:  July 14, 2015
Value:   $350,000

Client: Arch St Tower L | Permit type: Fast track application | Permit status: Open | Current use: Comm | Permit id: Alt491619 | Parcel: 0304643010
2015/07/1435000010033 Arch St Boston Ma 02110Garland Building Company
SCORE
82
Rebuilding mixing valve
Date:  January 21, 2010
Value:   $2,000
Contractor: Michel Gorman

Client: Arch St Tower L | Permit type: Plumbing | Current use: Comm | Permit id: Pl11900 | Parcel: 304643010
2010/01/2120008233 Arch St Boston Ma 02110Michel Gorman
SCORE
100
Low voltage hvac controls on 30 & 32
Date:  July 24, 2013
Value:   $3,000
Contractor: Chris Cordingley

Client: Arch St Tower L | Permit type: Low voltage | Permit status: Expired | Current use: Comm | Permit id: Elv266940 | Parcel: 0304643020
2013/07/24300010033 Arch St Boston Ma 02110Chris Cordingley
SCORE
100
Electrical voice and data misc. Drywall patching & paint.
Date:  June 27, 2012
Value:   $14,650
Contractor: Vincent Ororke

Client: Arch St Tower L | Permit type: Renovations -interior nsc | Current use: Comm | Permit id: Sf157519 | Parcel: 304643010
2012/06/271465010033 Arch St Boston Ma 02110Vincent Ororke
SCORE
100
Remodel of office space 32nd floor - oc&c
Date:  January 14, 2011
Value:   $75,000
Contractor: William Weber

Client: Arch St Tower L | Permit type: Electrical | Current use: Comm | Permit id: E58337 | Parcel: 304643010
2011/01/147500010033 Arch St Boston Ma 02110William Weber
SCORE
95
11th floor domo make safe
Date:  July 13, 2010
Value:   $3,500
Contractor: David Noon

Client: Arch St Tower L | Permit type: Electrical | Current use: Comm | Permit id: E33253 | Parcel: 304643010
2010/07/1335009533 Arch St Boston Ma 02110David Noon
SCORE
89
Installing (1) new meter to 400a panel. Job #9093 extra
Date:  May 10, 2010
Value:   $7,000
Contractor: Arthur Murphy

Client: Arch St Tower L | Permit type: Electrical | Current use: Comm | Permit id: E24385 | Parcel: 304643010
2010/05/1070008933 Arch St Boston Ma 02110Arthur Murphy
SCORE
100
Electrical demolition and fit out for tenant space on the 22 23 and 24 floor to include lighting and power work to be completed over (3) phases
Date:  October 1, 2015
Value:   $750,000
Contractor: William Weber

Client: Arch St Tower L | Permit type: Electrical | Permit status: Open | Current use: Comm | Permit id: E524515 | Parcel: 0304643010
2015/10/0175000010033 Arch St Boston Ma 02110William Weber
SCORE
100
Offices retail &; restaurant c o for offices- 32nd floor - only permit#alt109943-1 4 12
Date:  February 16, 2012

Client: Arch St Tower L | Permit status: Expired | Current use: Comm | Permit id: Coo118078 | Parcel: 0304643020
2012/02/16010033 Arch St Boston Ma 02110Christina Guarnotta
SCORE
94
Installation of (4) a v and (2) smokes for renovation
Date:  July 17, 2013
Value:   $8,000
Contractor: Michael Weber

Client: Arch St Tower L | Permit type: Fire alarm | Permit status: Expired | Current use: Comm | Permit id: Efa264377 | Parcel: 0304643020
2013/07/1780009433 Arch St Boston Ma 02110Michael Weber
SCORE
86
Carpet paint demolition of closet tel-data and electrical on 29th floor.
Date:  March 4, 2010
Value:   $15,000

Client: Arch St Tower L | Permit type: Interior/exterior work | Current use: Comm | Permit id: Sf16570 | Parcel: 304643020
2010/03/04150008633 Arch St Boston Ma 02110Steven Georgopoulos
SCORE
100
Renovation of tenant space requiring new a v and smoke detection
Date:  July 9, 2014
Value:   $10,000
Contractor: William Weber

Client: Arch St Tower L | Permit type: Fire alarm | Permit status: Expired | Current use: Comm | Permit id: Efa381698 | Parcel: 0304643010
2014/07/091000010033 Arch St Boston Ma 02110William Weber
SCORE
89
Fire alarm work for common corridor. Job #9446
Date:  August 4, 2010
Value:   $800
Contractor: Arthur Murphy

Client: Arch St Tower L | Permit type: Electrical | Current use: Comm | Permit id: Efa35668 | Parcel: 304643010
2010/08/048008933 Arch St Boston Ma 02110Arthur Murphy
SCORE
59
Offices retail;and restaurant c o-for offices 32nd fl.-only alt 55430 issued 12 23 10
Date:  March 18, 2011
Contractor: Steven Georgopulos

Client: Arch St Tower L | Permit status: Expired | Current use: Comm | Permit id: Coo67437 | Parcel: 0304643020
2011/03/1805933 Arch St Boston Ma 02110Steven Georgopulos
SCORE
93
Office renovation on the 20th floor to include: demolition of existing finishes (both arch and mep). New architectural finishes to include drywall partitions millwork flooring ceiling paint and interior glazing. New mep systems to include hvac electrical and fire protection systems.
Date:  March 30, 2015
Value:   $194,711
Contractor: Matt Santapaula

Client: Arch St Tower L | Permit type: Fast track application | Permit status: Expired | Current use: Comm | Permit id: Alt453188 | Parcel: 0304643010
2015/03/301947119333 Arch St Boston Ma 02110Matt Santapaula
SCORE
100
Relocation and upgrade of a v and smoke detectors for renovation of tenant space
Date:  August 8, 2014
Value:   $8,500
Contractor: William Weber

Client: Arch St Tower L | Permit type: Fire alarm | Permit status: Expired | Current use: Comm | Permit id: Efa393639 | Parcel: 0304643020
2014/08/08850010033 Arch St Boston Ma 02110William Weber
SCORE
100
Intall access control system 28 devices
Date:  July 11, 2014
Value:   $9,998
Contractor: Mark Brophy

Client: Arch St Tower L | Permit type: Low voltage | Current use: Comm | Permit id: Elv383080 | Parcel: 304643020
2014/07/11999810033 Arch St Boston Ma 02110Mark Brophy
SCORE
100
13-037 cbre new meter sockets and panel
Date:  May 13, 2013
Value:   $15,000
Contractor: John Omahony

Client: Arch St Tower L | Permit type: Electrical | Current use: Comm | Permit id: E243323 | Parcel: 304643010
2013/05/131500010033 Arch St Boston Ma 02110John Omahony
SCORE
100
Interior renovation to the 22 23 and 24th floor. Work to include meps fa sprinkler stair infill and architectural finishes.; 3 phase construction.
Date:  September 3, 2015
Value:   $4,000,000
Contractor: Regina Olivieri

Client: Arch St Tower L | Permit type: Fast track application | Permit status: Open | Current use: Comm | Permit id: Alt505200 | Parcel: 0304643020
2015/09/03400000010033 Arch St Boston Ma 02110Regina Olivieri
SCORE
93
Filtered water cooler
Date:  July 24, 2014
Value:   $50
Contractor: Mark St. Hilaire

Client: Arch St Tower L | Permit type: Plumbing | Current use: Comm | Permit id: Pl383056 | Parcel: 304643010
2014/07/24509333 Arch St Boston Ma 02110Mark St. Hilaire
SCORE
100
Install cctv system 3 devices
Date:  May 19, 2014
Value:   $2,672
Contractor: Mark Brophy

Client: Arch St Tower L | Permit type: Low voltage | Current use: Comm | Permit id: Elv359125 | Parcel: 304643010
2014/05/19267210033 Arch St Boston Ma 02110Mark Brophy
SCORE
91
Modifications to the 20th floor to include construction 3 new offices new non-load bearing partitions to be built to underside of the existing acoustical ceiling. Relocate existing sprinkler heads modify hvac and add power and lighting as needed. New paint included as well. No structural or egress work
Date:  April 4, 2012
Value:   $25,000
Contractor: Urshula S Patel

Client: Arch St Tower L | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Comm | Permit id: Sf129412 | Parcel: 0304643020
2012/04/04250009133 Arch St Boston Ma 02110Urshula S Patel
SCORE
100
Fast track permit renovations on the 31st floor to include new drywall partitions new finishes hvac plumbing electrical and sprinkler in accordance with documents submitted for permitting.
Date:  March 17, 2011
Value:   $150,000
Contractor: Urshula Patel

Client: Arch St Tower L | Permit type: Fast track application | Current use: Comm | Permit id: Alt66474 | Parcel: 304643010
2011/03/1715000010033 Arch St Boston Ma 02110Urshula Patel
SCORE
99
Temp generator power for film production. (and only generator power) set 10-4-14
Date:  September 26, 2014
Value:   $500
Contractor: Edward Marcotti

Client: Arch St Tower L | Permit type: Electrical | Current use: Vacld | Permit id: Ets411468 | Parcel: 304643020
2014/09/265009933 Arch St Boston Ma 02110Edward Marcotti
SCORE
100
Low voltage hvac controls on the 30th floor
Date:  August 7, 2014
Value:   $2,500
Contractor: Chris Cordingley

Client: Arch St Tower L | Permit type: Low voltage | Current use: Comm | Permit id: Elv393421 | Parcel: 304643010
2014/08/07250010033 Arch St Boston Ma 02110Chris Cordingley
SCORE
92
Offices retail restaurant certificate of occupancy for the offices;on the 20th floor alt453188 issued: 3/30/15
Date:  June 24, 2015
Value:   $194,711
Contractor: Aidan Lindh

Client: Arch St Tower L | Permit type: Fast track application | Permit status: Expired | Current use: Comm | Permit id: Coo485939 | Parcel: 0304643020
2015/06/241947119233 Arch St Boston Ma 02110Aidan Lindh
SCORE
100
Low voltage hvac controls on the 10th floor
Date:  May 16, 2012
Value:   $5,000
Contractor: Chris Cordingley

Client: Arch St Tower L | Permit type: Low voltage | Current use: Comm | Permit id: Elv142305 | Parcel: 304643020
2012/05/16500010033 Arch St Boston Ma 02110Chris Cordingley
SCORE
100
Low voltage wiring - cbre
Date:  August 4, 2010
Value:   $2,000
Contractor: Christine Mckeown

Client: Arch St Tower L | Permit type: Low voltage | Current use: Comm | Permit id: Elv36801 | Parcel: 304643020
2010/08/04200010033 Arch St Boston Ma 02110Christine Mckeown
SCORE
100
Add tel/data jacks to insight global on 11th floor
Date:  October 6, 2015
Value:   $18,000
Contractor: Dennis Mahoney

Client: Arch St Tower L | Permit type: Low voltage | Permit status: Expired | Current use: Comm | Permit id: Elv526470 | Parcel: 0304643020
2015/10/061800010033 Arch St Boston Ma 02110Dennis Mahoney
SCORE
100
Renovation of existing space for new tenant on the 3oth floor to include new lighting power and electrical panels
Date:  August 8, 2014
Value:   $45,000
Contractor: William Weber

Client: Arch St Tower L | Permit type: Electrical | Current use: Comm | Permit id: E393636 | Parcel: 304643010
2014/08/084500010033 Arch St Boston Ma 02110William Weber
SCORE
100
Build out of spec suite on the 30th floor. Work to include selective demo install new finishes mep upgrades sprinkler relocates fire alarm modifications. Fast track all work per plans.
Date:  May 30, 2013
Value:   $50,000

Client: Arch St Tower L | Permit type: Fast track application | Permit status: Expired | Current use: Comm | Permit id: Alt245537 | Parcel: 0304643010
2013/05/305000010033 Arch St Boston Ma 02110Garland Building Company
SCORE
100
Offices retail restaurant coo for offices (22nd 23rd &; 24th floor) alt5052 issued 9 3 2015
Date:  August 25, 2016
Value:   $4,000,000
Contractor: Regina Olivieri

Client: T-C Arch St Llc | Permit type: Fast track application | Permit status: Expired | Current use: Comm | Permit id: Coo627670 | Parcel: 0304643010
2016/08/25400000010033 Arch St Boston Ma 02110Regina Olivieri
SCORE
86
Construction of new offices on 32nd floor including all new finishes; acoustical ceiling flooring paint and millwork. Work also includes new mep systems relocation of existing and installing new sprinkler heads.
Date:  December 23, 2010
Value:   $500,000

Client: Arch St Tower L | Permit type: Fast track application | Current use: Comm | Permit id: Alt55430 | Parcel: 304643020
2010/12/235000008633 Arch St Boston Ma 02110Steven Georgopoulos
SCORE
100
Install low voltage cabling at sec 33 arch street floors 22-24
Date:  October 22, 2015
Value:   $90,000
Contractor: Julie Colantoni

Client: Arch St Tower L | Permit type: Low voltage | Permit status: Open | Current use: Comm | Permit id: Elv528594 | Parcel: 0304643020
2015/10/229000010033 Arch St Boston Ma 02110Julie Colantoni
SCORE
100
Low voltage wiring - congress group
Date:  August 4, 2010
Value:   $17,000
Contractor: Christine Mckeown

Client: Arch St Tower L | Permit type: Low voltage | Current use: Comm | Permit id: Elv36802 | Parcel: 304643010
2010/08/041700010033 Arch St Boston Ma 02110Christine Mckeown
SCORE
100
20th floor fit out
Date:  May 25, 2012
Value:   $45,000
Contractor: Karen Sykes

Client: Arch St Tower L | Permit type: Electrical | Permit status: Expired | Current use: Comm | Permit id: E144470 | Parcel: 0304643020
2012/05/254500010033 Arch St Boston Ma 02110Karen Sykes
SCORE
100
Electrical connections inside 42 office cubicles cb richard ellis 10th floor
Date:  July 5, 2012
Value:   $1,000
Contractor: Thomas Newton

Client: Arch St Tower L | Permit type: Electrical | Current use: Comm | Permit id: E159741 | Parcel: 304643020
2012/07/05100010033 Arch St Boston Ma 02110Thomas Newton
SCORE
100
Legal occupancy: offices retail and restrurant alt126061 2012. Alt139592 issued:;5 21 12 ;c o is for: offices -;insight global ;20th floor.
Date:  July 11, 2012
Value:   $150,000
Contractor: Urshula Patel

Client: Arch St Tower L | Permit type: Fast track application | Permit status: Expired | Current use: Comm | Permit id: Coo159476 | Parcel: 0304643020
2012/07/1115000010033 Arch St Boston Ma 02110Urshula Patel
SCORE
91
Renovations on the 32nd floor to include the creation of 2 new offices. Work to include new drywall partitions 2 new outlets relocation of lights patch ceilings new base on new walls paint and relocations of 4 sprinkler heads. No egress or structural changes are to be made.
Date:  July 9, 2010
Value:   $27,000
Contractor: Urshula S Patel

Client: Arch St Tower L | Permit type: Renovations -interior nsc | Current use: Comm | Permit id: Sf33076 | Parcel: 304643010
2010/07/09270009133 Arch St Boston Ma 02110Urshula S Patel
SCORE
100
Nstar shutdown power to perform switchboard maintenance and testing
Date:  May 7, 2013
Value:   $4,500
Contractor: John Mclaughlin

Client: Arch St Tower L | Permit type: Annual maintenance | Current use: Comm | Permit id: E241579 | Parcel: 304643010
2013/05/07450010033 Arch St Boston Ma 02110John Mclaughlin
SCORE
100
11th floor preparatory demo
Date:  July 9, 2010
Value:   $25,000
Contractor: Francesca Dirico

Client: Arch St Tower L | Permit type: Demolition - interior | Current use: Comm | Permit id: Sf33119 | Parcel: 304643020
2010/07/092500010033 Arch St Boston Ma 02110Francesca Dirico
SCORE
94
Isntallation of lighting and power for space renovation on 32nd floor
Date:  July 17, 2013
Value:   $45,000
Contractor: Michael Weber

Client: Arch St Tower L | Permit type: Electrical | Current use: Comm | Permit id: E264378 | Parcel: 304643010
2013/07/17450009433 Arch St Boston Ma 02110Michael Weber
SCORE
100
Low voltage wiring sec 21st fl
Date:  July 30, 2015
Value:   $7,500
Contractor: Julie Colantoni

Client: Arch St Tower L | Permit type: Low voltage | Permit status: Open | Current use: Comm | Permit id: Elv498882 | Parcel: 0304643020
2015/07/30750010033 Arch St Boston Ma 02110Julie Colantoni
SCORE
100
Telecommunications cabling and terminations - on floor 32 insurance information to be faxed - arbella insurance #9109891010 exp. 10 9 2011
Date:  February 8, 2011
Value:   $30,000
Contractor: Sarah Beote

Client: Arch St Tower L | Permit type: Low voltage | Permit status: Expired | Current use: Comm | Permit id: Elv62786 | Parcel: 0304643020
2011/02/083000010033 Arch St Boston Ma 02110Sarah Beote
SCORE
100
Install 1 floor drain on the 21st floor
Date:  April 9, 2012
Value:   $1,400
Contractor: Paul Dionne

Client: Arch St Tower L | Permit type: Plumbing | Current use: Comm | Permit id: Pl121570 | Parcel: 304643010
2012/04/09140010033 Arch St Boston Ma 02110Paul Dionne
SCORE
100
Relocate lights new down lights exit switches duplex and relocate water heater & fan
Date:  December 31, 2014
Value:   $20,000
Contractor: Ivy White

Client: Arch St Tower L | Permit type: Electrical | Permit status: Expired | Current use: Comm | Permit id: E438087 | Parcel: 0304643020
2014/12/312000010033 Arch St Boston Ma 02110Ivy White
SCORE
100
Renovation of tenant space on the 11th floor including lighting and general power changes
Date:  October 14, 2015
Value:   $30,000
Contractor: William Weber

Client: Arch St Tower L | Permit type: Electrical | Permit status: Open | Current use: Comm | Permit id: E528447 | Parcel: 0304643020
2015/10/143000010033 Arch St Boston Ma 02110William Weber
SCORE
72
Offices retail and restaurant c o-for offices 31st. Fl.-only alt 66864 issued 3 17 2011
Date:  May 3, 2011
Contractor: Ursula Patel

Client: Arch St Tower L | Permit status: Expired | Current use: Comm | Permit id: Coo74194 | Parcel: 0304643010
2011/05/0307233 Arch St Boston Ma 02110Ursula Patel
SCORE
100
Offices retail and restaurant c o-for offices 33rd. Fl. -only permit#alt 22159 issued 4 30 10
Date:  January 11, 2011
Contractor: Francesca Dirico

Client: Arch St Tower L | Permit status: Expired | Current use: Comm | Permit id: Coo51062 | Parcel: 0304643010
2011/01/11010033 Arch St Boston Ma 02110Francesca Dirico
SCORE
100
Legal occupancy: offices retail and restaurant alt12606 2012. Alt139593 issued:; 5 21 2012.; coo for: offices-harbor capital ;20th floor.
Date:  July 12, 2012
Value:   $150,000
Contractor: Urshula Patel

Client: Arch St Tower L | Permit type: Fast track application | Permit status: Expired | Current use: Comm | Permit id: Coo159480 | Parcel: 0304643020
2012/07/1215000010033 Arch St Boston Ma 02110Urshula Patel
SCORE
100
Install 1 dishwasher 1 kitchen sink 1 water heater on 10th floor
Date:  May 7, 2012
Value:   $7,400
Contractor: Paul Dionne

Client: Arch St Tower L | Permit type: Plumbing | Current use: Comm | Permit id: Pl135712 | Parcel: 304643010
2012/05/07740010033 Arch St Boston Ma 02110Paul Dionne
SCORE
100
Congress group - 11th floor tenant fitout includes drywall partition ceiling flooring hvac electrical sprinkler and finish work
Date:  July 30, 2010
Value:   $515,000
Contractor: Francesca Dirico

Client: Arch St Tower L | Permit type: Fast track application | Current use: Comm | Permit id: Alt35747 | Parcel: 304643010
2010/07/3051500010033 Arch St Boston Ma 02110Francesca Dirico
SCORE
96
Install outlets in work stations 9th floor extre prize
Date:  November 8, 2012
Value:   $500
Contractor: Louis Connor

Client: Arch St Tower L | Permit type: Electrical | Current use: Comm | Permit id: E198838 | Parcel: 304643010
2012/11/085009633 Arch St Boston Ma 02110Louis Connor
SCORE
100
Install 69 voice data cables on 28th floor.
Date:  July 24, 2014
Value:   $4,500
Contractor: Kerry Mcwade

Client: Arch St Tower L | Permit type: Low voltage | Current use: Comm | Permit id: Elv387688 | Parcel: 304643010
2014/07/24450010033 Arch St Boston Ma 02110Kerry Mcwade
SCORE
100
Electrical connections inside 25 office cubicles for insight global 20th floor
Date:  July 5, 2012
Value:   $600
Contractor: Thomas Newton

Client: Arch St Tower L | Permit type: Electrical | Current use: Comm | Permit id: E159740 | Parcel: 304643010
2012/07/0560010033 Arch St Boston Ma 02110Thomas Newton
SCORE
100
Low voltage wiring - sec
Date:  September 21, 2010
Value:   $12,000
Contractor: Christine Mckeown

Client: Arch St Tower L | Permit type: Low voltage | Current use: Comm | Permit id: Elv43349 | Parcel: 304643010
2010/09/211200010033 Arch St Boston Ma 02110Christine Mckeown
SCORE
100
Offices retail restaurant certificate of occupancy for offices on the 20th floor;- only alt434149 issued 12/23/14
Date:  March 23, 2015
Value:   $130,000
Contractor: Urshula Patel

Client: Arch St Tower L | Permit type: Fast track application | Permit status: Expired | Current use: Comm | Permit id: Coo452056 | Parcel: 0304643010
2015/03/2313000010033 Arch St Boston Ma 02110Urshula Patel
SCORE
82
Access control - install a single card reader and alarm point on main entry door
Date:  December 4, 2015
Value:   $1,900

Client: Arch St Tower L | Permit type: Low voltage | Permit status: Open | Current use: Comm | Permit id: Elv529767 | Parcel: 0304643010
2015/12/0419008233 Arch St Boston Ma 02110Technologies Llc Convergint
SCORE
100
Install wiring within 82 office cubicles on 33rd floor for costar.
Date:  August 19, 2010
Value:   $820
Contractor: Thomas Newton

Client: Arch St Tower L | Permit type: Electrical | Current use: Mixed | Permit id: E39091 | Parcel: 304643020
2010/08/1982010033 Arch St Boston Ma 02110Thomas Newton
SCORE
100
Fast track permit : renovations to existing office space on the 9th floor to include selective demo of finishes install new carpet ceiling paint added fire alarm devices sprinkler relocates. Fast track permit
Date:  October 4, 2012
Value:   $100,000

Client: Arch St Tower L | Permit type: Fast track application | Permit status: Expired | Current use: Mixed | Permit id: Alt185381 | Parcel: 0304643010
2012/10/0410000010033 Arch St Boston Ma 02110Garland Building Company
SCORE
100
Hvac control wiring on the 22 23 24th floors
Date:  October 22, 2015
Value:   $18,000
Contractor: Chris Cordingley

Client: Arch St Tower L | Permit type: Electrical | Permit status: Open | Current use: Comm | Permit id: E531953 | Parcel: 0304643020
2015/10/221800010033 Arch St Boston Ma 02110Chris Cordingley
SCORE
89
Work along side corridor for cbre space build out. Job #9453
Date:  August 4, 2010
Value:   $14,500
Contractor: Arthur Murphy

Client: Arch St Tower L | Permit type: Electrical | Current use: Comm | Permit id: E36588 | Parcel: 304643010
2010/08/04145008933 Arch St Boston Ma 02110Arthur Murphy
SCORE
100
Minor interior renovations for harbor capital on the 20th floor to include new non-load bearing drywall partitions new carpet paint act millwork. Work to include minor power lighting fire alarm hvac and fire protection work.
Date:  May 21, 2012
Value:   $150,000
Contractor: Urshula Patel

Client: Arch St Tower L | Permit type: Fast track application | Current use: Comm | Permit id: Alt139593 | Parcel: 304643010
2012/05/2115000010033 Arch St Boston Ma 02110Urshula Patel
SCORE
100
Low voltage hvac controls on the 31st floor
Date:  April 14, 2011
Value:   $2,500
Contractor: Chris Cordingley

Client: Arch St Tower L | Permit type: Electrical | Current use: Comm | Permit id: Elv72509 | Parcel: 304643010
2011/04/14250010033 Arch St Boston Ma 02110Chris Cordingley
SCORE
100
Offices retail &; restaurant c o for: offices - 31st floor permit# alt66474-3 17 11
Date:  May 3, 2011
Contractor: Urshula Patel

Client: Arch St Tower L | Permit status: Expired | Current use: Comm | Permit id: Coo74193 | Parcel: 0304643010
2011/05/03010033 Arch St Boston Ma 02110Urshula Patel
SCORE
100
Install data communications cabling
Date:  March 25, 2011
Value:   $2,000
Contractor: Julie Colantoni

Client: Arch St Tower L | Permit type: Low voltage | Current use: Comm | Permit id: Elv69467 | Parcel: 304643020
2011/03/25200010033 Arch St Boston Ma 02110Julie Colantoni
SCORE
100
Install 23 low voltage outlets 22nd fl sec
Date:  August 11, 2015
Value:   $3,000
Contractor: Julie Colantoni

Client: Arch St Tower L | Permit type: Low voltage | Permit status: Open | Current use: Comm | Permit id: Elv500786 | Parcel: 0304643020
2015/08/11300010033 Arch St Boston Ma 02110Julie Colantoni
SCORE
100
Insight global - 11th floor -; tenant build out of new offices conference room and open area in vacant space.; work includes selective demo of finishes new finishes mep upgrades new lighting and;relocates to the sprinkler;and fire alarm system.;
Date:  June 18, 2013
Value:   $250,000

Client: Arch St Tower L | Permit type: Fast track application | Permit status: Expired | Current use: Comm | Permit id: Alt252131 | Parcel: 0304643020
2013/06/1825000010033 Arch St Boston Ma 02110Garland Building Company
SCORE
100
Offices retail and restaurant c o for: offices-11th floor permit# alt35747 - issued 7 30 10
Date:  September 16, 2010
Contractor: Francesca Dirico

Client: Arch St Tower L | Permit status: Expired | Current use: Comm | Permit id: Coo40821 | Parcel: 0304643020
2010/09/16010033 Arch St Boston Ma 02110Francesca Dirico
SCORE
100
Legal occupancy:; offices retail restaurant alt20931/2013 coo for offices on the;11th floor (global insight) alt252131 issued: 6/18/13
Date:  September 5, 2013
Value:   $250,000

Client: Arch St Tower L | Permit type: Fast track application | Permit status: Expired | Current use: Comm | Permit id: Coo279768 | Parcel: 0304643020
2013/09/0525000010033 Arch St Boston Ma 02110Garland Building Company
SCORE
100
Low voltage 33 arch 9th fl extraprise
Date:  October 18, 2012
Value:   $29,000
Contractor: Julie Colantoni

Client: Arch St Tower L | Permit type: Low voltage | Current use: Comm | Permit id: Elv190309 | Parcel: 304643010
2012/10/182900010033 Arch St Boston Ma 02110Julie Colantoni
SCORE
95
Renovations of existing tenant space on the 30th floor for "spec suite" work to include new offices conference room pantry. All new flooring paint and mill work. Relocate sprinkler heads electrical fire alarm hvac and plumbing.
Date:  July 21, 2014
Value:   $275,000
Contractor: Glenn Doble

Client: Arch St Tower L | Permit type: Fast track application | Permit status: Expired | Current use: Comm | Permit id: Alt383562 | Parcel: 0304643020
2014/07/212750009533 Arch St Boston Ma 02110Glenn Doble
SCORE
100
Relocation of fire alarm a/v and smoke detection for new tenant renovation
Date:  April 21, 2015
Value:   $10,000
Contractor: William Weber

Client: Arch St Tower L | Permit type: Fire alarm | Permit status: Expired | Current use: Comm | Permit id: Efa464232 | Parcel: 0304643020
2015/04/211000010033 Arch St Boston Ma 02110William Weber
SCORE
100
To install 4 sinks and 2 wh on the 22-24th floors @ 33 arch st.
Date:  September 24, 2015
Value:   $38,000
Contractor: Douglas Howard

Client: Arch St Tower L | Permit type: Plumbing | Permit status: Open | Current use: Comm | Permit id: Pl522419 | Parcel: 0304643020
2015/09/243800010033 Arch St Boston Ma 02110Douglas Howard
SCORE
99
Temp genny power for film production 9-10-11 staurday - day time call- set
Date:  September 6, 2011
Value:   $500
Contractor: Edward Marcotti

Client: Arch St Tower L | Permit type: Electrical | Current use: Vacld | Permit id: Ets94109 | Parcel: 304643010
2011/09/065009933 Arch St Boston Ma 02110Edward Marcotti
SCORE
59
Clean tighten torque switchgear
Date:  June 23, 2016
Value:   $5,000
Contractor: Silvestre Rosario

Client: T-C Arch St Llc | Permit type: Electrical | Permit status: Expired | Current use: Comm | Permit id: E605902 | Parcel: 0304643010
2016/06/2350005933 Arch St Boston Ma 02110Silvestre Rosario
SCORE
100
Disconnect existing furniture. Reconnect new furniture. (12) furniture connections electrical and tel/data.
Date:  November 12, 2015
Value:   $6,000
Contractor: William Weber

Client: Arch St Tower L | Permit type: Electrical | Permit status: Expired | Current use: Comm | Permit id: E537433 | Parcel: 0304643020
2015/11/12600010033 Arch St Boston Ma 02110William Weber
SCORE
82
Offices retail restaurant c o- ;for offices 25th. Fl.-only alt 117179 issued 2 9 2012
Date:  June 14, 2012
Value:   $301,592
Contractor: Michael Belanger

Client: Arch St Tower L | Permit type: Fast track application | Permit status: Expired | Current use: Comm | Permit id: Coo135036 | Parcel: 0304643020
2012/06/143015928233 Arch St Boston Ma 02110Michael Belanger
SCORE
95
33th floor tenant fit out
Date:  May 18, 2010
Value:   $300,000
Contractor: David Noon

Client: Arch St Tower L | Permit type: Electrical | Current use: Comm | Permit id: E26302 | Parcel: 304643010
2010/05/183000009533 Arch St Boston Ma 02110David Noon
Bfd chemist certificate proces
Date:  May 21, 2015

Client: Arch St Tower L | Permit id: Chm470603 | Parcel: 0304643020
2015/05/2109533 Arch St Boston Ma
Installation of new a/v and smoke detection for tenant renovation; ~; doc 20141112
Date:  August 18, 2014

Client: Arch St Tower L | Permit type: Bfd fire alarm installations | Permit id: Bfdf393828 | Parcel: 0304643020
2014/08/1809533 Arch St Boston Ma
Relocate 18 sprinklers
Date:  October 19, 2012

Client: Arch St Tower L | Permit type: Bfd sprinkler system | Permit id: Sprk191380 | Parcel: 0304643020
2012/10/1909533 Arch St Boston Ma
Bfd chemist certificate proces
Date:  June 7, 2012

Client: Arch St Tower L | Permit id: Chm149251 | Parcel: 0304643010
2012/06/0709533 Arch St Boston Ma
SCORE
100
Install 23 low voltage outlets 22nd fl sec
Date:  August 11, 2015
Value:   $3,000
Contractor: Julie Colantoni

Client: Arch St Tower L | Permit type: Electrical low voltage | Expiration date: February 11, 2016 | Current use: Comm | Permit id: Elv500786 | Parcel: 0304643020
2015/08/11300010033 Arch St Boston MaJulie Colantoni
SCORE
86
Construction of new offices on 32nd floor including all new finishes; acoustical ceiling flooring paint and millwork. Work also includes new mep systems relocation of existing and installing new sprinkler heads.
Date:  December 23, 2010
Value:   $500,000

Client: Arch St Tower L | Permit type: Long form/alteration permit | Expiration date: June 23, 2011 | Current use: Comm | Permit id: Alt55430 | Parcel: 0304643020
2010/12/235000008633 Arch St Boston MaSteven Georgopoulos
SCORE
100
Renovation on the 12th floor of an existing building. Work to include: selective demolition drywall and ceiling patching flooring and paint.
Date:  December 16, 2014
Value:   $49,114
Contractor: Anthony Cocuzzo

Client: Arch St Tower L | Permit type: Short form bldg permit | Expiration date: June 16, 2015 | Current use: Comm | Permit id: Sf435252 | Parcel: 0304643010
2014/12/164911410033 Arch St Boston MaAnthony Cocuzzo
Bfd chemist certificate proces
Date:  June 7, 2012

Client: Arch St Tower L | Permit id: Chm149257 | Parcel: 0304643020
2012/06/0709533 Arch St Boston Ma
Renovation of space requiring device relocations and additions. Doc#20130764
Date:  July 19, 2013

Client: Arch St Tower L | Permit type: Bfd fire alarm installations | Permit id: Bfdf259024 | Parcel: 0304643020
2013/07/1909533 Arch St Boston Ma
Bagging of smoke detectors
Date:  July 30, 2015

Client: Arch St Tower L | Permit type: Bfd bag smoke detectors | Permit id: Bsd497175 | Parcel: 0304643020
2015/07/3009533 Arch St Boston Ma
Relocate;53 existing sprinklers and add 5 new to ceiling grid. Total of 58 sprinkler heads.; work to be done per nfpa stands. One floor zone at a time.
Date:  July 10, 2013

Client: Arch St Tower L | Permit type: Bfd sprinkler system | Permit id: Sprk260700 | Parcel: 0304643020
2013/07/1009533 Arch St Boston Ma
SCORE
100
Provide wiring for card access panel replacement install new cameras wire 5 new doors.
Date:  June 11, 2012
Value:   $55,000
Contractor: Brian Souza

Client: Arch St Tower L | Permit type: Electrical low voltage | Expiration date: December 11, 2012 | Current use: Comm | Permit id: Elv149946 | Parcel: 0304643010
2012/06/115500010033 Arch St Boston MaBrian Souza
SCORE
99
Security card reader
Date:  April 11, 2011
Value:   $3,500
Contractor: Richard Penney

Client: Arch St Tower L | Permit type: Electrical low voltage | Expiration date: October 11, 2011 | Current use: Comm | Permit id: Elv71619 | Parcel: 0304643020
2011/04/1135009933 Arch St Boston MaRichard Penney
SCORE
100
Cbre - 11th floor manamgement office work includes drywall partition ceiling tiles flooring elelctrcial hvac sprinkler fa and finish work
Date:  August 11, 2010
Value:   $75,000
Contractor: Francesca Dirico

Client: Arch St Tower L | Permit type: Long form/alteration permit | Expiration date: February 11, 2011 | Current use: Comm | Permit id: Alt36750 | Parcel: 0304643020
2010/08/117500010033 Arch St Boston MaFrancesca Dirico
SCORE
89
Fire alarm work for tenant space. Job #9452
Date:  August 4, 2010
Value:   $2,000
Contractor: Arthur Murphy

Client: Arch St Tower L | Permit type: Electrical fire alarms | Expiration date: February 4, 2011 | Current use: Comm | Permit id: Efa36586 | Parcel: 0304643020
2010/08/0420008933 Arch St Boston MaArthur Murphy
Temporary bagging of smoke detectors during renovations.
Date:  December 17, 2014

Client: Arch St Tower L | Permit type: Bfd bag smoke detectors | Permit id: Bsd434491 | Parcel: 0304643020
2014/12/1709533 Arch St Boston Ma
Temporary bagging of smoke detectors
Date:  December 18, 2014

Client: Arch St Tower L | Permit type: Bfd bag smoke detectors | Permit id: Bsd435299 | Parcel: 0304643010
2014/12/1809533 Arch St Boston Ma
SCORE
89
Crack repairs of concrete garge decking waterproofing membrane repairs and replacement and sealents
Date:  August 20, 2015
Value:   $399,820
Contractor: Ron Santosuosso

Client: Arch St Tower L | Permit type: Short form bldg permit | Expiration date: February 20, 2016 | Current use: Comm | Permit id: Sf510442 | Parcel: 0304643020
2015/08/203998208933 Arch St Boston MaRon Santosuosso
Installation shall be inaccordance with the requirements of nfpa 13 and 7 cmr. Only one floor shall be impaired at any given time.
Date:  July 21, 2014

Permit type: Bfd sprinkler system | Permit id: Sprk381878
2014/07/2109533 Arch St Boston Ma
SCORE
100
Relocate lights new down lights exit switches duplex and relocate water heater & fan
Date:  December 31, 2014
Value:   $20,000
Contractor: Ivy White

Client: Arch St Tower L | Permit type: Electrical permit | Expiration date: June 30, 2015 | Current use: Comm | Permit id: E438087 | Parcel: 0304643020
2014/12/312000010033 Arch St Boston MaIvy White
SCORE
100
Electrical
Date:  March 24, 2011
Value:   $14,000
Contractor: Karen Sykes

Client: Arch St Tower L | Permit type: Electrical permit | Expiration date: September 24, 2011 | Current use: Comm | Permit id: E69099 | Parcel: 0304643010
2011/03/241400010033 Arch St Boston MaKaren Sykes
SCORE
100
Fire alarm 32st floor
Date:  January 6, 2012
Value:   $1,500
Contractor: Karen Sykes

Client: Arch St Tower L | Permit type: Electrical fire alarms | Expiration date: July 6, 2012 | Current use: Comm | Permit id: Efa113138 | Parcel: 0304643020
2012/01/06150010033 Arch St Boston MaKaren Sykes
SCORE
100
Demo some existing office space and install new lighting and power for new offices 2504 2505 and 2574.
Date:  March 20, 2012
Value:   $22,000
Contractor: Dennis Mahoney

Client: Arch St Tower L | Permit type: Electrical permit | Expiration date: September 20, 2012 | Current use: Comm | Permit id: E125282 | Parcel: 0304643010
2012/03/202200010033 Arch St Boston MaDennis Mahoney
Only one floor shall be impaired at any given time..... Installation shall comply with 7 cmr and nfpa 13
Date:  January 8, 2015

Client: Arch St Tower L | Permit type: Bfd sprinkler system | Permit id: Sprk435731 | Parcel: 0304643020
2015/01/0809533 Arch St Boston Ma
Relocate 27 sprinklers on 31st floor. Work to be done one floor zone at a time per nfpa 13 stands 7 cmr.
Date:  April 4, 2011

Client: Arch St Tower L | Permit type: Bfd sprinkler system | Permit id: Sprk70315 | Parcel: 0304643010
2011/04/0409533 Arch St Boston Ma
Street occupancy permit
Date:  March 19, 2013

Client: Arch St Tower L | Expiration date: March 22, 2013 | Permit id: Occu-228078 | Parcel: 0304643020
2013/03/1909533 Arch St Boston Ma
Erect and maintain protective staging on sidewalk; / working hrs; 7 am to 4 pm
Date:  June 22, 2015

Client: Arch St Tower L | Permit type: Street occupancy permit | Expiration date: July 25, 2015 | Permit id: Occu-486526 | Parcel: 0304643010
2015/06/2209533 Arch St Boston Ma
SCORE
94
Isntallation of lighting and power for space renovation on 32nd floor
Date:  July 17, 2013
Value:   $45,000
Contractor: Michael Weber

Client: Arch St Tower L | Permit type: Electrical permit | Expiration date: January 17, 2014 | Current use: Comm | Permit id: E264378 | Parcel: 0304643020
2013/07/17450009433 Arch St Boston MaMichael Weber
Relocate (13) existing sprinkler heads &; add (3) new to new ceiling grid.
Date:  June 7, 2012

Client: Arch St Tower L | Permit type: Bfd sprinkler system | Permit id: Sprk146095 | Parcel: 0304643010
2012/06/0709533 Arch St Boston Ma
Relocate sprinkler piping and heads for new floor plan on the 21st floor coordinate;with building management so that only one floor is impaired within the building at any time
Date:  November 29, 2010

Client: Arch St Tower L | Permit type: Bfd sprinkler system | Permit id: Sprk52796 | Parcel: 0304643010
2010/11/2909533 Arch St Boston Ma
Relocate (10) sprinklers on;32nd floor
Date:  January 18, 2012

Client: Arch St Tower L | Permit type: Bfd sprinkler system | Permit id: Sprk113292 | Parcel: 0304643010
2012/01/1809533 Arch St Boston Ma
SCORE
100
Build out of spec suite on the 30th floor. Work to include selective demo install new finishes mep upgrades sprinkler relocates fire alarm modifications. Fast track all work per plans.
Date:  May 30, 2013
Value:   $50,000

Client: Arch St Tower L | Permit type: Long form/alteration permit | Expiration date: November 30, 2013 | Current use: Comm | Permit id: Alt245537 | Parcel: 0304643010
2013/05/305000010033 Arch St Boston MaGarland Building Company
SCORE
95
11th floor domo make safe
Date:  July 13, 2010
Value:   $3,500
Contractor: David Noon

Client: Arch St Tower L | Permit type: Electrical permit | Expiration date: January 13, 2011 | Current use: Comm | Permit id: E33253 | Parcel: 0304643010
2010/07/1335009533 Arch St Boston MaDavid Noon
Relocate (24) existing sprinklers heads &; add (5) new sprinkler heads to new ceiling grid
Date:  June 7, 2012

Client: Arch St Tower L | Permit type: Bfd sprinkler system | Permit id: Sprk146078 | Parcel: 0304643010
2012/06/0709533 Arch St Boston Ma
Temporary bagging of smoke detectors for dust conrol during renovation work
Date:  July 22, 2013

Client: Arch St Tower L | Permit type: Bfd bag smoke detectors | Permit id: Bsd265343 | Parcel: 0304643020
2013/07/2209533 Arch St Boston Ma
Demo to include drywall &; finish work (cbre) secure any floor openings
Date:  March 26, 2012

Client: Arch St Tower L | Permit type: Bfd construction demo reno | Permit id: Fdc126512 | Parcel: 0304643010
2012/03/2609533 Arch St Boston Ma
SCORE
100
Install data communications cabling
Date:  March 25, 2011
Value:   $2,000
Contractor: Julie Colantoni

Client: Arch St Tower L | Permit type: Electrical low voltage | Expiration date: September 25, 2011 | Current use: Comm | Permit id: Elv69467 | Parcel: 0304643020
2011/03/25200010033 Arch St Boston MaJulie Colantoni
SCORE
100
3rd floor
Date:  December 23, 2013
Value:   $4,000
Contractor: Karen Sykes

Client: Arch St Tower L | Permit type: Electrical fire alarms | Expiration date: June 23, 2014 | Current use: Comm | Permit id: Efa313683 | Parcel: 0304643010
2013/12/23400010033 Arch St Boston MaKaren Sykes
SCORE
100
20th floor fit out
Date:  May 25, 2012
Value:   $10,000
Contractor: Karen Sykes

Client: Arch St Tower L | Permit type: Electrical permit | Expiration date: November 25, 2012 | Current use: Comm | Permit id: E144478 | Parcel: 0304643020
2012/05/251000010033 Arch St Boston MaKaren Sykes
SCORE
100
Low voltage wiring - cbre
Date:  August 4, 2010
Value:   $2,000
Contractor: Christine Mckeown

Client: Arch St Tower L | Permit type: Electrical low voltage | Expiration date: February 4, 2011 | Current use: Comm | Permit id: Elv36801 | Parcel: 0304643020
2010/08/04200010033 Arch St Boston MaChristine Mckeown
Relocate existing sprinkler heads to new ceiling grid. Work to be done per nfpa stands. 7 cmr. Work to be done one floor zone at a time.
Date:  March 7, 2012

Client: Arch St Tower L | Permit type: Bfd sprinkler system | Permit id: Sprk121190 | Parcel: 0304643010
2012/03/0709533 Arch St Boston Ma
Tenant re-fit:; 1 heads relocated on 10th floor heads relocated on 28th floor. Work to be done one floor zone at a time per nfpa stands. 7 cmr.
Date:  May 18, 2012

Client: Arch St Tower L | Permit type: Bfd sprinkler system | Permit id: Sprk138330 | Parcel: 0304643010
2012/05/1809533 Arch St Boston Ma
SCORE
100
Congress group - 11th floor tenant fitout includes drywall partition ceiling flooring hvac electrical sprinkler and finish work
Date:  July 30, 2010
Value:   $515,000
Contractor: Francesca Dirico

Client: Arch St Tower L | Permit type: Long form/alteration permit | Expiration date: January 30, 2011 | Current use: Comm | Permit id: Alt35747 | Parcel: 0304643020
2010/07/3051500010033 Arch St Boston MaFrancesca Dirico
SCORE
86
Carpet paint demolition of closet tel-data and electrical on 29th floor.
Date:  March 4, 2010
Value:   $15,000

Client: Arch St Tower L | Permit type: Short form bldg permit | Expiration date: September 4, 2010 | Current use: Comm | Permit id: Sf16570 | Parcel: 0304643010
2010/03/04150008633 Arch St Boston MaSteven Georgopoulos
Temporary bagging of smoke detectors for dust control during construction
Date:  January 30, 2012

Client: Arch St Tower L | Permit type: Bfd bag smoke detectors | Permit id: Bsd115571 | Parcel: 0304643010
2012/01/3009533 Arch St Boston Ma
SCORE
100
Install 69 voice data cables on 28th floor.
Date:  July 24, 2014
Value:   $4,500
Contractor: Kerry Mcwade

Client: Arch St Tower L | Permit type: Electrical low voltage | Expiration date: January 24, 2015 | Current use: Comm | Permit id: Elv387688 | Parcel: 0304643020
2014/07/24450010033 Arch St Boston MaKerry Mcwade
SCORE
100
Removal and replacement of waterproofing
Date:  October 20, 2014
Value:   $476,355
Contractor: Joseph Pasquarello

Client: Arch St Tower L | Permit type: Short form bldg permit | Expiration date: April 20, 2015 | Current use: Comm | Permit id: Sf418378 | Parcel: 0304643020
2014/10/2047635510033 Arch St Boston MaJoseph Pasquarello
SCORE
95
Job numbers 9093 &; 9094 - cbre 33 arch street 32nd floor - nstar to install 1 amp meter
Date:  May 20, 2011
Value:   $2,000
Contractor: Brian Murphy

Client: Arch St Tower L | Permit type: Electrical permit | Expiration date: November 20, 2011 | Current use: Comm | Permit id: E77605 | Parcel: 0304643010
2011/05/2020009533 Arch St Boston MaBrian Murphy
SCORE
99
Security system
Date:  October 17, 2012
Value:   $6,000
Contractor: Richard Penney

Client: Arch St Tower L | Permit type: Electrical low voltage | Expiration date: April 17, 2013 | Current use: Comm | Permit id: Elv190926 | Parcel: 0304643020
2012/10/1760009933 Arch St Boston MaRichard Penney
Relocate (4) sprinklers for new ceiling work 32nd floor
Date:  August 6, 2010

Client: Arch St Tower L | Permit type: Bfd sprinkler system | Permit id: Sprk34564 | Parcel: 0304643020
2010/08/0609533 Arch St Boston Ma
Renovation to existing office space on 9th floor; ~; doc# 20121242
Date:  November 7, 2012

Client: Arch St Tower L | Permit type: Bfd fire alarm installations | Permit id: Bfdf193956 | Parcel: 0304643010
2012/11/0709533 Arch St Boston Ma
SCORE
100
Install cctv system 3 devices
Date:  May 19, 2014
Value:   $2,672
Contractor: Mark Brophy

Client: Arch St Tower L | Permit type: Electrical low voltage | Expiration date: November 19, 2014 | Current use: Comm | Permit id: Elv359125 | Parcel: 0304643020
2014/05/19267210033 Arch St Boston MaMark Brophy
SCORE
100
Installation of plumbing for kitchen
Date:  February 10, 2011
Value:   $12,000
Contractor: Kevin Maceachern

Client: Arch St Tower L | Permit type: Plumbing permit | Expiration date: August 10, 2011 | Current use: Comm | Permit id: Pl63537 | Parcel: 0304643020
2011/02/101200010033 Arch St Boston MaKevin Maceachern
Coordinate impairment with the buildings impairment coordinator (required by 527 cmr 1. Section 16. 3) so that only one zone is impaired at any given time within the building... Installation shall comply with 7 cmr and nfpa 13
Date:  August 14, 2015

Client: Arch St Tower L | Permit type: Bfd sprinkler system | Permit id: Sprk504352 | Parcel: 0304643020
2015/08/1409533 Arch St Boston Ma
Install new dry valves on standpipe in garage in accordance with isd approved sprinkler plans
Date:  November 14, 2013

Client: Arch St Tower L | Permit type: Bfd sprinkler system | Permit id: Sprk301097 | Parcel: 0304643010
2013/11/1409533 Arch St Boston Ma
SCORE
100
Relocation of existing fire alarm devices on the 32nd floor for tenant renovation
Date:  May 15, 2014
Value:   $3,500
Contractor: William Weber

Client: Arch St Tower L | Permit type: Electrical fire alarms | Expiration date: November 15, 2014 | Current use: Comm | Permit id: Efa362909 | Parcel: 0304643010
2014/05/15350010033 Arch St Boston MaWilliam Weber
SCORE
100
Telephone wiring
Date:  August 11, 2010
Value:   $1,300
Contractor: Kevin Flaherty

Client: Arch St Tower L | Permit type: Electrical low voltage | Expiration date: February 11, 2011 | Current use: Comm | Permit id: Elv37011 | Parcel: 0304643020
2010/08/11130010033 Arch St Boston MaKevin Flaherty
Install speaker/strobes pull station &; booster; ~; doc# 20120691
Date:  June 18, 2012

Client: Arch St Tower L | Permit type: Bfd fire alarm installations | Permit id: Bfdf149926 | Parcel: 0304643010
2012/06/1809533 Arch St Boston Ma
SCORE
100
Sound masking speakers
Date:  November 8, 2012
Value:   $2,000
Contractor: Karen Sykes

Client: Arch St Tower L | Permit type: Electrical low voltage | Expiration date: May 8, 2013 | Current use: Comm | Permit id: Elv198423 | Parcel: 0304643020
2012/11/08200010033 Arch St Boston MaKaren Sykes
SCORE
96
Renovation to 10th & 28th floors
Date:  May 14, 2012
Value:   $350,000

Client: Arch St Tower L | Permit type: Electrical permit | Expiration date: November 14, 2012 | Current use: Comm | Permit id: E135569 | Parcel: 0304643020
2012/05/143500009633 Arch St Boston MaMgm Electric Co. Inc
Bfd chemist certificate proces
Date:  August 29, 2013

Client: Arch St Tower L | Permit id: Chm266708 | Parcel: 0304643010
2013/08/2909533 Arch St Boston Ma
SCORE
100
Lighting retrofit for 33 arch street replace (62) existing fixtures
Date:  February 4, 2013
Value:   $4,900
Contractor: Bill Mclaughlin

Client: Arch St Tower L | Permit type: Electrical permit | Expiration date: August 4, 2013 | Current use: Comm | Permit id: E218162 | Parcel: 0304643010
2013/02/04490010033 Arch St Boston MaBill Mclaughlin
SCORE
100
Extraprise 12-101
Date:  October 19, 2012
Value:   $2,000
Contractor: John Omahony

Client: Arch St Tower L | Permit type: Electrical fire alarms | Expiration date: April 19, 2013 | Current use: Comm | Permit id: Efa193551 | Parcel: 0304643020
2012/10/19200010033 Arch St Boston MaJohn Omahony
SCORE
100
Install 1 data communications outlets
Date:  June 10, 2010
Value:   $55,000
Contractor: Julie Colantoni

Client: Arch St Tower L | Permit type: Electrical low voltage | Expiration date: December 10, 2010 | Current use: Comm | Permit id: Elv29363 | Parcel: 0304643010
2010/06/105500010033 Arch St Boston MaJulie Colantoni
SCORE
100
Renovation of space on the 32nd floor for new tenant
Date:  May 15, 2014
Value:   $15,000
Contractor: William Weber

Client: Arch St Tower L | Permit type: Electrical permit | Expiration date: November 15, 2014 | Current use: Comm | Permit id: E362900 | Parcel: 0304643010
2014/05/151500010033 Arch St Boston MaWilliam Weber
SCORE
89
Fire alarm for cbre tenant space fit up. Job #9453
Date:  August 4, 2010
Value:   $2,000
Contractor: Arthur Murphy

Client: Arch St Tower L | Permit type: Electrical fire alarms | Expiration date: February 4, 2011 | Current use: Comm | Permit id: Efa36590 | Parcel: 0304643010
2010/08/0420008933 Arch St Boston MaArthur Murphy
SCORE
100
Fire alarm
Date:  March 24, 2011
Value:   $3,500
Contractor: Karen Sykes

Client: Arch St Tower L | Permit type: Electrical fire alarms | Expiration date: September 24, 2011 | Current use: Comm | Permit id: Efa69090 | Parcel: 0304643010
2011/03/24350010033 Arch St Boston MaKaren Sykes
SCORE
100
25th floor
Date:  March 28, 2012
Value:   $1,500
Contractor: Karen Sykes

Client: Arch St Tower L | Permit type: Electrical low voltage | Expiration date: September 28, 2012 | Current use: Comm | Permit id: Elv126856 | Parcel: 0304643010
2012/03/28150010033 Arch St Boston MaKaren Sykes
SCORE
100
Renovation of existing space for new tenant on the 3oth floor to include new lighting power and electrical panels
Date:  August 8, 2014
Value:   $45,000
Contractor: William Weber

Client: Arch St Tower L | Permit type: Electrical permit | Expiration date: February 8, 2015 | Current use: Comm | Permit id: E393636 | Parcel: 0304643010
2014/08/084500010033 Arch St Boston MaWilliam Weber
SCORE
100
20th floor fit out
Date:  May 25, 2012
Value:   $1,500
Contractor: Karen Sykes

Client: Arch St Tower L | Permit type: Electrical fire alarms | Expiration date: November 25, 2012 | Current use: Comm | Permit id: Efa144482 | Parcel: 0304643010
2012/05/25150010033 Arch St Boston MaKaren Sykes
SCORE
100
11th floor multi tenant corridor - new drywall partition ceiling tiles flooring hvac electrical sprinkler fa and finish work
Date:  August 3, 2010
Value:   $45,000
Contractor: Francesca Dirico

Client: Arch St Tower L | Permit type: Long form/alteration permit | Expiration date: February 3, 2011 | Current use: Comm | Permit id: Alt35752 | Parcel: 0304643020
2010/08/034500010033 Arch St Boston MaFrancesca Dirico
Temporary bagging of smoke detectors
Date:  April 14, 2015

Client: Arch St Tower L | Permit type: Bfd bag smoke detectors | Permit id: Bsd461880 | Parcel: 0304643020
2015/04/1409533 Arch St Boston Ma
New tenant moving into existing space - relocation of 1 a/v and 1 smoke detection device required for renovation; ~; doc# 20140245
Date:  June 11, 2014

Client: Arch St Tower L | Permit type: Bfd fire alarm installations | Permit id: Bfdf363015 | Parcel: 0304643010
2014/06/1109533 Arch St Boston Ma
Installation inaccordance with nfpa 13 and 7 cmr only one floor shall be impaired at any given time
Date:  June 4, 2014

Client: Arch St Tower L | Permit type: Bfd sprinkler system | Permit id: Sprk365367 | Parcel: 0304643010
2014/06/0409533 Arch St Boston Ma
SCORE
89
Work along side corridor for cbre space build out. Job #9453
Date:  August 4, 2010
Value:   $14,500
Contractor: Arthur Murphy

Client: Arch St Tower L | Permit type: Electrical permit | Expiration date: February 4, 2011 | Current use: Comm | Permit id: E36588 | Parcel: 0304643010
2010/08/04145008933 Arch St Boston MaArthur Murphy
SCORE
89
Tenant space build out. Job #9452
Date:  August 4, 2010
Value:   $51,000
Contractor: Arthur Murphy

Client: Arch St Tower L | Permit type: Electrical permit | Expiration date: February 4, 2011 | Current use: Comm | Permit id: E36585 | Parcel: 0304643020
2010/08/04510008933 Arch St Boston MaArthur Murphy
Relocate one speaker strobe only due to wall relocation. Work to be done per nfpa stands 7 cmr. ; ~; doc# 20150045
Date:  February 26, 2015

Client: Arch St Tower L | Permit type: Bfd fire alarm installations | Permit id: Bfdf443330 | Parcel: 0304643020
2015/02/2609533 Arch St Boston Ma
Bfd chemist certificate proces
Date:  November 7, 2013

Client: Arch St Tower L | Permit id: Chm293280 | Parcel: 0304643020
2013/11/0709533 Arch St Boston Ma
SCORE
95
Electrical
Date:  September 16, 2010
Value:   $15,000
Contractor: David Noon

Client: Arch St Tower L | Permit type: Electrical permit | Expiration date: March 16, 2011 | Current use: Comm | Permit id: E42727 | Parcel: 0304643020
2010/09/16150009533 Arch St Boston MaDavid Noon
SCORE
100
Tenant fitup
Date:  January 6, 2012
Value:   $10,000
Contractor: Marc Frisoli

Client: Arch St Tower L | Permit type: Electrical permit | Expiration date: July 6, 2012 | Current use: Comm | Permit id: E113254 | Parcel: 0304643020
2012/01/061000010033 Arch St Boston MaMarc Frisoli
SCORE
100
Low voltage hvac controls on the 10th floor
Date:  May 16, 2012
Value:   $5,000
Contractor: Chris Cordingley

Client: Arch St Tower L | Permit type: Electrical low voltage | Expiration date: November 16, 2012 | Current use: Comm | Permit id: Elv142305 | Parcel: 0304643020
2012/05/16500010033 Arch St Boston MaChris Cordingley
SCORE
100
20th floor
Date:  April 18, 2012
Value:   $3,000
Contractor: Karen Sykes

Client: Arch St Tower L | Permit type: Electrical low voltage | Expiration date: October 18, 2012 | Current use: Comm | Permit id: Elv130916 | Parcel: 0304643010
2012/04/18300010033 Arch St Boston MaKaren Sykes
SCORE
94
Installation of new service for tenant space
Date:  August 15, 2013
Value:   $5,000
Contractor: Michael Weber

Client: Arch St Tower L | Permit type: Electrical permit | Expiration date: February 15, 2014 | Current use: Comm | Permit id: E274827 | Parcel: 0304643010
2013/08/1550009433 Arch St Boston MaMichael Weber
SCORE
100
New bathroom
Date:  May 25, 2010
Value:   $18,000
Contractor: Kevin Almeida

Client: Arch St Tower L | Permit type: Plumbing permit | Expiration date: November 25, 2010 | Current use: Comm | Permit id: Pl27046 | Parcel: 0304643010
2010/05/251800010033 Arch St Boston MaKevin Almeida
Install speaker strobes &; booster; ~; doc# 20120692
Date:  June 28, 2012

Client: Arch St Tower L | Permit type: Bfd fire alarm installations | Permit id: Bfdf149918 | Parcel: 0304643020
2012/06/2809533 Arch St Boston Ma
SCORE
100
Install cat 5 cables for trading desk
Date:  July 2, 2012
Value:   $3,800
Contractor: Ronald Forgione

Client: Arch St Tower L | Permit type: Electrical low voltage | Expiration date: January 2, 2013 | Current use: Comm | Permit id: Elv155827 | Parcel: 0304643020
2012/07/02380010033 Arch St Boston MaRonald Forgione
Temporary bagging of smoke detectors for dust control during renovation work
Date:  July 8, 2013

Client: Arch St Tower L | Permit type: Bfd bag smoke detectors | Permit id: Bsd259038 | Parcel: 0304643020
2013/07/0809533 Arch St Boston Ma
SCORE
100
Install low voltage cabling at sec 33 arch street floors 22-24
Date:  October 22, 2015
Value:   $90,000
Contractor: Julie Colantoni

Client: Arch St Tower L | Permit type: Electrical low voltage | Expiration date: April 22, 2016 | Current use: Comm | Permit id: Elv528594 | Parcel: 0304643010
2015/10/229000010033 Arch St Boston MaJulie Colantoni
SCORE
100
Hvac control wiring on the 22 23 24th floors
Date:  October 22, 2015
Value:   $18,000
Contractor: Chris Cordingley

Client: Arch St Tower L | Permit type: Electrical permit | Expiration date: April 22, 2016 | Current use: Comm | Permit id: E531953 | Parcel: 0304643020
2015/10/221800010033 Arch St Boston MaChris Cordingley
SCORE
82
Installing new fire alarm devices in tenant space
Date:  October 23, 2015

Client: Arch St Tower L | Permit type: Bfd fire alarm installations | Permit id: Bfdf526422 | Parcel: 0304643010
2015/10/2308233 Arch St Boston MaErica Burgos J And M Brown Company
SCORE
94
Pantry renovations
Date:  April 27, 2015
Value:   $10,000
Contractor: David Mccarthy

Client: Arch St Tower L | Permit type: Plumbing permit | Expiration date: October 27, 2015 | Current use: Comm | Permit id: Pl465492 | Parcel: 0304643010
2015/04/27100009433 Arch St Boston MaDavid Mccarthy
Bfd chemist certificate proces
Date:  October 28, 2015

Client: Arch St Tower L | Permit id: Chm530715 | Parcel: 0304643020
2015/10/2809533 Arch St Boston Ma
Add 2 av units to office area 257a on 25th fl
Date:  April 2, 2012

Client: Arch St Tower L | Permit type: Bfd fire alarm installations | Permit id: Bfdf125611 | Parcel: 0304643020
2012/04/0209533 Arch St Boston Ma
Install conduit; x 12"; rdwy; guar 2012; lateral policy approved by pic; (tl); 7am-7pm; boston police detail area a 343-4239; (1); extension
Date:  October 28, 2015

Client: Arch St Tower L | Permit type: Excavation permit | Expiration date: November 8, 2015 | Permit id: Exca-533858 | Parcel: 0304643010
2015/10/2809533 Arch St Boston Ma
SCORE
100
Install water line for coffee maker
Date:  November 9, 2015
Value:   $900
Contractor: Kevin Maceachern

Client: Arch St Tower L | Permit type: Plumbing permit | Expiration date: May 9, 2016 | Current use: Comm | Permit id: Pl537002 | Parcel: 0304643010
2015/11/0990010033 Arch St Boston MaKevin Maceachern
Bfd chemist certificate proces
Date:  November 13, 2015

Client: Arch St Tower L | Permit id: Chm535262 | Parcel: 0304643010
2015/11/1309533 Arch St Boston Ma
Install new data cable and terminate
Date:  May 15, 2015
Value:   $15,000

Client: Arch St Tower L | Permit type: Electrical low voltage | Expiration date: November 15, 2015 | Current use: Comm | Permit id: Elv473325 | Parcel: 0304643010
2015/05/15150009533 Arch St Boston Ma
Relocating existing sprinklers in the new tenant space to accommodate renovation 11th floor. Work to be done one floor zone at a time per nfpa stands 7 cmr.
Date:  November 19, 2015

Client: Arch St Tower L | Permit type: Bfd sprinkler system | Permit id: Sprk530327 | Parcel: 0304643010
2015/11/1909533 Arch St Boston Ma
Renovation work to include removal of carpet paint and demolition of closet (secure any floor openings)
Date:  March 24, 2010

Client: Arch St Tower L | Permit type: Bfd construction demo reno | Permit id: Fdc18254 | Parcel: 0304643010
2010/03/2409533 Arch St Boston Ma
SCORE
100
Install 1 floor drain on the 21st floor
Date:  April 9, 2012
Value:   $1,400
Contractor: Paul Dionne

Client: Arch St Tower L | Permit type: Plumbing permit | Expiration date: October 9, 2012 | Current use: Comm | Permit id: Pl121570 | Parcel: 0304643020
2012/04/09140010033 Arch St Boston MaPaul Dionne
SCORE
100
Install 1 dishwasher 1 kitchen sink 1 water heater on 10th floor
Date:  May 7, 2012
Value:   $7,400
Contractor: Paul Dionne

Client: Arch St Tower L | Permit type: Plumbing permit | Expiration date: November 7, 2012 | Current use: Comm | Permit id: Pl135712 | Parcel: 0304643010
2012/05/07740010033 Arch St Boston MaPaul Dionne
SCORE
100
Install 1 hot water tank and 1 kitchen sink on the 31st floor
Date:  March 31, 2011
Value:   $2,400
Contractor: Paul Dionne

Client: Arch St Tower L | Permit type: Plumbing permit | Expiration date: September 30, 2011 | Current use: Comm | Permit id: Pl69727 | Parcel: 0304643010
2011/03/31240010033 Arch St Boston MaPaul Dionne
SCORE
89
Installation of 3 security devices
Date:  June 15, 2015
Value:   $4,000
Contractor: Alfred Ortolani

Client: Arch St Tower L | Permit type: Electrical low voltage | Expiration date: December 15, 2015 | Current use: Comm | Permit id: Elv481710 | Parcel: 0304643020
2015/06/1540008933 Arch St Boston MaAlfred Ortolani
SCORE
82
Access control - install a single card reader and alarm point on main entry door
Date:  December 4, 2015
Value:   $1,900

Client: Arch St Tower L | Permit type: Electrical low voltage | Expiration date: June 4, 2016 | Current use: Comm | Permit id: Elv529767 | Parcel: 0304643010
2015/12/0419008233 Arch St Boston MaTechnologies Llc Convergint
SCORE
100
Install wiring within office cubicles on 31st floor for juniper pharmaceuticals
Date:  December 23, 2015
Value:   $400
Contractor: Thomas Newton

Client: Arch St Tower L | Permit type: Electrical permit | Expiration date: June 23, 2016 | Current use: Comm | Permit id: E543256 | Parcel: 0304643020
2015/12/2340010033 Arch St Boston MaThomas Newton
Cutting/burning/welding for installation of steel beams &; new decking of stairs dpl8/30/16 bfd paid detail required
Date:  January 7, 2016

Client: Arch St Tower L | Permit type: Bfd cutting-burning-welding | Permit id: Cbw551344 | Parcel: 0304643010
2016/01/0709533 Arch St Boston Ma
Installation of security devices.
Date:  July 9, 2015
Value:   $4,758

Client: Arch St Tower L | Permit type: Electrical low voltage | Expiration date: January 9, 2016 | Current use: Comm | Permit id: Elv490677 | Parcel: 0304643020
2015/07/0947589533 Arch St Boston Ma
SCORE
100
Offices retail restaurant temp. Coo for offices (24th floor) (phase 1 of 3 phases) - to expire in days on april 6 2016 pending completion of phased work alt5052 issued 9/3/2015
Date:  January 11, 2016
Value:   $4,000,000
Contractor: Regina Olivieri

Client: Arch St Tower L | Permit type: Certificate of occupancy | Current use: Comm | Permit id: Coo552679 | Parcel: 0304643010
2016/01/11400000010033 Arch St Boston MaRegina Olivieri
SCORE
100
Demo existing office space on the 21st floor and build out new space for tenant including all new offices drywall painting reuse of all ceilings flooring and lighting sprinkler work and new fire alarm devices. Plumbing demo only.
Date:  July 14, 2015
Value:   $350,000

Client: Arch St Tower L | Permit type: Long form/alteration permit | Expiration date: January 14, 2016 | Current use: Comm | Permit id: Alt491619 | Parcel: 0304643010
2015/07/1435000010033 Arch St Boston MaGarland Building Company
SCORE
100
Office fit-out
Date:  July 23, 2015
Value:   $50,000
Contractor: Jeffrey Catalano

Client: Arch St Tower L | Permit type: Electrical permit | Expiration date: January 23, 2016 | Current use: Comm | Permit id: E497301 | Parcel: 0304643020
2015/07/235000010033 Arch St Boston MaJeffrey Catalano
SCORE
100
21st floor
Date:  July 27, 2015
Value:   $3,000
Contractor: Karen Sykes

Client: Arch St Tower L | Permit type: Electrical fire alarms | Expiration date: January 27, 2016 | Current use: Comm | Permit id: Efa498489 | Parcel: 0304643020
2015/07/27300010033 Arch St Boston MaKaren Sykes
SCORE
100
Low voltage wiring sec 21st fl
Date:  July 30, 2015
Value:   $7,500
Contractor: Julie Colantoni

Client: Arch St Tower L | Permit type: Electrical low voltage | Expiration date: January 30, 2016 | Current use: Comm | Permit id: Elv498882 | Parcel: 0304643020
2015/07/30750010033 Arch St Boston MaJulie Colantoni
SCORE
100
Electrical
Date:  March 24, 2011
Value:   $18,000
Contractor: Karen Sykes

Client: Arch St Tower L | Permit type: Electrical permit | Expiration date: September 24, 2011 | Current use: Comm | Permit id: E69095 | Parcel: 0304643020
2011/03/241800010033 Arch St Boston MaKaren Sykes
SCORE
100
Low voltage hvac controls on the 31st floor
Date:  April 14, 2011
Value:   $2,500
Contractor: Chris Cordingley

Client: Arch St Tower L | Permit type: Electrical low voltage | Expiration date: October 14, 2011 | Current use: Comm | Permit id: Elv72509 | Parcel: 0304643020
2011/04/14250010033 Arch St Boston MaChris Cordingley
SCORE
94
Renovation of existing space with new lighting and general power on 30th floor
Date:  July 17, 2013
Value:   $15,000
Contractor: Michael Weber

Client: Arch St Tower L | Permit type: Electrical permit | Expiration date: January 17, 2014 | Current use: Comm | Permit id: E264374 | Parcel: 0304643020
2013/07/17150009433 Arch St Boston MaMichael Weber
Renovation of space requiring;2 a/v relocation. Doc#20130836
Date:  July 25, 2013

Client: Arch St Tower L | Permit type: Bfd fire alarm installations | Permit id: Bfdf264615 | Parcel: 0304643010
2013/07/2509533 Arch St Boston Ma
Installation of new a/v and smoke detection for tenant renovation;(floor 30); ~; doc# 20140927
Date:  August 7, 2014

Client: Arch St Tower L | Permit type: Bfd fire alarm installations | Permit id: Bfdf382049 | Parcel: 0304643010
2014/08/0709533 Arch St Boston Ma
SCORE
99
Install security card readers
Date:  June 1, 2012
Value:   $5,000
Contractor: Richard Penney

Client: Arch St Tower L | Permit type: Electrical low voltage | Expiration date: December 1, 2012 | Current use: Comm | Permit id: Elv146072 | Parcel: 0304643020
2012/06/0150009933 Arch St Boston MaRichard Penney
Bfdalteration of fuel oil burn
Date:  April 9, 2015

Client: Arch St Tower L | Permit id: Alfob461005 | Parcel: 0304643010
2015/04/0909533 Arch St Boston Ma
Relocate 14 sprinkler heads. Work to be done per nfpa stands 7 cmr one floor zone at a time.
Date:  July 22, 2013

Client: Arch St Tower L | Permit type: Bfd sprinkler system | Permit id: Sprk261473 | Parcel: 0304643010
2013/07/2209533 Arch St Boston Ma
SCORE
100
Low voltage hvac controls on & 32
Date:  July 24, 2013
Value:   $3,000
Contractor: Chris Cordingley

Client: Arch St Tower L | Permit type: Electrical low voltage | Expiration date: January 24, 2014 | Current use: Comm | Permit id: Elv266940 | Parcel: 0304643010
2013/07/24300010033 Arch St Boston MaChris Cordingley
SCORE
100
Low voltage hvac controls on the 30th floor
Date:  August 7, 2014
Value:   $2,500
Contractor: Chris Cordingley

Client: Arch St Tower L | Permit type: Electrical low voltage | Expiration date: February 7, 2015 | Current use: Comm | Permit id: Elv393421 | Parcel: 0304643020
2014/08/07250010033 Arch St Boston MaChris Cordingley
Test
Date:  June 6, 2012

Client: Arch St Tower L | Permit type: Bfd chemist certificate proces | Permit id: Chm148469 | Parcel: 0304643010
2012/06/0609533 Arch St Boston Ma
Relocate (85) sprinklers 11th floor
Date:  August 13, 2010

Client: Arch St Tower L | Permit type: Bfd sprinkler system | Permit id: Sprk37505 | Parcel: 0304643020
2010/08/1309533 Arch St Boston Ma
Install speaker strobes on 32nd floor; ~; doc# 20120026
Date:  February 8, 2012

Client: Arch St Tower L | Permit type: Bfd fire alarm installations | Permit id: Bfdf114162 | Parcel: 0304643020
2012/02/0809533 Arch St Boston Ma
SCORE
100
Insatll (2) new av units in near conference room 2574.
Date:  March 20, 2012
Value:   $2,500
Contractor: Dennis Mahoney

Client: Arch St Tower L | Permit type: Electrical fire alarms | Expiration date: September 20, 2012 | Current use: Comm | Permit id: Efa125286 | Parcel: 0304643010
2012/03/20250010033 Arch St Boston MaDennis Mahoney
Only one zone shall be impaired at any given time within the building.
Date:  May 11, 2015

Client: Arch St Tower L | Permit type: Bfd sprinkler system | Permit id: Sprk464501 | Parcel: 0304643010
2015/05/1109533 Arch St Boston Ma
SCORE
100
20th floor
Date:  April 18, 2012
Value:   $8,000
Contractor: Karen Sykes

Client: Arch St Tower L | Permit type: Electrical permit | Expiration date: October 18, 2012 | Current use: Comm | Permit id: E130703 | Parcel: 0304643010
2012/04/18800010033 Arch St Boston MaKaren Sykes
Renovation of space requiring 4 new a/v and 2 smokes. Doc#20130837
Date:  July 25, 2013

Client: Arch St Tower L | Permit type: Bfd fire alarm installations | Permit id: Bfdf264613 | Parcel: 0304643010
2013/07/2509533 Arch St Boston Ma
Installing 3 new addressable monitor modules for the new dry sprinkler system being installed by sprinkler contractor doc20131530 work to be done per nfpa stands 7 cmr.
Date:  February 10, 2014

Client: Arch St Tower L | Permit type: Bfd fire alarm installations | Permit id: Bfdf324963 | Parcel: 0304643020
2014/02/1009533 Arch St Boston Ma
SCORE
100
Sec - 21st floor minor renoavtions include new office and finishes drywall partition ceiling tiles flooring relocate 4 sprinkler heads and assoacited lighting
Date:  September 15, 2010
Value:   $78,000
Contractor: Francesca Dirico

Client: Arch St Tower L | Permit type: Short form bldg permit | Expiration date: March 15, 2011 | Current use: Comm | Permit id: Sf42745 | Parcel: 0304643020
2010/09/157800010033 Arch St Boston MaFrancesca Dirico
Relocation of existing sprinkler heads to accommodate new ceiling layout 32nd floor
Date:  February 25, 2011

Client: Arch St Tower L | Permit type: Bfd sprinkler system | Permit id: Sprk64365 | Parcel: 0304643020
2011/02/2509533 Arch St Boston Ma
Relocate (3) sprinklers for new ceiling work.
Date:  April 25, 2012

Permit type: Bfd sprinkler system | Permit id: Sprk131050
2012/04/2509533 Arch St Boston Ma
SCORE
100
Demo and rebuild of walls floors ceiling stairs and doors. Also to include carpet and paint
Date:  August 25, 2015
Contractor: Regina Olivieri

Client: Arch St Tower L | Permit type: Bfd construction demo reno | Permit id: Fdc506464 | Parcel: 0304643010
2015/08/25010033 Arch St Boston MaRegina Olivieri
SCORE
82
Installing/relocating audio/visual in tenant space.; 21st floor
Date:  September 2, 2015

Client: Arch St Tower L | Permit type: Bfd fire alarm installations | Permit id: Bfdf502872 | Parcel: 0304643020
2015/09/0208233 Arch St Boston MaErica Burgos J And M Brown Company
SCORE
100
Interior renovation to the 22 23 and 24th floor. Work to include meps fa sprinkler stair infill and architectural finishes.; 3 phase construction.
Date:  September 3, 2015
Value:   $4,000,000
Contractor: Regina Olivieri

Client: Arch St Tower L | Permit type: Long form/alteration permit | Expiration date: March 3, 2016 | Current use: Comm | Permit id: Alt505200 | Parcel: 0304643010
2015/09/03400000010033 Arch St Boston MaRegina Olivieri
SCORE
100
11 th floor
Date:  September 21, 2015
Value:   $3,000
Contractor: Karen Sykes

Client: Arch St Tower L | Permit type: Electrical fire alarms | Expiration date: March 21, 2016 | Current use: Comm | Permit id: Efa521227 | Parcel: 0304643010
2015/09/21300010033 Arch St Boston MaKaren Sykes
Relocate 3 sprinklers on the 22 23 and 24th floors.; work to be done per nfpa stands. 7 cmr. One floor zone at a time.
Date:  September 22, 2015

Client: Arch St Tower L | Permit type: Bfd sprinkler system | Permit id: Sprk520460 | Parcel: 0304643020
2015/09/2209533 Arch St Boston Ma
SCORE
100
Nstar meter installation on 30th floor for new tenant (work order 02058213)
Date:  March 24, 2015
Value:   $1,500
Contractor: William Weber

Client: Arch St Tower L | Permit type: Electrical permit | Expiration date: September 24, 2015 | Current use: Comm | Permit id: E456327 | Parcel: 0304643020
2015/03/24150010033 Arch St Boston MaWilliam Weber
SCORE
100
To install 4 sinks and 2 wh on the 22-24th floors @ 33 arch st.
Date:  September 24, 2015
Value:   $38,000
Contractor: Douglas Howard

Client: Arch St Tower L | Permit type: Plumbing permit | Expiration date: March 24, 2016 | Current use: Comm | Permit id: Pl522419 | Parcel: 0304643020
2015/09/243800010033 Arch St Boston MaDouglas Howard
SCORE
100
Renovation of existing fire alarm devices on floors 22 23 & 24 for tenant fit up. Work to be completed over (3) phases
Date:  October 1, 2015
Value:   $75,000
Contractor: William Weber

Client: Arch St Tower L | Permit type: Electrical fire alarms | Expiration date: April 1, 2016 | Current use: Comm | Permit id: Efa524516 | Parcel: 0304643010
2015/10/017500010033 Arch St Boston MaWilliam Weber
SCORE
95
Fire alarm
Date:  May 18, 2010
Value:   $10,000
Contractor: David Noon

Client: Arch St Tower L | Permit type: Electrical fire alarms | Expiration date: November 18, 2010 | Current use: Comm | Permit id: Efa26303 | Parcel: 0304643010
2010/05/18100009533 Arch St Boston MaDavid Noon
Installation of (2) speaker/ strobe devices (1) strobe only device (1) remote alarm indicator ans (1) addressable smoke detector doc#20100683
Date:  August 19, 2010

Client: Arch St Tower L | Permit type: Bfd fire alarm installations | Permit id: Bfdf37672 | Parcel: 0304643020
2010/08/1909533 Arch St Boston Ma
SCORE
100
Hwh dishwasher
Date:  December 29, 2014
Value:   $3,650
Contractor: Chad Perry

Client: Arch St Tower L | Permit type: Plumbing permit | Expiration date: June 29, 2015 | Current use: Comm | Permit id: Pl437402 | Parcel: 0304643020
2014/12/29365010033 Arch St Boston MaChad Perry
SCORE
91
Renovations on the 32nd floor to include the creation of 2 new offices. Work to include new drywall partitions 2 new outlets relocation of lights patch ceilings new base on new walls paint and relocations of 4 sprinkler heads. No egress or structural changes are to be made.
Date:  July 9, 2010
Value:   $27,000
Contractor: Urshula S Patel

Client: Arch St Tower L | Permit type: Short form bldg permit | Expiration date: January 9, 2011 | Current use: Comm | Permit id: Sf33076 | Parcel: 0304643020
2010/07/09270009133 Arch St Boston MaUrshula S Patel
Renovations to include drywall glass doors &;flooring
Date:  July 19, 2013

Client: Arch St Tower L | Permit type: Bfd construction demo reno | Permit id: Fdc262908 | Parcel: 0304643010
2013/07/1909533 Arch St Boston Ma
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.