Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 70 Replace deckings, railings, and some bracing on an exterior pedestrian foot-bridge Parcel: 530 0013 | |||||
SCORE 56 Deck addition; 265"x120" Parcel: 530 0013 | |||||
SCORE 70 New roof, new roof joists, new wood interior walls Parcel: 530 0013 | |||||
SCORE 62 Renovate existing kitchen, new m. E. P., food service equipment, partitions, flooring & ceiling will be installed. Parcel: 530 0013 | |||||
SCORE 95 Install 10x16 storage shed Parcel: 530 0013 | |||||
SCORE 62 Demo existing grille room & ladies locker room and construct a new bar, grille lounge & dining room. Add p. C. Pedestral pavers on roof and add site walls & pergola. Parcel: 530 0013 | |||||
SCORE 67 Strip and re-roof the golf cart garage building. Dumpster to remain on driveway due to conservation restrictions. Parcel: 530 0013 | |||||
SCORE 69 Demo shed next to bldg a Date: November 22, 2010 Contractor: Stephen B Bowie Parcel: 530 0013 | |||||
SCORE 56 Demolish auxillary building on right of driveway next to caddy shed. Date: May 10, 2010 Contractor: Laurence J Hurley Parcel: 530 0013 | |||||
SCORE 95 Install new x 16 storage shed Parcel: 530 0013 | |||||
SCORE 69 Construct new equipment building with two detached sheds Parcel: 530 0013 | |||||
SCORE 69 Demolish metal building and concrete slab with foundation Parcel: 530 0013 | |||||
SCORE 56 Removal and replacement of existing lap and wading pools and surrounding concrete pool deck. Parcel: 530 0013 |