Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Installation of seventeen 4 x solar thermal panels to roof, closed loop plumbed to 12 g water storage tank Date: August 2, 2013 Applicant: Lisa Walsh Solar Energy Services Inc | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1307123 | |||||
Plumbing and gas Date: August 15, 2013 Applicant: Otto Seidel | Permit status: Completed | Permit id: P1307189 | |||||
Installation of roof mounted 14. 28kw-dc 12. 6kw-ac photovoltaic system. 49, rec 255w modules, two 6500w solar edge inverters. This is a grid tied system, not battery back up installed behind the utility meter by prospect solar, llc. Date: September 23, 2014 Client: Todd Fulmer | Applicant: Clinton Eickelberg | Permit type: Addition alteration | Permit status: Completed | Permit id: B1411778 | |||||
Electrical Date: September 24, 2014 Applicant: William E Breidenbach | Permit status: Completed | Permit id: E1409377 | |||||
Plumbing and gas Date: August 15, 2013 Permit status: Completed | Permit id: P1307189 | |||||
SCORE 96 Electrical Date: September 24, 2014 Contractor: William E Breidenbach Permit status: Completed | Permit id: E1409377 | |||||
SCORE 96 Plumbing and gas Date: November 4, 2015 Contractor: Patrick B. Mcateer Permit status: Completed | Permit id: P1600993 | |||||
Boiler Date: November 4, 2015 Permit status: Permit issued | Permit id: Fb1600020 | |||||
SCORE 93 Electrical Date: November 12, 2015 Contractor: George S Schulz Permit status: Completed | Permit id: E1601276 | |||||
Plumbing and gas Date: August 15, 2013 Permit status: Completed | Permit id: P1307189 | |||||
SCORE 96 Electrical Date: September 24, 2014 Contractor: William E Breidenbach Permit status: Completed | Permit id: E1409377 | |||||
SCORE 96 Plumbing and gas Date: August 15, 2013 Contractor: Otto Seidel Permit status: Completed | Permit id: P1307189 | |||||
SCORE 78 Installation of seventeen 4 x solar thermal panels to roof, closed loop plumbed to 12 g water storage tank Date: August 2, 2013 Contractor: Lisa Walsh Solar Energy Services Inc Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1307123 | |||||
SCORE 86 Installation of roof mounted 14. 28kw-dc 12. 6kw-ac photovoltaic system. 49, rec 255w modules, two 6500w solar edge inverters. This is a grid tied system, not battery back up installed behind the utility meter by prospect solar, llc. Date: September 23, 2014 Contractor: Clinton Eickelberg Client: Todd Fulmer | Permit type: Addition alteration repair | Permit status: Completed | Permit id: B1411778 | |||||
SCORE 96 Plumbing and gas Date: August 15, 2013 Contractor: Otto Seidel Permit status: Completed | Permit id: P1307189 | |||||
SCORE 96 Electrical Date: September 24, 2014 Contractor: William E Breidenbach Permit status: Completed | Permit id: E1409377 | |||||
SCORE 93 Electrical Date: November 12, 2015 Contractor: George S Schulz Permit status: Completed | Permit id: E1601276 | |||||
SCORE 96 Plumbing and gas Date: November 4, 2015 Contractor: Patrick B. Mcateer Permit status: Completed | Permit id: P1600993 | |||||
Boiler Date: November 4, 2015 Permit status: Permit issued | Permit id: Fb1600020 |