Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Hvac change out - split system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: October 4, 2016 Contractor: A S I Hastings Inc Permit type: Residential alteration-addn | Permit status: Issued | Permit id: Pds2016-Resalt- | |||||
Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: October 10, 2016 Permit type: Residential alteration-addn | Permit status: Completed | Completion date: November 2, 2016 | Permit id: Pds2016-Resalt- | |||||
SCORE 80 Re-roof for sfd. If a re-roof project is proposed, the following specifications apply. Existing roofing material asphalt shingles proposed roofing material asphalt shingles manufacturer owens corning brand and model supreme color (if cool roof required) amber built-up roofing assembly system number per attached listing report (if applicable) n/a specific exemption from cool roof requirements (if applicable) n/a required building inspector field verification (if applicable) verify cool roof - 0890-0014 note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Date: January 25, 2016 Contractor: Regan Roofing Inc Permit type: Residential alteration-addn | Permit status: Completed | Completion date: February 23, 2016 | Permit id: Pds2016-Resalt- | |||||
Final Date: October 26, 2016 Permit status: Pass | Permit id: Pds2016-Resalt- |