Provide single fuel drop. 5 gallons, #2 fuel. Fill tank. Prime and start boiler. Boiler must be up and running upon completion of drop or esb fue Date: May 1, 2003 Permit type: Util | Permit id: E321645 | |||||
(apt. #2fl) remove mold and mildew with 50/ bleach and water solution at small rear bedroom ceiling, approx. 9x3, walls, approx. 6x3, 10x1, 8 Date: September 20, 2004 Permit type: Gc | Permit id: E507962 | |||||
Provide single fuel drop with prime and start. #2 fuel. Fill tank. Please report any problems immedialty to esb fuel unit. 212-863-8779 Date: February 10, 2004 Permit type: Util | Permit id: E415258 | |||||
Repair defective oil line. Prime and start boiler. Note: contractor must conatct russell roebuck @ 718 254-8914 with start date. Contractor must Date: June 17, 2002 Permit type: Heat | Permit id: E222071 | |||||
(apt. #2fl) remove mold and mildew with 50 bleach and water solution at small rear bedroom ceiling, approx. 9x3, walls, approx. 6x3, 10x1, 8 Date: September 20, 2004 Permit type: Gc | Permit id: E507962 | |||||
Provide single fuel drop with prime and start. #2 fuel. Fill tank. Please report any problems immediately to esb fuel unit. 212-863-8779 Date: July 12, 2005 Permit type: Util | Permit id: E600682 | |||||
Provide single fuel drop with prime and start. #2 fuel. Fill tank. Please report any problems immediatly to esb fuel unit. 212-863-8779 Date: October 25, 2004 Permit type: Util | Permit id: E510768 | |||||
Doh lead abatement violation: as per rc #20010019786 (abax) and attached scope of work thoroughly remove all lead violations as per department of h Date: October 26, 2001 Permit type: Delead | Permit id: E203999 | |||||
Provide single fuel drop. 5 gallons, #2 fuel. Fill tank. Prime and start boiler. Boiler must be up and running upon completion of dropor esb fue Date: February 14, 2002 Permit type: Util | Permit id: E214888 | |||||
As per rc #20010012859 (emsl), perform total lead analysis of 12 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method Date: November 19, 2001 Permit type: Delead | Permit id: E208632 | |||||
As per rc #20020007864 (emsl), perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method Date: February 20, 2002 Permit type: Delead | Permit id: E215009 | |||||
As per mini rc #k3015 (emsl) and hpd specification perform phase contrast microscopy (pcm) analysis of 12 air samples for fiber content utilizing ni Permit type: Asbest | Permit id: E303075 | |||||
At cellar supply and install a new watermain from city supply line to building, approx. 60. Complete with new service valve . Date: June 9, 2006 Permit type: Plumb | Permit id: E636116 | |||||
As per mini rc # k3015 (emsl) and hpd specification, perform polarized light microscopy (plm) analysis of 04 samples for asbestos content utilizing Date: August 12, 2002 Permit type: Asbest | Permit id: E303071 | |||||
Dismantle 1 existing boiler & remove. Install 1 new boiler pad. Supply & install (1) 5 section c. I. Steam boiler with gpur coil & burner. Modify Date: August 19, 2002 Permit type: Heat | Permit id: E303001 | |||||
As per rc #20010012859 (emsl), perform total lead analysis of 15 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method Date: November 29, 2001 Permit type: Delead | Permit id: E209309 | |||||
As per rc #20020007864 (emsl), perform total lead analysis of 05 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method Date: February 27, 2002 Permit type: Delead | Permit id: E215481 | |||||
Perform asbestos abatement work as per hpd specification throughout basement, on 106 linear feet of pipe insulation and 03 sq. Ft. Of breeching seala Date: August 19, 2002 Permit type: Asbest | Permit id: E303074 | |||||
As per rc #20010012859 (emsl), perform total lead analysis of 02 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method Date: December 10, 2001 Permit type: Delead | Permit id: E210261 | |||||
As per mini rc #k3015 (emsl) and hpd specification perform phase contrast microscopy (pcm) analysis of 12 air samples for fiber content utilizing ni Permit type: Asbest | Permit id: E303075 | |||||
As per mini rc #k3015 (emsl) and hpd specification perform phase contrast microscopy (pcm) analysis of 12 air samples for fiber content utilizing ni Permit type: Asbest | Permit id: E303075 | |||||
As per mini rc #k3015 (emsl) and hpd specification perform phase contrast microscopy (pcm) analysis of 12 air samples for fiber content utilizing ni Permit type: Asbest | Permit id: E303075 | |||||
As per mini rc #k3015 (emsl) and hpd specification perform phase contrast microscopy (pcm) analysis of 12 air samples for fiber content utilizing ni Permit type: Asbest | Permit id: E303075 | |||||
1st floor: replace bath tub waste. Reset tub. Note:contractor must contact h. P. D. @ 718 254-8907 with start date. Contractor must sign and retu Date: July 24, 2002 Permit type: Plumb | Permit id: E300613 | |||||
Make all necessary repairs to leaks from apartment above basement hall. Date: January 12, 2004 Permit type: Gc | Permit id: E411227 | |||||
Remove stagnated water from basement and disinfect floor with lime. Note: contractor must call janice / cordell at (718) 254-8915 or lydia at (718) Date: June 28, 2002 Permit type: Stopag | Permit id: E222775 | |||||
Apartment #1fl. Repair with similar materials approximately 45 sq. Ft. Of wooden rotted floor at 1st. Story public hallway. Remove bathroom fixtures Date: July 30, 2003 Permit type: Gc | Permit id: E325618 | |||||
Public hall: repair all broken and defective plastered surfaces at the public hall ceiling with new gwb. Prime and paint affected area including area Date: June 30, 2006 Permit type: Gc | Permit id: E637832 | |||||
Seal-up and debris removal only 1. Seal all accessible openings at front and rear of building..... Ground level with plywood and stucco (2 doors, 7 Date: July 13, 2010 Permit type: Gc | Permit id: Db00051 | |||||
SCORE 89 Plumbing Date: December 3, 2014 Contractor: Tw Plumbing And Heating Inc Permit status: Permit issued | Permit id: 32024873602 | |||||
Doh clean & dust wipe only: rm # 1 first floor front room rm # 2 first floor rear kitchen rm # 3 stairs from first floor to second floor rm # 4 Date: September 28, 2006 Value: $648 Permit type: Delead | Permit id: E709445 | |||||
As per the attached scope of work, scrub mildewed surfaces with a solution of one cup of chlorine bleach to one gallon of water. A detergent such as t Date: October 1, 2003 Permit type: Gc | Permit id: E405866 | |||||
Clear stoppage at house trap in cellar. Date: May 2, 2002 Permit type: Heat | Permit id: E219583 | |||||
P/a: cellar stair; cover floor with drop cloth (use swp). Demo approx. 9 sq. Ft. Sheet rock soffit ceiling 15 sq. Ft., plaster, tape and compound. Date: May 2, 2002 Value: $357 Permit type: Gc | Permit id: E219581 | |||||
Install approximately ft. Of copper oil line above ground from tank to burner and put down (2) bags of oil absorbent. Date: April 29, 2002 Permit type: Plumb | Permit id: E219312 | |||||
SCORE 98 Equipment work Date: July 12, 2011 Contractor: J.M.C. Contracting Corp Permit status: Permit issued | Permit id: 32024873602 | |||||
SCORE 98 Equipment work Date: December 3, 2010 Contractor: J.M.C. Contracting Corp Permit status: Permit issued | Permit id: 32024873601 | |||||
SCORE 100 Plumbing Date: November 15, 2011 Contractor: Able Plbg Co Richmond Inc Permit status: Permit issued | Permit id: 32024873601 | |||||
P a: cellar stair; cover floor with drop cloth (use swp). Demo approx. 9 sq. Ft. Sheet rock soffit ceiling 15 sq. Ft., plaster, tape and compound. Date: May 2, 2002 Value: $357 Permit type: Gc | Permit id: E219581 | |||||
Remove stagnated water from basement and disinfect floor with lime. Note: contractor must call janice cordell at (718) 254-8915 or lydia at (718) Date: June 28, 2002 Permit type: Stopag | Permit id: E222775 | |||||
Apt#. 1st floor: supply & install 8 deck faucet complete - at kitchen sink. Replace a half length of water supply pipe to kitchen sink with speed Date: May 6, 2002 Permit type: Plumb | Permit id: E219579 | |||||
Apartment #1fl: open-up third floor bathroom and second floor hall wall and ceiling. Trace, locate and repair leaks affecting 2nd and first floors b Date: December 16, 2003 Permit type: Gc | Permit id: E410219 | |||||
Apartment #1fl. Remove bathroom fixtures and demolish the wooden floor approximately 28 sq. Ft. Replace floor, mud set with ceramic tiles and reinst Permit type: Gc | Permit id: E325752 | |||||
Provide single fuel drop. 5 gallons, #2 fuel. Fill tank. Prime and start boiler. Boiler must be up and running upon completion of drop or esb fu Date: July 5, 2002 Permit type: Util | Permit id: E300164 | |||||
(apt. #1fl) make all necessary repairs to #2 oil burner to restore to proper working condition. Ensure adequate heat and hot water to entire buildin Date: January 26, 2005 Permit type: Heat | Permit id: E519225 | |||||
Boiler is wired into 2nd floor lights. Separate boiler and 2nd floor lights and install a new toggle switch for boiler and wire switch to main. Note Date: October 4, 2002 Permit type: Elec | Permit id: E306422 | |||||
#2 oil: boiler need to be trouble shoot for controls theres no power. Note:contractor must contact hpd @ (718) 636-3045 or 636-3037 or 636-3039 w Date: January 6, 2003 Permit type: Heat | Permit id: E312425 | |||||
Provide single fuel drop with prime and start. # 2 fuel. Fill tank. Please report any problems immediately to esb fuel unit [212] 863-5149. Date: December 17, 2003 Permit type: Util | Permit id: E410906 | |||||
Provide single fuel drop with prime and start. #2 fuel. Fill tank. Please report any problems immedialty to esb fuel unit. 212-863-8779 Date: January 19, 2005 Permit type: Util | Permit id: E518608 | |||||
Provide single fuel drop. 5 gallons, #2 fuel. Fill tank. Prime and start boiler. Boiler must be up and running upon completion of drop or esb f Date: December 19, 2002 Permit type: Util | Permit id: E311754 | |||||
As per rc #200400467901 (enviro-probe, inc.), perform total lead analysis of 07 dust wipe sample(s) via environmental protection agency (epa) sw845-3 Date: February 3, 2004 Permit type: Delead | Permit id: E414778 | |||||
1st floor bathroom: install showerbody with trim and anti-scold type. Note:contractor must contact h. P. D. @ 718 254-8907 with start date. Contra Date: July 16, 2002 Permit type: Plumb | Permit id: E300616 | |||||
Apartment #1fl. Remove bathroom fixtures and demolish the wooden floor approximately 28 sq. Ft. Replace floor, mud set with ceramic tiles and reinst Permit type: Gc | Permit id: E325752 | |||||
Apartment #1fl. Remove bathroom fixtures and demolish the wooden floor approximately 28 sq. Ft. Replace floor, mud set with ceramic tiles and reinst Permit type: Gc | Permit id: E325752 | |||||
Apartment #1fl. Remove bathroom fixtures and demolish the wooden floor approximately 28 sq. Ft. Replace floor, mud set with ceramic tiles and reinst Permit type: Gc | Permit id: E325752 | |||||
Apartment #1fl. Remove bathroom fixtures and demolish the wooden floor approximately 28 sq. Ft. Replace floor, mud set with ceramic tiles and reinst Permit type: Gc | Permit id: E325752 | |||||
As per rc #2004000467903 (enviro-probe, inc.), (iatl)perform total lead analysis of 17 dust wipe sample(s) via environmental protection agency (epa) Date: September 13, 2004 Permit type: Delead | Permit id: E507812 | |||||
As per rc #2004000467903 (enviro-probe, inc.), perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw845-3 Date: September 9, 2004 Permit type: Delead | Permit id: E507707 | |||||
Erp doh lead abatement violation: as per rc #20030025842 (abax) and attached scope of work thoroughly remove all lead violations as per new york city Date: June 10, 2004 Permit type: Delead | Permit id: E425359 | |||||
As per rc #2004000467903 (enviro-probe, inc.), perform total lead analysis of 05 dust wipe sample(s) via environmental protection agency (epa) sw845-3 Date: August 31, 2004 Permit type: Delead | Permit id: E507092 | |||||
As per rc #2004000467903 (enviro-probe, inc.), perform total lead analysis of dust wipe sample(s) via environmental protection agency (epa) sw845-3 Date: August 11, 2004 Permit type: Delead | Permit id: E505419 | |||||
As per rc #2004000467903 (enviro-probe, inc.), perform total lead analysis of 06 dust wipe sample(s) via environmental protection agency (epa) sw845-3 Date: August 13, 2004 Permit type: Delead | Permit id: E505953 | |||||
As per rc #2004000467901 (enviro-probe, inc.), perform total lead analysis of 17 dust wipe sample(s) via environmental protection agency (epa) sw845 Permit type: Delead | Permit id: E500074 | |||||
As per rc #20070012325 (enviro-probe, inc.), perform total lead analysis of 36 dust wipe sample(s) via environmental protection agency (epa) sw845-305 Date: November 8, 2006 Permit type: Delead | Permit id: E712724 | |||||
As per rc #2004000467901 (enviro-probe, inc.), perform total lead analysis of 17 dust wipe sample(s) via environmental protection agency (epa) sw845 Permit type: Delead | Permit id: E500074 | |||||
As per rc #2004000467901 (enviro-probe, inc.), perform total lead analysis of 17 dust wipe sample(s) via environmental protection agency (epa) sw845 Permit type: Delead | Permit id: E500074 | |||||
As per rc #2004000467901 (enviro-probe, inc.), perform total lead analysis of 17 dust wipe sample(s) via environmental protection agency (epa) sw845 Permit type: Delead | Permit id: E500074 | |||||
As per rc #2004000467901 (enviro-probe, inc.), perform total lead analysis of 17 dust wipe sample(s) via environmental protection agency (epa) sw845 Permit type: Delead | Permit id: E500074 |