Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Add new bedroom, full bathroom, and utility closet in basement. Removal of load bearing walls on first floor. Relocate existing kitchen and add new half bathroom on first floor. Reconfigure bedroom and bathroom layout on second floor. Add new w/d closet on second floor. Add new two story wooden deck at rear. Date: October 9, 2015 Client: Phyllis Bojan | Applicant: Emily Hirst | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1600361 | |||||
SCORE 92 Interior demolition of non-bearing elements in a space up to 5,0 square feet (464. 5 square meters) Date: July 24, 2015 Contractor: Louis Bojan Client: Louis Bojan | Permit type: Building | Permit status: Permit issued | Permit id: Pc53462693 | |||||
SCORE 56 First extension for building permit b1600361 Date: February 14, 2017 Contractor: Phyllis Bojan; Emily Hirst Client: Phyllis Bojan | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1704673 | |||||
SCORE 96 Add new bedroom, full bathroom, and utility closet in basement. Removal of load bearing walls on first floor. Relocate existing kitchen and add new half bathroom on first floor. Reconfigure bedroom and bathroom layout on second floor. Add new w/d closet on second floor. Add new two story wooden deck at rear. Date: October 9, 2015 Contractor: Emily Hirst Client: Phyllis Bojan | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1600361 |