Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Date: September 19, 2005 Permit id: 05-09-125 | Parcel: 001010001000 | |||||
Date: June 1, 2006 Permit id: 06-06-005 | Parcel: 001010001000 | |||||
Date: June 7, 2007 Permit id: 07-06-085 | Parcel: 072261015000 | |||||
SCORE 100 Install 1" water meter; new sfd, bridgeway lakes 2 phase 3. Temporary water paid for six months from issuance date. Date: October 4, 2005 Contractor: Meritage Homes Permit id: 05-1419 | Parcel: 072261014000 | |||||
SCORE 80 Install 1" water meter: new sfd, bridgeway lakes 2 phase 3. Temporary water paid for six monthe from issuance. Date: June 19, 2006 Contractor: Meritage Homes Of Northern California Inc Permit id: 06-0429 | Parcel: 072261008000 | |||||
SCORE 56 Gunite pool and spa w elec. All work shall comply with city standards. Access is limited to site driveway. Soil relocation requires written permission from receiving location. A pre-inspection is required! Final engineering encroachment inspection is required prior to building permit final inspection. Engineering inspection request line (916) 617-4692 any damage to the curb, gutter, sidewalk or landscape will be repaired prior to finalization of encroachment permit and deposit refund. Date: June 8, 2007 Contractor: Cross Creek Pools And Landscaping Permit id: 07-0595 | Parcel: 072261015000 |