Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Misc electrical for service upgrade from 1 to 2 amps for existing sfd Date: June 18, 2012 Permit type: Electrical : 80 - ac | Permit status: Inspection phase | Permit id: Pds2012-1007-20 | |||||
Fico 408 sqft 2-story sfd addition, 118 sqft balcony, 367 sqft attached finished garage. 12 31 12: packet purged... Vmt Date: December 8, 2010 Value: $73,516 Permit type: Building : 43 - res | Permit status: Application expired | Permit id: Pds2010-1001-20 | |||||
Fico 408 sqft 2-story sfd addition, 118 sqft balcony, 367 sqft attached finished garage. 12/31/12 packet purged... Vmt Date: December 8, 2010 Value: $73,516 Permit type: Residential alteration-addn | Permit status: Pc expired | Permit id: Pds2010-1001-20 | |||||
Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: March 14, 2016 Permit type: Residential alteration-addn | Permit status: Completed | Completion date: March 22, 2016 | Permit id: Pds2016-Resalt- | |||||
SCORE 68 Misc electrical for service upgrade from 1 to 2 amps for existing sfd Date: June 18, 2012 Contractor: Light Connector Permit type: Residential alteration-addn | Permit status: Issued about to expire | Permit id: Pds2012-1007-20 | |||||
Fico 408 sqft 2-story sfd addition, 118 sqft balcony, 367 sqft attached finished garage. 12 31 12 packet purged... Vmt Date: December 8, 2010 Value: $73,516 Permit type: Residential alteration-addn | Permit status: Pc expired | Permit id: Pds2010-1001-20 | |||||
SCORE 96 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: March 14, 2016 Contractor: Joe Moore Construction Inc Permit type: Residential alteration-addn | Permit status: Completed | Completion date: March 22, 2016 | Permit id: Pds2016-Resalt- | |||||
Final Date: March 16, 2016 Permit status: Pass | Permit id: Pds2016-Resalt- | |||||
Building site inspection Date: August 23, 2005 Permit status: Done | Permit id: Pds2005-1001-20 | |||||
Rough electric Date: July 13, 2012 Permit status: Pass | Permit id: Pds2012-1007-20 |