Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 96 Remodel of 1,634 sf on three levels -- basement remodel to create a 3 4 bathroom and a bedroom, main level remodel of 123 sf to reconfigure walls, and upper level remodel of 7 sf to create new master suite and add an additional bathroom, modify roofline to create new dormer with window seat below w less than 6foot of headroom and add 32 sf deck balcony off the new master bedroom. Remove exterior building finish, remove bay window, add 2 inches of rigid foam, install stucco system. No change to setbacks, height, far, or bldg. Coverage. Client: Vivienne Watner | Applicant: Skycastle Homes, Llc | Permit type: Building, electrical | Permit status: Cmp | Completion date: March 31, 2014 | Current use: Single family d | |||||
SCORE 96 Interior non-structural demolition of finishes and wall materials. No exterior and no structural demolition aproposed or alloowed under the scope of this permit. ![]() ![]() Client: Vivienne Watner | Applicant: Skycastle Homes, Llc | Permit type: Demolition | Permit status: Cmp | Completion date: April 22, 2013 | Current use: Single family d | |||||
SCORE 100 Abandon existing 3 4inch water service and tap new 1inch service, install meter pit associated with pmt2013-00646 ![]() ![]() Client: Vivienne Watner | Applicant: E-Z Excavating, Inc | Permit type: Water, right-of-way | Permit status: Iss | |||||
SCORE 100 Service change to 2 amp service. ![]() ![]() Client: Vivienne Watner | Applicant: Crystal Electric Inc | Permit type: Electrical | Permit status: Cmp | Completion date: July 16, 2014 | Current use: Single family d | |||||
SCORE 100 Gas service renewal bia directional bore, pit & pothole, job# 12224796 ![]() ![]() Client: Vivienne Watner | Applicant: Xcel Energy | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 100 Remodel of 1,634 sf on three levels -- basement remodel to create a 3 4 bathroom and a bedroom, main level remodel of 123 sf to reconfigure walls, and upper level remodel of 7 sf to create new master suite and add an additional bathroom, modify roofline to create new dormer with window seat below w less than 6foot of headroom and add 32 sf deck balcony off the new master bedroom. Remove exterior building finish, remove bay window, add 2 inches of rigid foam, install stucco system. No change to setbacks, height, far, or bldg. Coverage. Client: Vivienne Watner | Permit type: Building, electrical, mechanical, plumbing, water, siding, roofing | Permit status: Cmp | Completion date: March 31, 2014 | Current use: Single family detached dwelling, remodel | Permit id: Pmt2013-00646 | |||||
SCORE 100 Interior non-structural demolition of finishes and wall materials. No exterior and no structural demolition aproposed or alloowed under the scope of this permit. ![]() ![]() Client: Vivienne Watner | Permit type: Demolition | Permit status: Cmp | Completion date: April 22, 2013 | Current use: Single family detached dwelling, existin | Permit id: Pmt2013-00647 | |||||
SCORE 95 Abandon existing 3 4inch water service and tap new 1inch service, install meter pit associated with pmt2013-00646 ![]() ![]() Client: Vivienne Watner | Permit type: Water, right-of-way | Permit status: Iss | Permit id: Pmt2013-02399 | |||||
SCORE 100 Service change to 2 amp service. Client: Vivienne Watner | Permit type: Electrical | Permit status: Cmp | Completion date: July 16, 2014 | Current use: Single family detached dwelling, existin | Permit id: Pmt2013-02719 | |||||
Gas service renewal bia directional bore, pit & pothole, job# 12224796 ![]() Client: Vivienne Watner | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2015-03135 |