Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Electrical permit Date: July 14, 2011 Client: Weinstein Robert B | Permit status: Expired | Permit id: 353018 | |||||
Electrical permit Date: June 27, 2013 Client: Weinstein Robert B | Permit status: Completed | Permit id: 480115 | |||||
Electrical permit Date: October 1, 2008 Client: Weinstein Robert B | Permit status: Completed | Permit id: 175971 | |||||
Alteration permit Date: July 19, 2011 Client: Weinstein Robert B | Permit status: Expired | Permit id: 339069 | |||||
Use permit Date: June 16, 2011 Client: Weinstein Robert B | Permit status: Completed | Permit id: 347874 | |||||
Electrical permit Date: June 27, 2013 Client: Weinstein Robert B | Permit status: Completed | Permit id: 480115 | |||||
Electrical permit Date: October 1, 2008 Client: Weinstein Robert B | Permit status: Completed | Permit id: 175971 | |||||
Use permit Date: June 16, 2011 Client: Weinstein Robert B | Permit status: Completed | Permit id: 347874 | |||||
Alteration permit Date: July 19, 2011 Client: Weinstein Robert B | Permit status: Expired | Permit id: 339069 | |||||
Electrical permit Date: July 14, 2011 Client: Weinstein Robert B | Permit status: Expired | Permit id: 353018 | |||||
SCORE 100 Install 1-100a,1phase sub panel,2 fluorescent lts,1-240v- kiln crct,1 sw,4 recepts and 1 tenent sub meter all wiring in mc or emt as needed as per 2008 nec (artist tenant spaces) Date: June 27, 2013 Contractor: 21st Century Electric Inc Client: Weinstein Robert B | Permit type: Electrical permit | Permit status: Completed | Completion date: September 30, 2013 | Permit id: 480115 | |||||
In existing 6 story building including basement, use permit for the existing uses listed; artist gallery in basement, artist gallery and studio spaces and offices on,(1st),floor , artist studio spaces and textile sewing workshops on (2nd) second floor, artist studio spaces and galleries on 3rd, 4th 5th and 6th floors floors above Date: March 22, 2017 Client: Weinstein Robert B | Permit type: Use permit | Permit status: Completed | Completion date: March 22, 2017 | Permit id: 768521 | |||||
SCORE 100 Installation of 14 lighting fixtures, 7 switches and 28 outlets as per 2008 nec Date: July 14, 2011 Contractor: William Torchiana Iii Client: Weinstein Robert B | Permit type: Electrical permit | Permit status: Expired | Completion date: July 14, 2011 | Permit id: 353018 | |||||
SCORE 100 Basement thru 6th floor use as art gallery. 1st floor use as offices art gallery Date: June 16, 2011 Contractor: Alder Construction Llc Client: Weinstein Robert B | Permit type: Use permit | Permit status: Completed | Completion date: June 16, 2011 | Permit id: 347874 | |||||
SCORE 100 Erect non load bearing partition walls in an existing art studio. Fire rated assemblies are required to be maintained at all times. Electrical, plumbing, and mechanical work requires additional permits. Call the inspector prior to starting work. Date: July 19, 2011 Contractor: Alder Construction Llc Client: Weinstein Robert B | Permit type: Alteration permit | Permit status: Expired | Completion date: December 6, 2012 | Permit id: 339069 | |||||
SCORE 100 Install (3) ceiling fans in two rooms to legalize work done by another contractor as per 2005 nec (cc district) Date: October 1, 2008 Contractor: Aubrey Green Elect Client: Weinstein Robert B | Permit type: Electrical permit | Permit status: Completed | Completion date: January 13, 2009 | Permit id: 175971 | |||||
Use registration to reflect as shown in submitted floor plans Date: July 28, 2017 Client: Weinstein Robert B | Permit type: Use permit | Permit status: Completed | Completion date: July 28, 2017 | Permit id: 803294 | |||||
SCORE 56 Make safe permit - for the removal of fire damaged stairs within stair tower 4 and for the construction of replacement stairs in kind within existing rated enclosure. Entire structure, including stair enclosure is sprinklered. Separate permit required for repairs to standpipe. Work to comply with case no 590639. Separate permit required to document the approved special inspectors. Permit received from downstairs certified mail rtn, undeliverable 8 29 17 Date: August 16, 2017 Contractor: Jm Potts And Company Client: Weinstein Robert B | Permit type: Alteration permit | Permit status: Completed | Completion date: October 24, 2017 | Permit id: 801268 | |||||
Limited interior alterations including installation of one (1) hour rated partitions at selection locations per plans; self-closing fire doors in new or modified openings, fully accessible unisex toilet room at third floor and exit signage throughout. Certificate of occupancy for entire building with lawful occupancy sign at third floor. Separate permits required for all electrical plumbing fire suppression work. Date: July 28, 2017 Client: Weinstein Robert B | Permit type: Alteration permit | Permit status: Active | Completion date: October 18, 2017 | Permit id: 768581 | |||||
SCORE 100 Add 2 urinals - the installation will comply with the philadephia plubming code 2004 Date: June 15, 2017 Contractor: Fred Jonas Plumbing Heating And Client: Weinstein Robert B | Permit type: Plumbing permit | Permit status: Completed | Completion date: August 31, 2017 | Permit id: 792235 | |||||
SCORE 100 Ez permit re-roofing- for the installation of new roof coverings on exiting roofs as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Install 12 square of oc supreme shingles. Install drip edge and ice and water shield and ridge vent and flashing. Install new roof as per manufacturers specifications. New roof coverings shall not be installed without removing all existing layers when the roof has two or more applications of any type of roof covering. Contractor must submit roof certification for final inspection. Tear original material install insulation fully adhere tpo membrane complete tpo roof detailing. Date: October 31, 2017 Contractor: Ne Contractors Inc Client: Weinstein Robert B | Permit type: Alteration permit | Permit status: Active | Completion date: November 22, 2017 | Permit id: 815219 | |||||
SCORE 100 Replace existing combination exit signs, light fixtures and install 4 baseboard electric heaters. In north fire tower. Repalce 6 existing combination exit signs andadd 4 baseboad electric heaters in west fire tower as per 2008 nec. Date: October 23, 2017 Contractor: David Simpson Client: Weinstein Robert B | Permit type: Electrical permit | Permit status: Active | Completion date: October 23, 2017 | Permit id: 826202 | |||||
SCORE 100 Replace 12 electric strikes for interior exit doors leading to stair towers in same locations with no additonal wiring as per nfpa72 (cc district) Date: October 31, 2017 Contractor: B H Holding Company Client: Weinstein Robert B | Permit type: Electrical permit | Permit status: Active | Completion date: October 31, 2017 | Permit id: 812008 | |||||
For the installation of wet pipe automatic sprinklers in accordance with nfpa 13 within the west stair tower landing at each level, a type i 4" standpipe installed in accordance with nfpa 14 within the west stair tower, a new 6" backflow prevention device within the basement, and a new fire pump installed in accordance with nfpa within the basement, as per plans; using existing sprinkler system installed throughout existing six (6) story structure used as artists studios artisan industrial, cultural exhibits, and offices. Date: October 23, 2017 Client: Weinstein Robert B | Permit type: Suppression permit | Permit status: Active | Completion date: October 31, 2017 | Permit id: 817985 |