Content |
---|
SCORE 95 Replacement of two boilers in existing mechanical room. First boiler to be 267 mbtuh, second boiler to be 376 mbtuh. ![]() ![]() Client: Shelter Boulder | Applicant: Timberline Mechanical Systems | Permit type: Mechanical | Permit status: Cmp | Completion date: June 29, 2015 | Current use: Multifamily dwe |
SCORE 95 Replacement of two boilers in existing mechanical room. First boiler to be 267 mbtuh, second boiler to be 376 mbtuh. Client: Shelter Boulder | Permit type: Mechanical | Permit status: Cmp | Completion date: June 29, 2015 | Current use: Multifamily dwellings, existing | Permit id: Pmt2015-01261 |
SCORE 79 Remington post-total tear-off & reroof of mfd, 55. 93 squares of built-up asphalt on a pitch represented as 1 8inch per foot. New polyiso to be installed and inpected at midroof inspection. Densdeck to be installed to achieve class a rating. Mid-roof inspection required if pitch is less than 4 12. ![]() ![]() Client: Shelter Boulder | Applicant: Central States Roofing & Insulating | Permit type: Roofing | Permit status: Iss | Current use: Multifamily dwe |
SCORE 79 Remington post-total tear-off & reroof of mfd, 55. 93 squares of built-up asphalt on a pitch represented as 1 8inch per foot. New polyiso to be installed and inpected at midroof inspection. Densdeck to be installed to achieve class a rating. Mid-roof inspection required if pitch is less than 4 12. Client: Shelter Boulder | Permit type: Roofing | Permit status: Cmp | Completion date: March 7, 2016 | Current use: Multifamily dwellings, existing | Permit id: Pmt2014-00512 |
SCORE 84 Installation of a degreee tilt-up ballasted grid-tie 34. 5 kw photovoltaic system on multifamily building #31 at the remington post complex. Array to be nested in a lower roof area and remain below top edge of existing parapet wall -- shadow of array will not leave the rooftop. See engineerfoots letter and drawings for specific information. Client: Shelter Boulder | Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 10, 2012 | Current use: Multifamily dwellings, existing | Permit id: Pmt2011-05127 |
SCORE 84 Installation of a degreee tilt-up ballasted grid-tie 34. 5 kw photovoltaic system on multifamily building #31 at the remington post complex. Array to be nested in a lower roof area and remain below top edge of existing parapet wall -- shadow of array will not leave the rooftop. See engineerfoots letter and drawings for specific information. ![]() ![]() Client: Shelter Boulder | Applicant: Diversified Electric & Controls | Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 10, 2012 | Current use: Multifamily dwe |
SCORE 82 Remove existing roofing and re-roof condo building with epdm, 1 squares, flat roof. ![]() ![]() Applicant: Bradley Bros Roofing | Permit type: Roofing | Permit status: Cmp | Completion date: October 21, 2011 | Current use: Multifamily dwe |
SCORE 82 Remove existing roofing and re-roof condo building with epdm, 1 squares, flat roof. Permit type: Roofing | Permit status: Cmp | Completion date: October 21, 2011 | Current use: Multifamily dwellings, existing | Permit id: Pmt2011-04103 |
SCORE 59 Residing entire condo building. ![]() ![]() Client: Jason Potter | Applicant: Platte River Capital Projects | Permit type: Siding | Permit status: Cmp | Completion date: May 8, 2009 | Current use: Multifamily dwe |
SCORE 59 Residing entire condo building. Client: Jason Potter | Permit type: Siding | Permit status: Cmp | Completion date: May 8, 2009 | Current use: Multifamily dwellings, existing | Permit id: Pmt2009-01125 |
Contractor Rank | Contractor Details | Number of Projects | Avg. Project Cost | Years in Business | Photos |
---|---|---|---|---|---|
SCORE 100 | John Mclaughlin | 6,734 Projects | $132,014 Avg. Project Cost | 10 Years in Business | ![]() |
SCORE 100 | Renewal By Andersen | 2,766 Projects | $7,573 Avg. Project Cost | 12 Years in Business | ![]() |
SCORE 99 | Richard Taylor | 238 Projects | $51,490 Avg. Project Cost | 18 Years in Business | ![]() |
SCORE 99 | Brian Field | 161 Projects | $73,354 Avg. Project Cost | 16 Years in Business | ![]() |
SCORE 99 | John Ryan | 1,271 Projects | $37,669 Avg. Project Cost | 21 Years in Business | ![]() |