Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
To demolish a 1 story warehouse ![]() Current use: Retail sales | Permit id: 200405214484 | |||||
To erect a new 5 story mixed use building (1 res., retail, workspaces, parking) ![]() Current use: Retail sales | Permit id: 200405214487 | |||||
SCORE 99 To erect a new 5 story mixed use building (workspaces retail 1 residental parking) Current use: Retail sales | Permit id: #200405214487 | |||||
SCORE 67 Instl 1 ton heat pump split sys to serve i. T. Rm on 1 fl(slab on grade) hilti anchors to be used. Current use: Office | Permit id: #200507268626 | |||||
SCORE 99 Revision to pa# 2004 05 21 4487 s1 r1 - foundation to podium slab as per plans. Current use: Retail sales | Permit id: #200609283666 | |||||
SCORE 100 To install fire sprinkler system Current use: Retail sales | Permit id: #200612260533 | |||||
SCORE 99 This permit application is to revise the occupancy classification on the site permit 200405214487 s r4 for the work spaces from b to f-1. This will correct the record to reconcile the work spaces with the correct use class Current use: Workshop commer | Permit id: #200704309994 | |||||
SCORE 99 Build out of nefw space - kitchen interior finishes for cafe change of use b1 to a-3. Add 2 hr glazing. Extg permit appl for new bldg 200405214487. Current use: Food/beverage h | Permit id: #200705040455 | |||||
SCORE 79 Fire sprinkler alarm monitoring system and elevator recall. Comploaint #200669688. Current use: Office | Permit id: #200708028547 | |||||
SCORE 95 To renew app#2006 09 28 3666 2004 05 21 4484 & 2007 04 30 9994 for final inspection. Current use: Workshop commer | Permit id: #200801152552 | |||||
SCORE 99 Design retail space and a portion of the space (25%) will be used as an espresso bar by adding sink & counter. Current use: Retail sales | Permit id: #200806114147 | |||||
Comply with fire department notice of violation provide second means of egress. ![]() Current use: Food/beverage h | Permit id: #200912163366 | |||||
SCORE 95 To obtain final inspection for work approved under pa # 9725449. All work is complete. Current use: Office | Permit id: #200912173438 | |||||
SCORE 99 To obtain final inpsection for work approved under pa #200708028547 all work has been completed. Current use: Office | Permit id: #200904277147 | |||||
SCORE 100 Comply with fire department notice of violation provide second means of egress. Partial disabled upgrade at entry. Final previously completed work for appl. 9725449 which expired. Otain occupant load verification. Documentation of work related to 9725449 for partition and windows at dining rm #2. Current use: Food/beverage h | Permit id: #200912163366 | |||||
Office ti on the 1st floor. Combine suite 1`01 and 101 b minor interior demo new partitions doors framesm relocationof lights minir elect. Work and case work. Mech fire alarm under separate permit. ![]() Current use: Office | Permit id: #201107059488 | |||||
SCORE 100 Demo only of interior non-structural partitions door frames suspended ceiling and millwork. As per ab-017 Current use: Office | Permit id: #201210091598 | |||||
SCORE 100 Interior demolition of non-structural interior partition walls. Demo only per ab-017. T. I. Under separate permit. Current use: Office | Permit id: #201204138236 | |||||
Interior refurbishment of bldg corridors 2nd floor restrooms & one tenant suite on the 2nd floor. Scope includes new-non-rated partitoins lighting restroom fixtures & interior finishes. No structural work deferred submittals for mechanical electrical including lighting fire life safety). ![]() Current use: Office | Permit id: #201206293764 | |||||
SCORE 100 Non-structural painted sign Permit id: #201206293800 | |||||
SCORE 100 Interior refurbishment of bldg corridors 2nd floor restrooms & one tenant suite on the 2nd floor. Scope includes new-non-rated partitoins lighting restroom fixtures & interior finishes. No structural work deferred submittals for mechanical electrical including lighting fire life safety). Current use: Office | Permit id: #201206293764 | |||||
SCORE 100 Add (2) pendent fire sprinklers plug (1) upright install (4) branchline restraints. T. I ref # to pa# 201206293764. Current use: Office | Permit id: #201208288389 | |||||
Suite 102. Demolition of non-load bearing partitions doors & lights restrooms per ab-017 remains vacant. ![]() Current use: Office | Permit id: #201301158041 | |||||
SCORE 100 T. I. On 3 floors including (n) restrooms offices break room stairs partitions casework closets dining area. Mep sprinklers under separate permit. Current use: Office | Permit id: #201302140233 | |||||
SCORE 100 Interior sprinkler renovations including water curtain around verticle stair opening. 15 rel0cated sprinklers 66 new sprinklers; to include seismic bracing. T. I ref pa# 201302140233. Current use: Office | Permit id: #201303041386 | |||||
SCORE 100 Installation of a new catering prep and storage area in a pre approved location to serve an approved office lunch room Current use: Office | Permit id: #201303111932 | |||||
SCORE 100 Fire alarm system. Fire sprinkler monitoring system. Ref:201302140233 Current use: Office | Permit id: #201303212736 | |||||
SCORE 100 Tenant improvement inclues new walls doors glazing lighting casework finishes and remodel restrooms in kind. Mep to be design build under separate permits. Current use: Office | Permit id: #201306058761 | |||||
SCORE 100 Interior sprinkler renovations Current use: Office | Permit id: #201306179705 | |||||
SCORE 100 Installation of self supported bicycle storage rack in a private parking lot not visible to the public Current use: Office | Permit id: #201307262860 | |||||
SCORE 100 1st floor suite 102 - fire alarm work - additional horn strobe & strobe light for a t. I. Ref #2013. 06. 05. 8761 Current use: Office | Permit id: #201308073699 | |||||
SCORE 100 4 new workstation clusters ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20150123221 | |||||
SCORE 95 Voice and data communications cabling ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20121203641 | |||||
Revision to pa# 2004 05 21 4487 s1 r1 - foundation to podium slab as per plans. ![]() ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Expiration date: September 28, 2006 | Current use: Retail sales | Permit id: 200609283666 | |||||
SCORE 100 Fire sprinkler 2nd floor ti unit 207- add 12 pendents for new ceilings- 2015 0729 2815 maher na Permit type: Building permit | Current use: Office | Permit id: #201509025865 | |||||
SCORE 96 2nd floor: mep for work done under pa 2015 0729 2815 Permit type: Building permit | Current use: Office | Permit id: #201509167113 | |||||
SCORE 96 Demo of existing suites 205 and 207 to connect with suite 200. New partitions glazing doors ceiling lighting elec and finishes. Maher not req Permit type: Building permit | Current use: Office | Permit id: #201507292815 | |||||
SCORE 96 No change to building envelope. No change to square footage. 28 sf minior interior tenant improvement including: partial demo of breakroom cabinetry installation of accent lighting. Elec & t-24 under separate permit. Permit type: Building permit | Current use: Office | Permit id: #201501095386 | |||||
SCORE 96 1st floor:replace subfloor damaged by flood water in designated area. Approx 9 sq ft in kind. No structural work. Maher not required Permit type: Building permit | Current use: Office | Permit id: #201501216299 | |||||
SCORE 73 Voice and data cabling for suite 202 ![]() ![]() Permit type: Electrical permit | Permit status: Complete | Permit id: Ew20150203641 | |||||
Revision (as-built) of project -sprinkler system. Sprinkler main size reduced to 2 1/2" calculation revised. Plans revised are sheets fs-6 and fs-7 only. This is revision to permit #2004/05/21/4487 s4 ![]() Permit type: Otc alterations permit | Permit status: Filed | Completion date: August 13, 2007 | Current use: Food/beverage hndlng | Permit id: 200708139536 | |||||
SCORE 100 Install 11 outlets 1 track light and 2 or 3 switches in the unit. ![]() ![]() Permit type: Electrical permit | Permit status: Complete | Permit id: Ew20110615561 | |||||
SCORE 100 General kitchen work including new receptacles & light fixturs. ![]() ![]() Permit type: Electrical permit | Permit status: Complete | Permit id: Ew20130618301 | |||||
SCORE 100 3rd floor electrical portion of firelife safety inspection ![]() ![]() Permit type: Electrical permit | Permit status: Complete | Permit id: Ew20130618325 | |||||
SCORE 100 Firelife electrical inspection for 1st floor - per chief inspector ron allen ![]() ![]() Permit type: Electrical permit | Permit status: Complete | Permit id: Ew20130618322 | |||||
SCORE 100 Electrical portion of fire life safety installation ![]() ![]() Permit type: Electrical permit | Permit status: Complete | Permit id: Ew20130618324 | |||||
SCORE 100 Tenant improvement of partial floors 1 2 & all of floor 3 ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20130314521 | |||||
SCORE 100 New lighting & offices on 2nd floor ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20130319001 | |||||
SCORE 100 New lighting & general office space on third floor ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20130319021 | |||||
SCORE 73 1st floor: data communications and wireless systems: number of cables (42) ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: E201303209355 | |||||
SCORE 73 3rd floor: data communications and wireless systems: number of cables (42) ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: E201303209361 | |||||
SCORE 73 2nd floor: data communications and wireless systems: number of cables (42) ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: E201303209360 | |||||
To renew app#2006/09/28/3666 2004/05/21/4484 & 2007/04/30/9994 for final inspection. ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: January 15, 2008 | Expiration date: May 15, 2008 | Current use: Workshop commercial | Permit id: 200801152552 | |||||
SCORE 93 The installation of 32 modular workstations ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20150305981 | |||||
Electrical permit for the installation of (85) new modular workstations ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20130506621 | |||||
To erect a new 5 story mixed use building (workspaces retail 1 residental parking) ![]() Permit type: New construction | Permit status: Complete | Completion date: May 21, 2004 | Expiration date: January 14, 2010 | Permit id: 200405214487 | |||||
To obtain final inpsection for work approved under pa #200708028547 all work has been completed. ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: April 27, 2009 | Expiration date: April 22, 2010 | Current use: Office | Permit id: 200904277147 | |||||
SCORE 95 Bei job number c15-274 furnish and install (9) furniture pods with (2) cat5e white plenum data cables complete with orange rj45 jacks white faceplates testing and labeling. ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20151116429 | |||||
SCORE 88 The installation of modular workstations ![]() ![]() Permit type: Electrical permit | Permit status: Complete | Permit id: Ew20151117841 | |||||
Revision to pa# 2004/05/21/4487 / s1/r1 - foundation to podium slab as per plans. ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: September 28, 2006 | Expiration date: April 15, 2007 | Current use: Retail sales | Permit id: 200609283666 | |||||
SCORE 100 Replace existing fixtures in corridors and stairwells on floors 1-3. Supply & install fixtures and receptacles for spec suite on 2nd floor. ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20120918481 | |||||
Cti 1 ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: July 23, 1990 | Expiration date: August 15, 1991 | Current use: Office | Permit id: 9014498 | |||||
SCORE 100 Add (2) pendent fire sprinklers plug (1) upright install (4) branchline restraints. T. I ref # to pa# 201206293764. Permit type: Building permit | Expiration date: December 28, 2012 | Current use: Office | Permit id: #201208288389 | |||||
SCORE 100 Interior demolition of non-structural interior partition walls. Demo only per ab-017. T. I. Under separate permit. Permit type: Building permit | Expiration date: April 13, 2013 | Current use: Office | Permit id: #201204138236 | |||||
SCORE 96 2nd floor: new sink new bathroom fixtures. ![]() ![]() Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20120829175 | |||||
SCORE 100 Add 2 pendent sprinklers plug 1 upright sprinkler install 4 branchline restraints. ![]() ![]() Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20120828150 | |||||
Construct additional private offices in exiting office space ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: January 29, 1998 | Expiration date: July 29, 1998 | Current use: Office | Permit id: 9801616 | |||||
Renewal of application 9801616 for final inspection ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: September 15, 2000 | Expiration date: January 15, 2001 | Current use: Office | Permit id: 200009150665 | |||||
To demolish a 1 story warehouse Permit type: Demolitions | Permit status: Expired | Completion date: May 21, 2004 | Expiration date: February 13, 2006 | Current use: Retail sales | Permit id: 200405214484 | |||||
Change main entry & rear entry doors ![]() Permit type: Additions alterations or repairs | Permit status: Cancelled | Completion date: March 14, 1994 | Current use: Office | Permit id: 9403916 | |||||
Fire alarm system. Fire sprinkler monitoring system. Ref:201302140233 ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: March 21, 2013 | Expiration date: March 16, 2014 | Current use: Office | Permit id: 201303212736 | |||||
Tenant improvement . ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: July 15, 1991 | Expiration date: September 6, 1992 | Current use: Office | Permit id: 9112340 | |||||
SCORE 100 Work category: 5p; new break room. Kmc #15130 ![]() ![]() Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20150804237 | |||||
SCORE 100 T. I. On 3 floors including (n) restrooms offices break room stairs partitions casework closets dining area. Mep sprinklers under separate permit. Permit type: Building permit | Expiration date: February 26, 2015 | Current use: Office | Permit id: #201302140233 | |||||
Provide equivalent facilitation at front door(9400664) ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: May 5, 1994 | Expiration date: December 16, 1994 | Current use: Office | Permit id: 9407164 | |||||
Suite 102. Demolition of non-load bearing partitions doors & lights restrooms per ab-017 remains vacant. ![]() Permit type: Building permit | Current use: Office | Permit id: #201301158041 | |||||
Office ti on the 1st floor. Combine suite 1`01 and 101 b minor interior demo new partitions doors framesm relocationof lights minir elect. Work and case work. Mech fire alarm under separate permit. ![]() Permit type: Building permit | Current use: Office | Permit id: #201107059488 | |||||
SCORE 100 Tenant improvement inclues new walls doors glazing lighting casework finishes and remodel restrooms in kind. Mep to be design build under separate permits. Permit type: Building permit | Expiration date: July 3, 2014 | Current use: Office | Permit id: #201306058761 | |||||
SCORE 100 Installation of self supported bicycle storage rack in a private parking lot not visible to the public Permit type: Building permit | Expiration date: January 29, 2014 | Current use: Office | Permit id: #201307262860 | |||||
SCORE 100 Work category: 5p; install one new kitchen pantry on the west side of the building ![]() ![]() Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20130708711 | |||||
SCORE 100 Work category: 5p; install one new coffee sink on the 1st floor east side of building ![]() ![]() Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20130708713 | |||||
2nd floor: mep for work done under pa 2015 0729 2815 ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: September 16, 2015 | Expiration date: September 22, 2016 | Current use: Office | Permit id: 201509167113 | |||||
Additions alterations or repairs ![]() Permit status: Expired | Completion date: September 2, 1982 | Expiration date: June 8, 1983 | Permit id: 8207305 | |||||
SCORE 100 Non-structural painted sign Permit type: Building permit | Expiration date: November 17, 2012 | Permit id: #201206293800 | |||||
SCORE 100 Comply with fire department notice of violation provide second means of egress. Partial disabled upgrade at entry. Final previously completed work for appl. 9725449 which expired. Otain occupant load verification. Documentation of work related to 9725449 for partition and windows at dining rm #2. Permit type: Building permit | Expiration date: December 31, 2010 | Current use: Food/beverage hndlng | Permit id: #200912163366 | |||||
Interior refurbishment of bldg corridors 2nd floor restrooms & one tenant suite on the 2nd floor. Scope includes new-non-rated partitoins lighting restroom fixtures & interior finishes. No structural work deferred submittals for mechanical electrical including lighting fire/life safety). ![]() Permit type: Building permit | Current use: Office | Permit id: #201206293764 | |||||
SCORE 100 Interior sprinkler renovations Permit type: Building permit | Expiration date: October 17, 2013 | Current use: Office | Permit id: #201306179705 | |||||
Tenant improvement inclues new walls doors glazing lighting casework finishes and remodel restrooms in kind. Mep to be design build under separate permits. ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: June 5, 2013 | Expiration date: June 17, 2016 | Current use: Office | Permit id: 201306058761 | |||||
SCORE 86 Replace and install new hydronic radiators and piping ![]() ![]() Permit type: Plumbing permit | Permit status: Complete | Permit id: Pm20130626951 | |||||
Interior demolition of non-structural interior partition walls. Demo only per ab-017. T. I. Under separate permit. ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: April 13, 2012 | Expiration date: April 8, 2013 | Current use: Office | Permit id: 201204138236 | |||||
Intall satellite antenna on free-stand supp pole in pkg lot ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: November 1, 1995 | Expiration date: June 14, 1996 | Current use: Office | Permit id: 9518458 | |||||
Street space permit only. Permit type: Otc alterations permit | Permit status: Issued | Completion date: October 23, 2007 | Permit id: M92187 | |||||
Tenant improvement. ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: August 22, 1991 | Expiration date: September 20, 1992 | Current use: Office | Permit id: 9115259 | |||||
SCORE 100 Interior sprinkler renovations including water curtain around verticle stair opening. 15 rel0cated sprinklers 66 new sprinklers; to include seismic bracing. T. I ref pa# 201302140233. Permit type: Building permit | Expiration date: March 4, 2014 | Current use: Office | Permit id: #201303041386 | |||||
SCORE 100 Installation of a new catering prep and storage area in a pre approved location to serve an approved office lunch room Permit type: Building permit | Expiration date: March 14, 2014 | Current use: Office | Permit id: #201303111932 | |||||
SCORE 100 Fire alarm system. Fire sprinkler monitoring system. Ref:201302140233 Permit type: Building permit | Expiration date: September 21, 2013 | Current use: Office | Permit id: #201303212736 | |||||
SCORE 100 Fire sprinkler ti 1st 2nd & 3rd floor ![]() ![]() Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20130304746 | |||||
SCORE 100 Install new ada compliant restrooms with ada compliant showers on the 1st flr. Install 1 kitchen pantry on the 1st flr. Install ada compliant restrooms on the 3rd flr. Install 2 ada compliant pantries on the 3rd flr. Install one mop sink on the 3rd flr. Install 3 ada compliant hi-low drinking fountains. ![]() ![]() Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20130307165 | |||||
Sidewalk repair Permit type: Otc alterations permit | Permit status: Expired | Completion date: August 11, 2000 | Permit id: M14052 | |||||
Cti 1 ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: March 7, 1991 | Expiration date: July 22, 1991 | Current use: Office | Permit id: 9103754 | |||||
Phase i work only roof bracing per plans ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: March 1, 1990 | Expiration date: June 21, 1991 | Current use: Office | Permit id: 9003947 | |||||
SCORE 89 Electrical permit for the installation of (85) new modular workstations ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20130506621 | |||||
Suite 102. Demolition of non-load bearing partitions doors & lights restrooms per ab-017 remains vacant. ![]() Permit type: Otc alterations permit | Permit status: Withdrawn | Completion date: January 15, 2013 | Current use: Office | Permit id: 201301158041 | |||||
No change to building envelope. No change to square footage. 28 sf minior interior tenant improvement including: partial demo of breakroom cabinetry installation of accent lighting. Elec & t-24 under separate permit. ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: January 9, 2015 | Expiration date: January 11, 2016 | Current use: Office | Permit id: 201501095386 | |||||
Cti i ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: February 5, 1991 | Expiration date: February 21, 1992 | Current use: Office | Permit id: 9101847 | |||||
Cti ii ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: February 5, 1991 | Expiration date: August 21, 1991 | Current use: Office | Permit id: 9101846 | |||||
SCORE 86 Work category: 5m; replacement of exisitng fan coil unit. Instalaltion of new duct distribution and thermostat ![]() ![]() Permit type: Plumbing permit | Permit status: Issued | Permit id: Pmw20131030641 | |||||
SCORE 100 Demo only of interior non-structural partitions door frames suspended ceiling and millwork. As per ab-017 Permit type: Building permit | Expiration date: October 9, 2013 | Current use: Office | Permit id: #201210091598 | |||||
To renew app#2006 09 28 3666 2004 05 21 4484 & 2007 04 30 9994 for final inspection. ![]() ![]() Permit type: Otc alterations permit | Permit status: Complete | Expiration date: January 15, 2008 | Current use: Workshop commercial | Permit id: 200801152552 | |||||
SCORE 100 Work category: 4pb; 15-276 relocate 11 sprinkler heads on the 2nd floor for new offices ![]() ![]() Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20150902962 | |||||
Comply with fire department notice of violation provide second means of egress. Partial disabled upgrade at entry. Final previously completed work for appl. 9725449 which expired. Otain occupant load verification. Documentation of work related to 9725449 for partition and windows at dining rm #2. ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: December 16, 2009 | Expiration date: June 25, 2011 | Current use: Food/beverage hndlng | Permit id: 200912163366 | |||||
Street space Permit type: Otc alterations permit | Permit status: Issued | Completion date: May 7, 2012 | Permit id: M319227 | |||||
Renovate existing office space ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: January 14, 1994 | Expiration date: February 11, 1995 | Current use: Office | Permit id: 9400664 | |||||
Add (2) pendent fire sprinklers plug (1) upright install (4) branchline restraints. T. I ref # to pa# 201206293764. ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: August 28, 2012 | Expiration date: August 23, 2013 | Current use: Office | Permit id: 201208288389 | |||||
Street space Permit type: Otc alterations permit | Permit status: Issued | Completion date: September 30, 2002 | Expiration date: September 30, 2004 | Permit id: M21820 | |||||
Install approx. 28 feet of 6" underground pipe (pvc class 150) ![]() Permit type: Otc alterations permit | Permit status: Filed | Completion date: September 26, 2007 | Current use: Office | Permit id: 200709263764 | |||||
Sprinkler system ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: October 29, 1991 | Expiration date: April 9, 1992 | Current use: Office | Permit id: 9120464 | |||||
Alterations to sprinkler system (e) due to new partitions ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: February 8, 1991 | Expiration date: July 19, 1991 | Current use: Office | Permit id: 9101933 | |||||
2 drywall repairs due to flood. New vinyl flooring. Repair work only no structural work no wall modification. N/a ordinance #155-13 ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: December 30, 2014 | Expiration date: January 11, 2016 | Current use: Retail sales | Permit id: 201412304719 | |||||
Re-install new int stair bet 2nd/3rd flr upgrade 2nd toilet ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: January 14, 1998 | Expiration date: July 26, 1998 | Current use: Office | Permit id: 9800586 | |||||
Reconfigure ducting in office at 3rd floor/rvsn to app #200103295514 ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: August 14, 2001 | Expiration date: April 16, 2002 | Current use: Office | Permit id: 200108146012 | |||||
Revise to app #9922426 decreased scope of work for t i change storage front to typical glass ![]() Permit type: Otc alterations permit | Permit status: Expired | Completion date: June 16, 2000 | Expiration date: October 16, 2000 | Current use: Office | Permit id: 200006162904 | |||||
This permit application is to revise the occupancy classification on the site permit 200405214487/s/r4 for the work spaces from b to f-1. This will correct the record to reconcile the work spaces with the correct use class ![]() Permit type: Otc alterations permit | Permit status: Expired | Completion date: April 30, 2007 | Expiration date: August 31, 2007 | Current use: Workshop commercial | Permit id: 200704309994 | |||||
Tenant improvement demo partitions new elec system ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: November 26, 1986 | Expiration date: January 8, 1988 | Current use: Office | Permit id: 8615049 | |||||
To install fire sprinkler system ![]() Permit type: Additions alterations or repairs | Permit status: Withdrawn | Completion date: December 26, 2006 | Current use: Retail sales | Permit id: 200612260533 | |||||
Cti-1 ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: January 9, 1991 | Expiration date: February 5, 1992 | Current use: Office | Permit id: 9100365 | |||||
1st floor:replace subfloor damaged by flood water in designated area. Approx 9 sq ft in kind. No structural work. Maher not required ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: January 21, 2015 | Expiration date: January 16, 2016 | Current use: Office | Permit id: 201501216299 | |||||
T. I. Work on 3rd floor only (11 heads) ![]() Permit type: Otc alterations permit | Permit status: Expired | Completion date: September 19, 2001 | Expiration date: January 19, 2002 | Current use: Office | Permit id: 200109198679 | |||||
New wall partitions new carpet new storefront for barrier ![]() Permit type: Otc alterations permit | Permit status: Expired | Completion date: October 21, 1999 | Expiration date: October 21, 2000 | Current use: Office | Permit id: 9922426 | |||||
Remove some (e) partition walls construct new partition walls cabinets alter lighting & plumbing ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: March 29, 2001 | Expiration date: June 11, 2002 | Current use: Office | Permit id: 200103295514 | |||||
Design retail space and a portion of the space (25%) will be used as an espresso bar by adding sink & counter. ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: June 11, 2008 | Expiration date: October 25, 2008 | Current use: Retail sales | Permit id: 200806114147 | |||||
Interior sprinkler renovations ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: June 17, 2013 | Expiration date: June 12, 2014 | Current use: Office | Permit id: 201306179705 | |||||
Street space permit Permit type: Otc alterations permit | Permit status: Issued | Completion date: December 21, 2006 | Permit id: M51782 | |||||
Interior alteration at east wing of approx 29 sq. Ft. ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: April 19, 1991 | Expiration date: May 7, 1992 | Current use: Office | Permit id: 9106498 | |||||
Build out of new space - kitchen interior finishes for cafe change of use b1 to a-3. Add 2 hr glazing. Extg permit appl for new bldg 200405214487. ![]() Permit type: Additions alterations or repairs | Permit status: Cancelled | Completion date: May 4, 2007 | Current use: Food/beverage hndlng | Permit id: 200705040455 | |||||
Modify existing sprinkler system. ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: May 16, 1991 | Expiration date: October 21, 1991 | Current use: Office | Permit id: 9108528 | |||||
Street space permit Permit type: Otc alterations permit | Permit status: Issued | Completion date: August 5, 2013 | Permit id: M414147 | |||||
To obtain final inspection for work approved under pa # 9725449. All work is complete. ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: December 17, 2009 | Expiration date: December 16, 2010 | Current use: Food/beverage hndlng | Permit id: 200912173438 | |||||
Additions alterations or repairs ![]() Permit status: Filing | Completion date: February 17, 1981 | Permit id: 8101493 | |||||
Revision to 9416530 ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: February 24, 1995 | Expiration date: March 6, 1996 | Current use: Office | Permit id: 9502699 | |||||
Cti-1 ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: October 22, 1993 | Expiration date: July 24, 1994 | Current use: Office | Permit id: 9318627 | |||||
Interior refurbishment of bldg corridors 2nd floor restrooms & one tenant suite on the 2nd floor. Scope includes new-non-rated partitoins lighting restroom fixtures & interior finishes. No structural work deferred submittals for mechanical electrical including lighting fire/life safety). ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: June 29, 2012 | Expiration date: July 2, 2015 | Current use: Office | Permit id: 201206293764 | |||||
Office ti on the 1st floor. Combine suite 106 and 101 b minor interior demo new partitions doors frames relocationof lights minir elect. Work and case work. Mech fire alarm under separate permit. ![]() Permit type: Otc alterations permit | Permit status: Filed | Completion date: July 5, 2011 | Current use: Office | Permit id: 201107059488 | |||||
Work at ground floor to include new gyp. Bd. Partitions. ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: May 23, 1991 | Expiration date: October 14, 1991 | Current use: Office | Permit id: 9109078 | |||||
Cti-2 ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: January 9, 1991 | Expiration date: February 12, 1992 | Current use: Office | Permit id: 9100366 | |||||
T/i at ground floor east wing to include gypsum board partit ![]() Permit type: Additions alterations or repairs | Permit status: Cancelled | Completion date: March 6, 1991 | Current use: Office | Permit id: 9103387 | |||||
Demo of existing suites 205 and 207 to connect with suite 200. New partitions glazing doors ceiling lighting elec and finishes. Maher not req ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: July 29, 2015 | Expiration date: July 31, 2017 | Current use: Office | Permit id: 201507292815 | |||||
Street space Permit type: Otc alterations permit | Permit status: Issued | Completion date: August 30, 2007 | Permit id: M84285 | |||||
Cti two ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: July 23, 1990 | Expiration date: August 20, 1991 | Current use: Office | Permit id: 9014499 | |||||
Install fire alarm to monitor waterflow renew app#200005099468 ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: December 27, 2000 | Expiration date: April 27, 2001 | Current use: Manufacturing | Permit id: 200012278690 | |||||
Rev. To p#9916229-change the location of steel framee in the middle ![]() Permit type: Otc alterations permit | Permit status: Expired | Completion date: August 1, 2000 | Expiration date: December 1, 2000 | Current use: Office | Permit id: 200008016681 | |||||
Additions alterations or repairs ![]() Permit status: Complete | Completion date: March 23, 1982 | Expiration date: September 12, 1982 | Permit id: 8202180 | |||||
Tenant improvement add 2 sprinkler hds & relocate 2 hds(2nd flr) ![]() Permit type: Otc alterations permit | Permit status: Expired | Completion date: November 22, 2000 | Expiration date: March 22, 2001 | Current use: Office | Permit id: 200011226487 | |||||
Fire sprinkler alarm monitoring system and elevator recall. Comploaint #200669688. ![]() Permit type: Otc alterations permit | Permit status: Expired | Completion date: August 2, 2007 | Expiration date: February 2, 2008 | Current use: Office | Permit id: 200708028547 | |||||
Demo only of interior non-structural partitions door frames suspended ceiling and millwork. As per ab-017 ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: October 9, 2012 | Expiration date: October 4, 2013 | Current use: Office | Permit id: 201210091598 | |||||
Install ton chiller on roof ![]() Permit type: Additions alterations or repairs | Permit status: Cancelled | Completion date: October 18, 1994 | Current use: Office | Permit id: 9416772 | |||||
Sidewalk Permit type: Otc alterations permit | Permit status: Issued | Completion date: May 17, 2006 | Permit id: M37632 | |||||
Street space only. Permit type: Otc alterations permit | Permit status: Issued | Completion date: May 29, 2009 | Permit id: M165946 | |||||
Modify existing sprinkler system ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: September 4, 1991 | Expiration date: April 11, 1992 | Current use: Office | Permit id: 9116270 | |||||
Install catch basin and sewer pipe in parking lot ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: December 27, 1985 | Expiration date: May 14, 1986 | Current use: Warehouse | Permit id: 8514580 | |||||
Add. Of warehouse #1 & new warehouse #2 & new parking lot ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: June 5, 1984 | Expiration date: October 1, 1985 | Current use: Warehouse | Permit id: 8405989 | |||||
Addition of new-offices to warehouse. ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: July 26, 1988 | Expiration date: October 26, 1989 | Current use: Warehouse | Permit id: 8810391 | |||||
Street space Permit type: Otc alterations permit | Permit status: Expired | Completion date: March 28, 2000 | Expiration date: March 28, 2001 | Permit id: M12047 | |||||
Cti i ground floor (no cti-2) ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: February 14, 1994 | Expiration date: August 17, 1994 | Current use: Office | Permit id: 9402388 | |||||
Tenant improvement work at east wing consist new ceilings ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: April 14, 1989 | Expiration date: April 28, 1990 | Current use: Office | Permit id: 8906136 | |||||
Install lighting & elect. Outlets at (e) space ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: April 19, 1991 | Expiration date: September 7, 1991 | Current use: Office | Permit id: 9106399 | |||||
Fire sprinkler 2nd floor ti unit 207- add 12 pendents for new ceilings- 2015 0729 2815 maher na ![]() Permit type: Otc alterations permit | Permit status: Issued | Completion date: September 2, 2015 | Expiration date: March 2, 2016 | Current use: Office | Permit id: 201509025865 | |||||
Erect sign ![]() Permit type: Sign-errect | Permit status: Complete | Completion date: July 1, 1985 | Expiration date: November 12, 1985 | Current use: Retail sales | Permit id: 8506887 | |||||
Installation of a new catering prep and storage area in a pre approved location to serve an approved office lunch room ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: March 11, 2013 | Expiration date: March 9, 2014 | Current use: Office | Permit id: 201303111932 | |||||
Espand existing dining patio area provide accessibility ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: December 19, 1997 | Expiration date: July 27, 1999 | Current use: Food/beverage hndlng | Permit id: 9725449 | |||||
Street space permit Permit type: Otc alterations permit | Permit status: Issued | Completion date: April 5, 2007 | Permit id: M62964 | |||||
Fire alarm work relocation (6) of fire alarm notification. T. I. Pa#201502292815. N/a ordinance #155-13 ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: September 16, 2015 | Expiration date: January 16, 2016 | Current use: Office | Permit id: 201509167086 | |||||
Instl 1 ton heat pump split sys to serve i. T. Rm on 1/fl(slab on grade) hilti anchors to be used. ![]() Permit type: Otc alterations permit | Permit status: Issued | Completion date: July 26, 2005 | Expiration date: January 26, 2006 | Current use: Office | Permit id: 200507268626 | |||||
Revised to approved appl#9106498. ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: May 23, 1991 | Expiration date: October 6, 1991 | Current use: Office | Permit id: 9109079 | |||||
Street space Permit type: Otc alterations permit | Permit status: Issued | Completion date: February 26, 2013 | Permit id: M373927 | |||||
Phase #2 work per plan phase #1 ref. Pa#9003947 ![]() Permit type: Additions alterations or repairs | Permit status: Withdrawn | Completion date: November 23, 1994 | Current use: Office | Permit id: 9419392 | |||||
Install new cooling/vent unit ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: November 18, 1999 | Expiration date: March 18, 2000 | Current use: Office | Permit id: 9924568 | |||||
Install fire alarm to monitor water flow ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: May 9, 2000 | Expiration date: September 9, 2000 | Current use: Office | Permit id: 200005099468 | |||||
Installation of self supported bicycle storage rack in a private parking lot not visible to the public ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: July 26, 2013 | Expiration date: July 24, 2014 | Current use: Office | Permit id: 201307262860 | |||||
Ext. Appl#9922426 & 200006162904 for final inspection ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: May 8, 2001 | Expiration date: September 8, 2001 | Current use: Office | Permit id: 200105088685 | |||||
Sign-errect Permit status: Reinstated | Completion date: November 12, 1981 | Current use: Retail sales | Permit id: 8109700 | |||||
One new non-bearing partition cabinets sink for new lab rm ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: October 8, 1999 | Expiration date: May 16, 2000 | Current use: Office | Permit id: 9921347 | |||||
1st floor suite 102 - fire alarm work - additional horn/strobe & strobe light for a t. I. Ref #2013. 06. 05. 8761 ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: August 7, 2013 | Expiration date: August 2, 2014 | Current use: Office | Permit id: 201308073699 | |||||
T. I. On 3 floors including (n) restrooms offices break room stairs partitions casework closets dining area. Mep sprinklers under separate permit. ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: February 14, 2013 | Expiration date: February 11, 2016 | Current use: Office | Permit id: 201302140233 | |||||
Duct modifications & new zoning in office area & mezzanine are ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: April 10, 2001 | Expiration date: October 10, 2001 | Current use: Office | Permit id: 200104106484 | |||||
Interior sprinkler renovations including water curtain around verticle stair opening. 15 rel0cated sprinklers 66 new sprinklers; to include seismic bracing. T. I ref pa# 201302140233. ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: March 4, 2013 | Expiration date: February 27, 2014 | Current use: Office | Permit id: 201303041386 | |||||
Special procedures (seismic upgrade) roof anchors ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: August 6, 1999 | Expiration date: December 13, 2000 | Current use: Office | Permit id: 9916229 | |||||
Non-structural painted sign ![]() Permit type: Wall or painted sign | Permit status: Complete | Completion date: June 29, 2012 | Expiration date: July 12, 2013 | Permit id: 201206293800 | |||||
Tie-into existing system & add new sprinkler ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: June 25, 1985 | Expiration date: July 13, 1986 | Current use: Manufacturing | Permit id: 8506636 | |||||
Additions alterations or repairs ![]() Permit status: Cancelled | Completion date: March 23, 1982 | Permit id: 8202179 | |||||
Cti 1 new conference rm--no cti 2 required 2nd flr ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: July 21, 1993 | Expiration date: December 17, 1993 | Current use: Office | Permit id: 9312280 | |||||
2 drywall repairs due to flood. New vinyl flooring. Repair work only no structural work no wall modification. N a ordinance #155-13 ![]() ![]() Permit type: Otc alterations permit | Permit status: Complete | Expiration date: December 30, 2014 | Current use: Retail sales | Permit id: 201412304719 | |||||
Re-install new int stair bet 2nd 3rd flr upgrade 2nd toilet ![]() ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Expiration date: January 14, 1998 | Current use: Office | Permit id: 9800586 | |||||
This permit application is to revise the occupancy classification on the site permit 200405214487 s r4 for the work spaces from b to f-1. This will correct the record to reconcile the work spaces with the correct use class ![]() ![]() Permit type: Otc alterations permit | Permit status: Expired | Expiration date: April 30, 2007 | Current use: Workshop commercial | Permit id: 200704309994 | |||||
Interior refurbishment of bldg corridors 2nd floor restrooms & one tenant suite on the 2nd floor. Scope includes new-non-rated partitoins lighting restroom fixtures & interior finishes. No structural work deferred submittals for mechanical electrical including lighting fire life safety). ![]() Permit type: Building permit | Current use: Office | Permit id: #201206293764 | |||||
Reconfigure ducting in office at 3rd floor rvsn to app #200103295514 ![]() ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Expiration date: August 14, 2001 | Current use: Office | Permit id: 200108146012 | |||||
Revision (as-built) of project -sprinkler system. Sprinkler main size reduced to 2 1 2" calculation revised. Plans revised are sheets fs-6 and fs-7 only. This is revision to permit #2004 05 21 4487 s4 ![]() ![]() Permit type: Otc alterations permit | Permit status: Filed | Expiration date: August 13, 2007 | Current use: Food/beverage hndlng | Permit id: 200708139536 | |||||
Interior refurbishment of bldg corridors 2nd floor restrooms & one tenant suite on the 2nd floor. Scope includes new-non-rated partitoins lighting restroom fixtures & interior finishes. No structural work deferred submittals for mechanical electrical including lighting fire life safety). ![]() ![]() Permit type: Otc alterations permit | Permit status: Complete | Expiration date: June 29, 2012 | Current use: Office | Permit id: 201206293764 | |||||
T i at ground floor east wing to include gypsum board partit ![]() ![]() Permit type: Additions alterations or repairs | Permit status: Cancelled | Expiration date: March 6, 1991 | Current use: Office | Permit id: 9103387 | |||||
Fire alarm work relocation (6) of fire alarm notification. T. I. Pa#201502292815. N a ordinance #155-13 ![]() ![]() Permit type: Otc alterations permit | Permit status: Complete | Expiration date: September 16, 2015 | Current use: Office | Permit id: 201509167086 | |||||
Instl 1 ton heat pump split sys to serve i. T. Rm on 1 fl(slab on grade) hilti anchors to be used. ![]() ![]() Permit type: Otc alterations permit | Permit status: Issued | Expiration date: July 26, 2005 | Current use: Office | Permit id: 200507268626 | |||||
Install new cooling vent unit ![]() ![]() Permit type: Otc alterations permit | Permit status: Complete | Expiration date: November 18, 1999 | Current use: Office | Permit id: 9924568 | |||||
1st floor suite 102 - fire alarm work - additional horn strobe & strobe light for a t. I. Ref #2013. 06. 05. 8761 ![]() ![]() Permit type: Otc alterations permit | Permit status: Complete | Expiration date: August 7, 2013 | Current use: Office | Permit id: 201308073699 | |||||
New lighting & offices on 2nd floor Permit status: Complete | Permit id: Ew20130319001 | |||||
General kitchen work including new receptacles & light fixturs. Permit status: Complete | Permit id: Ew20130618301 | |||||
Replace existing fixtures in corridors and stairwells on floors 1-3. Supply & install fixtures and receptacles for spec suite on 2nd floor. Permit status: Complete | Permit id: Ew20120918481 | |||||
Fire alarm monitoring system Permit status: Cancelled | Permit id: E20070802283 | |||||
Bei job number c15-274 furnish and install (9) furniture pods with (2) cat5e white plenum data cables complete with orange rj45 jacks white faceplates testing and labeling. Permit status: Complete | Permit id: Ew20151116429 | |||||
Garage & 5 floors 4 lights 4 switches 4 receptacles & 2 circuits 12-panels feeders -12 Permit status: Complete | Permit id: E200706208977 | |||||
2nd flr: for final inspection only (left by previous contractor) Permit status: Cancelled | Permit id: E200908121653 | |||||
Voice and data communications cabling Permit status: Expired | Permit id: Ew20121203641 | |||||
The installation of modular workstations Permit status: Complete | Permit id: Ew20151117841 | |||||
#114 re-pull # wire through existing conduit to provide 2 circuits for expresso machine only. Amp feeder 220v. 1 recepacle. 1 220v 30amp circuit for under counter outlet for expresso machine. Permit status: Complete | Permit id: E200901205792 | |||||
Fire alarm monitoring system. Permit status: Complete | Permit id: E200801174614 | |||||
4 new workstation clusters Permit status: Complete | Permit id: Ew20150123221 | |||||
New lighting & general office space on third floor Permit status: Complete | Permit id: Ew20130319021 | |||||
Electrical portion of fire life safety installation Permit status: Complete | Permit id: Ew20130618324 | |||||
Install 5 exit light and power supply to one door opener. Permit status: Expired | Permit id: Ew20100826081 | |||||
3rd floor: data communications and wireless systems: number of cables (42) Permit status: Complete | Permit id: E201303209361 | |||||
1st floor garage door opening. Permit status: Complete | Permit id: E200909162430 | |||||
Temporally power installation for construction trailer Permit status: Complete | Permit id: Ew20060622939 | |||||
Garage and 5 floors 4 lights 4 switches 8 receptacles & 4 circuits 12-panels feeder -12 Permit status: Complete | Permit id: E200706208974 | |||||
Conduit & electrical sensors for garage exhaust fan reference to permit # e200706208977 Permit status: Complete | Permit id: E200801174630 | |||||
Tenant improvement: 1 f suite - 15 lights 4 switches 15 receptacle. Permit status: Complete | Permit id: E201307122070 | |||||
Witness test Permit status: Complete | Permit id: E200801114457 | |||||
2nd floor: data communications and wireless systems: number of cables (42) Permit status: Complete | Permit id: E201303209360 | |||||
3rd floor electrical portion of firelife safety inspection Permit status: Complete | Permit id: Ew20130618325 | |||||
1st floor: data communications and wireless systems: number of cables (42) Permit status: Complete | Permit id: E201303209355 | |||||
Install sub panel as per one line drawing submitted to cheryl rose ok 01 27 09. 1-225 amp. 3 phase wire. 66 bkrs circuits. 2panelboards 1-42 circuit 1-24 circuit 3 phase wire. Permit status: Cancelled | Permit id: E200902236998 | |||||
2 amp temp service for demo Permit status: Expired | Permit id: E200602155153 | |||||
The installation of 32 modular workstations Permit status: Complete | Permit id: Ew20150305981 | |||||
Electrical permit for the installation of (85) new modular workstations Permit status: Complete | Permit id: Ew20130506621 | |||||
Firelife electrical inspection for 1st floor - per chief inspector ron allen Permit status: Complete | Permit id: Ew20130618322 | |||||
Tenant improvement of partial floors 1 2 & all of floor 3 Permit status: Complete | Permit id: Ew20130314521 | |||||
New construction 3 pahse 120 208 v 20 a new main service installtion of panel boards lighting fixtures and outlets etc [scope of work does not include residential electric space heater installation.] Permit status: Complete | Permit id: Ew20060926041 | |||||
Elec and life safety t. I. Build out - job #34322 Permit status: Filed | Permit id: Ew20150813721 | |||||
Install 11 outlets 1 track light and 2 or 3 switches in the unit. Permit status: Complete | Permit id: Ew20110615561 | |||||
Voice and data cabling for suite 202 Permit status: Complete | Permit id: Ew20150203641 | |||||
Workcategory:4pb;15-276relocate11sprinklerheadsonthe2ndfloorfornewoffices ![]() Permit status: Complete | Expiration date: September 2, 2015 | Permit id: Pw20150902962 | |||||
Firesprinklert. I. ![]() Permit status: Expired | Expiration date: June 17, 2013 | Permit id: Pp20130617689 | |||||
Workcategory:5p;installonenewcoffeesinkonthe1stfloor eastsideofbuilding ![]() Permit status: Complete | Expiration date: July 8, 2013 | Permit id: Pw20130708713 | |||||
2ndfloor:newsink newbathroomfixtures. ![]() Permit status: Expired | Expiration date: August 29, 2012 | Permit id: Pp20120829175 | |||||
Installnewadacompliantrestroomswithadacompliantshowersonthe1stflr. Install1kitchenpantryonthe1stflr. Installadacompliantrestroomsonthe3rdflr. Install2adacompliantpantriesonthe3rdflr. Installonemopsinkonthe3rdflr. Install3adacomplianthi-lowdrinkingfountains. ![]() Permit status: Complete | Expiration date: March 7, 2013 | Permit id: Pw20130307165 | |||||
Add2pendentsprinklers plug1uprightsprinkler install4branchlinerestraints. ![]() Permit status: Complete | Expiration date: August 28, 2012 | Permit id: Pp20120828150 | |||||
Firesprinklerti1st 2nd&3rdfloor ![]() Permit status: Complete | Expiration date: March 4, 2013 | Permit id: Pp20130304746 | |||||
Plumbingforsinkw. H. Andcoffeemachine ![]() Permit status: Complete | Expiration date: December 5, 2008 | Permit id: Pp20081205230 | |||||
Workcategory:5p;newbreakroom. Kmc#15130 ![]() Permit status: Complete | Expiration date: August 4, 2015 | Permit id: Pw20150804237 | |||||
Workcategory:5p;installonenewkitchenpantryonthewestsideofthebuilding ![]() Permit status: Complete | Expiration date: July 8, 2013 | Permit id: Pw20130708711 | |||||
Worktype:notlisted;sewerandstormtrap ![]() Expiration date: January 17, 2008 | Permit id: Pw20080117197 | |||||
Installationofnewa cunitsandductwork installofvavs&ductfortennantimprovementsreplacementofa cunitsonroof. ![]() Permit status: Expired | Expiration date: April 8, 2013 | Permit id: Pm20130408728 | |||||
Workcategory:5m;replacementofexisitngfancoilunit. ![]() Permit status: A | Expiration date: October 30, 2013 | Permit id: Pmw20131030641 | |||||
Replaceandinstall20newhydronicradiatorsandpiping ![]() Permit status: Complete | Expiration date: June 26, 2013 | Permit id: Pm20130626951 | |||||
Firelife electrical inspection for 1st floor - per chief inspector ron allen Permit status: Complete | Permit id: Ew20130618322 | |||||
Electrical permit for the installation of (85) new modular workstations Permit status: Complete | Permit id: Ew20130506621 | |||||
The installation of 32 modular workstations Permit status: Complete | Permit id: Ew20150305981 | |||||
2 amp temp service for demo Permit status: Expired | Permit id: E200602155153 | |||||
3rd floor electrical portion of firelife safety inspection Permit status: Complete | Permit id: Ew20130618325 | |||||
Witness test Permit status: Complete | Permit id: E200801114457 | |||||
Tenant improvement: 1 f suite - 15 lights 4 switches 15 receptacle. Permit status: Complete | Permit id: E201307122070 | |||||
1st floor: data communications and wireless systems: number of cables (42) Permit status: Complete | Permit id: E201303209355 | |||||
Conduit & electrical sensors for garage exhaust fan reference to permit # e200706208977 Permit status: Complete | Permit id: E200801174630 | |||||
Garage and 5 floors 4 lights 4 switches 8 receptacles & 4 circuits 12-panels feeder -12 Permit status: Complete | Permit id: E200706208974 | |||||
Temporally power installation for construction trailer Permit status: Complete | Permit id: Ew20060622939 | |||||
3rd floor: data communications and wireless systems: number of cables (42) Permit status: Complete | Permit id: E201303209361 | |||||
New lighting & general office space on third floor Permit status: Complete | Permit id: Ew20130319021 | |||||
1st floor garage door opening. Permit status: Complete | Permit id: E200909162430 | |||||
4 new workstation clusters Permit status: Complete | Permit id: Ew20150123221 | |||||
#114 re-pull # wire through existing conduit to provide 2 circuits for expresso machine only. Amp feeder 220v. 1 recepacle. 1 220v 30amp circuit for under counter outlet for expresso machine. Permit status: Complete | Permit id: E200901205792 | |||||
Electrical portion of fire life safety installation Permit status: Complete | Permit id: Ew20130618324 | |||||
Voice and data communications cabling Permit status: Expired | Permit id: Ew20121203641 | |||||
2nd floor: data communications and wireless systems: number of cables (42) Permit status: Complete | Permit id: E201303209360 | |||||
Garage & 5 floors 4 lights 4 switches 4 receptacles & 2 circuits 12-panels feeders -12 Permit status: Complete | Permit id: E200706208977 | |||||
Bei job number c15-274 furnish and install (9) furniture pods with (2) cat5e white plenum data cables complete with orange rj45 jacks white faceplates testing and labeling. Permit status: Complete | Permit id: Ew20151116429 | |||||
Install 5 exit light and power supply to one door opener. Permit status: Expired | Permit id: Ew20100826081 | |||||
Replace existing fixtures in corridors and stairwells on floors 1-3. Supply & install fixtures and receptacles for spec suite on 2nd floor. Permit status: Complete | Permit id: Ew20120918481 | |||||
General kitchen work including new receptacles & light fixturs. Permit status: Complete | Permit id: Ew20130618301 | |||||
New lighting & offices on 2nd floor Permit status: Complete | Permit id: Ew20130319001 | |||||
Fire alarm monitoring system Permit status: Cancelled | Permit id: E20070802283 | |||||
2nd flr: for final inspection only (left by previous contractor) Permit status: Cancelled | Permit id: E200908121653 | |||||
Install sub panel as per one line drawing submitted to cheryl rose ok 01 27 09. 1-225 amp. 3 phase wire. 66 bkrs circuits. 2panelboards 1-42 circuit 1-24 circuit 3 phase wire. Permit status: Cancelled | Permit id: E200902236998 | |||||
Fire alarm monitoring system. Permit status: Complete | Permit id: E200801174614 | |||||
The installation of modular workstations Permit status: Complete | Permit id: Ew20151117841 | |||||
New construction 3 pahse 120 208 v 20 a new main service installtion of panel boards lighting fixtures and outlets etc [scope of work does not include residential electric space heater installation.] Permit status: Complete | Permit id: Ew20060926041 | |||||
Tenant improvement of partial floors 1 2 & all of floor 3 Permit status: Complete | Permit id: Ew20130314521 | |||||
Voice and data cabling for suite 202 Permit status: Complete | Permit id: Ew20150203641 | |||||
Install 11 outlets 1 track light and 2 or 3 switches in the unit. Permit status: Complete | Permit id: Ew20110615561 | |||||
Elec and life safety t. I. Build out - job #34322 Permit status: Filed | Permit id: Ew20150813721 | |||||
Instl 1 ton heat pump split sys to serve i. T. Rm on 1 fl(slab on grade),hilti anchors to be used. ![]() ![]() Permit type: Otc alterations permit | Expiration date: July 26, 2005 | Current use: Office | Permit id: 200507268626 | |||||
Change of use from office to personal use tattoo-permanent cosmetics, no work ![]() ![]() Permit type: Otc alterations permit | Completion date: June 27, 2017 | Expiration date: May 2, 2017 | Current use: Office | Permit id: 201705025461 | |||||
Additions alterations or repairs ![]() ![]() Expiration date: September 2, 1982 | Permit id: 8207305 | |||||
Tie-into existing system & add new sprinkler ![]() ![]() Permit type: Additions alterations or repairs | Expiration date: June 25, 1985 | Current use: Manufacturing | Permit id: 8506636 | |||||
Install catch basin and sewer pipe in parking lot ![]() ![]() Permit type: Additions alterations or repairs | Expiration date: December 27, 1985 | Current use: Warehouse,no frnitur | Permit id: 8514580 | |||||
Tenant improvement, demo partitions, new elec system ![]() ![]() Permit type: Additions alterations or repairs | Completion date: June 4, 1987 | Expiration date: November 26, 1986 | Current use: Office | Permit id: 8615049 | |||||
Phase i work only, roof bracing per plans ![]() ![]() Permit type: Additions alterations or repairs | Completion date: October 11, 2000 | Expiration date: March 1, 1990 | Current use: Office | Permit id: 9003947 | |||||
Cti-1 ![]() ![]() Permit type: Additions alterations or repairs | Completion date: May 12, 1994 | Expiration date: October 22, 1993 | Current use: Office | Permit id: 9318627 | |||||
Espand existing dining patio area provide accessibility ![]() ![]() Permit type: Additions alterations or repairs | Expiration date: December 19, 1997 | Current use: Food/beverage hndlng | Permit id: 9725449 | |||||
Re-install new int stair bet 2nd 3rd flr,upgrade 2nd toilet ![]() ![]() Permit type: Additions alterations or repairs | Completion date: May 14, 1998 | Expiration date: January 14, 1998 | Current use: Office | Permit id: 9800586 | |||||
One new non-bearing partition, cabinets, sink for new lab rm ![]() ![]() Permit type: Additions alterations or repairs | Completion date: January 4, 2000 | Expiration date: October 8, 1999 | Current use: Office | Permit id: 9921347 | |||||
New wall partitions,new carpet,new storefront for barrier ![]() ![]() Permit type: Otc alterations permit | Expiration date: October 21, 1999 | Current use: Office | Permit id: 9922426 | |||||
Tenant improvement,add 2 sprinkler hds & relocate 2 hds(2nd flr) ![]() ![]() Permit type: Otc alterations permit | Expiration date: November 22, 2000 | Current use: Office | Permit id: 200011226487 | |||||
Install fire alarm to monitor waterflow, renew app#200005099468 ![]() ![]() Permit type: Otc alterations permit | Completion date: March 2, 2001 | Expiration date: December 27, 2000 | Current use: Manufacturing | Permit id: 200012278690 | |||||
Remove some (e) partition walls, construct new partition walls, cabinets, alter lighting & plumbing ![]() ![]() Permit type: Additions alterations or repairs | Completion date: November 28, 2001 | Expiration date: March 29, 2001 | Current use: Office | Permit id: 200103295514 | |||||
Build out of new space - kitchen, interior finishes for cafe change of use b1 to a-3. Add 2 hr glazing. Extg permit appl for new bldg 200405214487. ![]() ![]() Permit type: Additions alterations or repairs | Expiration date: May 4, 2007 | Current use: Food/beverage hndlng | Permit id: 200705040455 | |||||
Revision (as-built) of project -sprinkler system. Sprinkler main size reduced to 2 1 2" calculation revised. Plans revised are sheets fs-6 and fs-7 only. This is revision to permit #2004 05 21 4487 s4 ![]() ![]() Permit type: Otc alterations permit | Expiration date: August 13, 2007 | Current use: Food/beverage hndlng | Permit id: 200708139536 | |||||
To renew app#2006 09 28 3666, 2004 05 21 4484 & 2007 04 30 9994 for final inspection. ![]() ![]() Permit type: Otc alterations permit | Completion date: January 31, 2008 | Expiration date: January 15, 2008 | Current use: Workshop commercial | Permit id: 200801152552 | |||||
To demolish a 1 story warehouse ![]() Permit type: Demolitions | Expiration date: May 21, 2004 | Current use: Retail sales | Permit id: 200405214484 | |||||
To erect a new 5 story mixed use building (workspaces,retail, 1 residental,parking) ![]() ![]() Permit type: New construction | Completion date: January 31, 2008 | Expiration date: May 21, 2004 | Permit id: 200405214487 | |||||
Change of use from office to personal use, permanent cosmetics no work ![]() ![]() Permit type: Otc alterations permit | Expiration date: October 20, 2017 | Current use: Office | Permit id: 201710201848 | |||||
Fire sprinkler 2nd floor ti for suite #207 (renewal of expired pa #201507292815 - add 12 pendents for new ceilings) ref #201509025865. Maher na ![]() ![]() Permit type: Otc alterations permit | Expiration date: January 4, 2018 | Current use: Office | Permit id: 201801047841 | |||||
To obtain final inpsection for work approved under pa #200708028547, all work has been completed. ![]() ![]() Permit type: Otc alterations permit | Completion date: June 12, 2009 | Expiration date: April 27, 2009 | Current use: Office | Permit id: 200904277147 | |||||
Comply with fire department notice of violation provide second means of egress. Partial disabled upgrade at entry. Final previously completed work for appl. 9725449 which expired. Otain occupant load verification. Documentation of work related to 9725449 for partition and windows at dining rm #2. ![]() ![]() Permit type: Additions alterations or repairs | Completion date: October 19, 2010 | Expiration date: December 16, 2009 | Current use: Food/beverage hndlng | Permit id: 200912163366 | |||||
Office ti on the 1st floor. Combine suite 106 and 101 b, minor interior demo , new partitions, doors, frames relocationof lights, minir elect. Work and case work. Mech, fire alarm under separate permit. ![]() ![]() Permit type: Otc alterations permit | Expiration date: July 5, 2011 | Current use: Office | Permit id: 201107059488 | |||||
Interior refurbishment of bldg corridors, 2nd floor restrooms, & one tenant suite on the 2nd floor. Scope includes new-non-rated partitoins, lighting, restroom fixtures, & interior finishes. No structural work, deferred submittals for mechanical, electrical including lighting, fire life safety). ![]() ![]() Permit type: Otc alterations permit | Completion date: August 12, 2013 | Expiration date: June 29, 2012 | Current use: Office | Permit id: 201206293764 | |||||
Add (2) pendent fire sprinklers, plug (1) upright, install (4) branchline restraints. T. I ref # to pa# 201206293764. ![]() ![]() Permit type: Otc alterations permit | Completion date: December 3, 2013 | Expiration date: August 28, 2012 | Current use: Office | Permit id: 201208288389 | |||||
Demo only of interior non-structural partitions, door, frames, suspended ceiling and millwork. As per ab-017 ![]() ![]() Permit type: Otc alterations permit | Completion date: March 18, 2013 | Expiration date: October 9, 2012 | Current use: Office | Permit id: 201210091598 | |||||
Suite 102. Demolition of non-load bearing partitions, doors & lights, restrooms per ab-017 remains vacant. ![]() ![]() Permit type: Otc alterations permit | Expiration date: January 15, 2013 | Current use: Office | Permit id: 201301158041 | |||||
T. I. On 3 floors including (n) restrooms, offices, break room, stairs, partitions, casework, closets, dining area. Mep, sprinklers under separate permit. ![]() ![]() Permit type: Otc alterations permit | Completion date: August 12, 2013 | Expiration date: February 14, 2013 | Current use: Office | Permit id: 201302140233 | |||||
Interior sprinkler renovations including water curtain around verticle stair opening. 15 rel0cated sprinklers, 66 new sprinklers; to include seismic bracing. T. I ref pa# 201302140233. ![]() ![]() Permit type: Otc alterations permit | Completion date: July 22, 2013 | Expiration date: March 4, 2013 | Current use: Office | Permit id: 201303041386 | |||||
Tenant improvement inclues new walls, doors, glazing lighting, casework, finishes, and remodel restrooms in kind. Mep to be design build under separate permits. ![]() ![]() Permit type: Otc alterations permit | Completion date: December 3, 2013 | Expiration date: June 5, 2013 | Current use: Office | Permit id: 201306058761 | |||||
Installation of self supported bicycle storage rack in a private parking lot, not visible to the public ![]() ![]() Permit type: Otc alterations permit | Completion date: November 22, 2013 | Expiration date: July 26, 2013 | Current use: Office | Permit id: 201307262860 | |||||
2 drywall repairs due to flood. New vinyl flooring. Repair work only, no structural work, no wall modification. N a ordinance #155-13 ![]() ![]() Permit type: Otc alterations permit | Completion date: March 26, 2015 | Expiration date: December 30, 2014 | Current use: Retail sales | Permit id: 201412304719 | |||||
No change to building envelope. No change to square footage. 28 sf minior interior tenant improvement including: partial demo of breakroom cabinetry, installation of accent lighting. Elec & t-24 under separate permit. ![]() ![]() Permit type: Otc alterations permit | Completion date: April 7, 2015 | Expiration date: January 9, 2015 | Current use: Office | Permit id: 201501095386 | |||||
Demo of existing suites 205 and 207 to connect with suite 200. New partitions, glazing, doors, ceiling, lighting, elec, and finishes. Maher not req ![]() ![]() Permit type: Otc alterations permit | Completion date: February 1, 2016 | Expiration date: July 29, 2015 | Current use: Office | Permit id: 201507292815 | |||||
Fire sprinkler 2nd floor ti unit 207- add 12 pendentsfor new ceilings- 2015 0729 2815 maher na ![]() ![]() Permit type: Otc alterations permit | Expiration date: September 2, 2015 | Current use: Office | Permit id: 201509025865 | |||||
Fire alarm work, relocation (6) of fire alarm notification. T. I. Pa#201502292815. N a ordinance #155-13 ![]() ![]() Permit type: Otc alterations permit | Completion date: October 30, 2015 | Expiration date: September 16, 2015 | Current use: Office | Permit id: 201509167086 | |||||
New lighting & offices on 2nd floor ![]() Permit status: Complete | Completion date: July 26, 2013 | Permit id: Ew20130319001 | |||||
Voice and data communications cabling ![]() Permit status: Expired | Permit id: Ew20121203641 | |||||
2nd flr: for final inspection only (left by previous contractor) ![]() Permit status: Cancelled | Permit id: E200908121653 | |||||
New lighting & general office space on third floor ![]() Permit status: Complete | Completion date: July 26, 2013 | Permit id: Ew20130319021 | |||||
General kitchen work including new receptacles & light fixturs. ![]() Permit status: Complete | Completion date: July 12, 2013 | Permit id: Ew20130618301 | |||||
Witness test ![]() Permit status: Complete | Completion date: January 16, 2008 | Permit id: E200801114457 | |||||
Conduit & electrical sensors for garage exhaust fan reference to permit # e200706208977 ![]() Permit status: Complete | Completion date: January 18, 2008 | Permit id: E200801174630 | |||||
Garage & 5 floors 4 lights 4 switches 4 receptacles & 2 circuits 12-panels feeders -12 ![]() Permit status: Complete | Completion date: January 29, 2008 | Permit id: E200706208977 | |||||
3rd floor electrical portion of firelife safety inspection ![]() Permit status: Complete | Completion date: July 5, 2013 | Permit id: Ew20130618325 | |||||
Garage and 5 floors 4 lights 4 switches 8 receptacles & 4 circuits 12-panels feeder -12 ![]() Permit status: Complete | Completion date: January 22, 2009 | Permit id: E200706208974 | |||||
Install sub panel as per one line drawing submitted to cheryl rose ok 01 27 09. 1-225 amp. 3 phase wire. 66 bkrs circuits. 2panelboards 1-42 circuit,1-24 circuit, 3 phase wire. ![]() Permit status: Cancelled | Permit id: E200902236998 | |||||
1st floor garage door opening. ![]() Permit status: Complete | Completion date: September 23, 2009 | Permit id: E200909162430 | |||||
Fire alarm monitoring system. ![]() Permit status: Complete | Completion date: April 16, 2008 | Permit id: E200801174614 | |||||
Replace existing fixtures in corridors and stairwells on floors 1-3. Supply & install fixtures and receptacles for spec suite on 2nd floor. ![]() Permit status: Complete | Completion date: July 26, 2013 | Permit id: Ew20120918481 | |||||
Temporally power installation for construction trailer ![]() Permit status: Complete | Completion date: January 16, 2008 | Permit id: Ew20060622939 | |||||
2nd floor: data, communications, and wireless systems: number of cables (42) ![]() Permit status: Complete | Completion date: July 12, 2013 | Permit id: E201303209360 | |||||
#114, re-pull # wire through existing conduit to provide 2 circuits for expresso machine only. Amp feeder, 220v. 1 recepacle. 1 220v, 30amp circuit for under counter outlet for expresso machine. ![]() Permit status: Complete | Completion date: January 23, 2009 | Permit id: E200901205792 | |||||
4 new workstation clusters ![]() Permit status: Complete | Completion date: March 5, 2015 | Permit id: Ew20150123221 | |||||
Electrical portion of fire life safety installation ![]() Permit status: Complete | Completion date: July 5, 2013 | Permit id: Ew20130618324 | |||||
New construction,3 pahse ,120 208 v , 20 a, new main service, installtion of panel boards, lighting fixtures, and outlets etc [scope of work does not include residential electric space heater installation.] ![]() Permit status: Complete | Completion date: January 18, 2008 | Permit id: Ew20060926041 | |||||
2 amp temp service for demo ![]() Permit status: Expired | Permit id: E200602155153 | |||||
The installation of 32 modular workstations ![]() Permit status: Complete | Completion date: January 21, 2016 | Permit id: Ew20150305981 | |||||
Voice and data cabling for suite 202 ![]() Permit status: Complete | Completion date: March 5, 2015 | Permit id: Ew20150203641 | |||||
1st floor: data, communications, and wireless systems: number of cables (42) ![]() Permit status: Complete | Completion date: July 12, 2013 | Permit id: E201303209355 | |||||
The installation of modular workstations ![]() Permit status: Complete | Completion date: December 9, 2015 | Permit id: Ew20151117841 | |||||
Install 11 outlets, 1 track light and 2 or 3 switches in the unit. ![]() Permit status: Complete | Completion date: June 23, 2011 | Permit id: Ew20110615561 | |||||
Tenant improvement of partial floors 1, 2, & all of floor 3 ![]() Permit status: Complete | Completion date: August 1, 2013 | Permit id: Ew20130314521 | |||||
Tenant improvement: 1 f suite - 15 lights, 4 switches, 15 receptacle. ![]() Permit status: Complete | Completion date: September 19, 2013 | Permit id: E201307122070 | |||||
Install 5 exit light and power supply to one door opener. ![]() Permit status: Expired | Permit id: Ew20100826081 | |||||
3rd floor: data, communications and wireless systems: number of cables (42) ![]() Permit status: Complete | Completion date: July 12, 2013 | Permit id: E201303209361 | |||||
Firelife electrical inspection for 1st floor - per chief inspector ron allen ![]() Permit status: Complete | Completion date: July 5, 2013 | Permit id: Ew20130618322 | |||||
Elec and life safety t. I. Build out - job #34322 ![]() Permit status: Issued | Permit id: Ew20150813721 | |||||
Fire alarm monitoring system ![]() Permit status: Cancelled | Permit id: E20070802283 | |||||
Bei job number c15-274 furnish and install (9) furniture pods with (2) cat5e white, plenum data cables, complete with orange rj45 jacks, white faceplates, testing and labeling. ![]() Permit status: Complete | Completion date: December 16, 2015 | Permit id: Ew20151116429 | |||||
Fire sprinkler t. I. ![]() Permit status: Expired | Expiration date: June 17, 2013 | Permit id: Pp20130617689 | |||||
Work category: 5m; replacement of exisitng fan coil unit. Instalaltion of new duct distribution and thermostat ![]() Permit status: Expired | Expiration date: October 30, 2013 | Permit id: Pmw20131030641 | |||||
Work category: 4pb; 15-276 relocate 11 sprinkler heads on the 2nd floor for new offices ![]() Permit status: Complete | Completion date: September 8, 2015 | Expiration date: September 2, 2015 | Permit id: Pw20150902962 | |||||
Work category: 5p; install one new kitchen pantry on the west side of the building ![]() Permit status: Complete | Completion date: July 11, 2013 | Expiration date: July 8, 2013 | Permit id: Pw20130708711 | |||||
2nd floor: new sink, new bathroom fixtures. ![]() Permit status: Expired | Expiration date: August 29, 2012 | Permit id: Pp20120829175 | |||||
Replace and install new hydronic radiators and piping ![]() Permit status: Complete | Completion date: July 10, 2013 | Expiration date: June 26, 2013 | Permit id: Pm20130626951 | |||||
Work type: not listed; sewer and storm trap ![]() Expiration date: January 17, 2008 | Permit id: Pw20080117197 | |||||
Add 2 pendent sprinklers, plug 1 upright sprinkler, install 4 branchline restraints. ![]() Permit status: Complete | Completion date: October 4, 2012 | Expiration date: August 28, 2012 | Permit id: Pp20120828150 | |||||
Fire sprinkler ti 1st ,2nd & 3rd floor ![]() Permit status: Complete | Completion date: July 18, 2013 | Expiration date: March 4, 2013 | Permit id: Pp20130304746 | |||||
Installation of new a c units and ductwork, install of vavs & duct for tennant improvements replacement of a c units on roof. ![]() Permit status: Expired | Expiration date: April 8, 2013 | Permit id: Pm20130408728 | |||||
Work category: 5p; new break room. Kmc #15130 ![]() Permit status: Complete | Completion date: November 20, 2015 | Expiration date: August 4, 2015 | Permit id: Pw20150804237 | |||||
Work category: 5p; install one new coffee sink on the 1st floor, east side of building ![]() Permit status: Complete | Completion date: July 11, 2013 | Expiration date: July 8, 2013 | Permit id: Pw20130708713 | |||||
Install new ada compliant restrooms with ada compliant showers on the 1st flr. Install 1 kitchen pantry on the 1st flr. Install ada compliant restrooms on the 3rd flr. Install 2 ada compliant pantries on the 3rd flr. Install one mop sink on the 3rd flr. Install 3 ada compliant hi-low drinking fountains. ![]() Permit status: Complete | Completion date: July 11, 2013 | Expiration date: March 7, 2013 | Permit id: Pw20130307165 | |||||
Plumbing for sink w. H. And coffee machine ![]() Permit status: Complete | Completion date: December 24, 2008 | Expiration date: December 5, 2008 | Permit id: Pp20081205230 | |||||
SCORE 86 Installation of new a/c units and ductwork install of vavs & duct for tennant improvements replacement of a/c units on roof. ![]() ![]() Permit type: Plumbing permit | Permit status: Issued | Permit id: Pm20130408728 | |||||
SCORE 100 1st floor suite 102 - fire alarm work - additional horn/strobe & strobe light for a t. I. Ref #2013. 06. 05. 8761 Permit type: Building permit | Expiration date: December 7, 2013 | Current use: Office | Permit id: #201308073699 | |||||
SCORE 95 Elec and life safety t. I./build out - job #34322 ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20150813721 | |||||
SCORE 100 2 drywall repairs due to flood. New vinyl flooring. Repair work only no structural work no wall modification. N/a ordinance #155-13 Permit type: Building permit | Current use: Warehouse no frnitur | Permit id: #201412304719 | |||||
SCORE 100 Fire sprinkler 2nd floor ti for suite #207 (renewal of expired pa #201507292815 - add 12 pendents for new ceilings) ref #201509025865. Maher na Permit type: Building permit | Expiration date: May 8, 2018 | Current use: Office | Permit id: #201801047841 | |||||
SCORE 99 Work category: 8p; this boiler was installed well over years ago and is not in the system to track ptos. Inspection is to insure safety and enter into system to track ptos yearly. ![]() ![]() Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20180129077 | |||||
SCORE 100 Tenant improvement: 1/f suite - 15 lights 4 switches 15 receptacle. ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: E201307122070 | |||||
SCORE 100 Interior refurbishment of bldg corridors 2nd floor restrooms & one tenant suite on the 2nd floor. Scope includes new-non-rated partitoins lighting restroom fixtures & interior finishes. No structural work deferred submittals for mechanical electrical including lighting fire/life safety). Permit type: Building permit | Expiration date: July 17, 2013 | Current use: Office | Permit id: #201206293764 | |||||
SCORE 96 Electrical permit for the installation of (85) new modular workstations ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20130506621 | |||||
Change of use from office to personal use tattoo-permanent cosmetics no work ![]() ![]() Permit type: Building permit | Expiration date: September 17, 2017 | Current use: Retail sales | Permit id: #201705025461 | |||||
Change of use from office to personal use permanent cosmetics no work ![]() Permit type: Building permit | Current use: Retail sales | Permit id: #201710201848 | |||||
SCORE 100 Fire alarm work relocation (6) of fire alarm notification. T. I. Pa#201502292815. N/a ordinance #155-13 Permit type: Building permit | Expiration date: January 16, 2016 | Current use: Office | Permit id: #201509167086 | |||||
SCORE 100 Fire sprinkler t. I. ![]() ![]() Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20130617689 |