Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 88 Residential kitchen and bathroom remodel (2 sf) within the (e) areas. At the entry bathroom scope of work is to replace tile floor. Scope of work for the first floor powder room includes all new fixtures and floor tile. Kitchen remodel includes new counter and cabinets, update (e) electrical to meet code. No new appliances. Replace exterior back door within the (e) opening, Permit status: Permit issued | Permit id: 13000-01654 |