Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Operations permit Date: September 10, 2009 Client: Betzler Barry J | Permit status: Completed | Permit id: 19850 | |||||
Alteration permit Date: April 8, 2016 Client: Betzler Barry J | Permit status: Completed | Permit id: 682898 | |||||
Operations permit Date: September 10, 2009 Client: Betzler Barry J | Permit status: Completed | Permit id: 19850 | |||||
Alteration permit Date: April 8, 2016 Client: Betzler Barry J | Permit status: Completed | Permit id: 682898 | |||||
SCORE 100 9 17 09- erection of tent for birthday party Date: September 10, 2009 Contractor: Knight Enterprises Inc Client: Betzler Barry J | Permit type: Operations permit | Permit status: Completed | Permit id: 19850 | |||||
SCORE 93 Make safe permit - for removing and repairing sections of fractured cmu wall as needed to resolve case #496923. Abutting sidewalk must be closed with fencing a minimum of 6 in height. Separate streets department permit required for sidewalk closure. A separate permit is required for any additional alterations that are not specifically addressed on case #496923. Date: April 8, 2016 Contractor: Eartha Construction Co Llc Client: Betzler Barry J | Permit type: Alteration permit | Permit status: Completed | Completion date: April 27, 2016 | Permit id: 682898 |