Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Replacement of fire alarm system plhase 1 of approved corrective action plan to bring building core areas to current code. Current use: Office | Permit id: #200809161705 | |||||
SCORE 100 4th floor - soft demo to remove non load bearing walls and partitions for upcoming ti permit. Current use: Office | Permit id: #200808018230 | |||||
SCORE 100 4th floor-full floor t. I. Construct new doors walls and partitions. Demo done under previous permit. Mechanical electrical sprinklers and life safety to be done under seperate permits Current use: Office | Permit id: #200808088720 | |||||
SCORE 100 Remove convenience stair and slab infill for existing cut out to fill open space between 3rd and 4th floors. Refer to 200808087 for all arch path of travel and disabled access. Current use: Office | Permit id: #200808260054 | |||||
SCORE 100 4th floor-upgrade of fire alarm system on the 4th floor. Installing duct detectors 6 smoke detectors 13 horn strobes and 5 strobes. Current use: Office | Permit id: #200809161703 | |||||
SCORE 100 Replace existing (4) mechanical split system. A c units with (3) new a c units for server room. Current use: Office | Permit id: #200809171885 | |||||
SCORE 100 Refer t. I. Pa# 2008 08 08 8720. Electrical lighting & power systems for ti to add & relocate fixtures outlets and tenant equipment. Current use: Office | Permit id: #200809232393 | |||||
SCORE 100 4th floor-tenant improvements to the (e) wet & pre-action fire sprinkler systems-73 relocates (loweved) 1 new Current use: Office | Permit id: #200809232416 | |||||
SCORE 100 Lobby renovation - modify front doors. Change flooring. Add lighting fixtures. (n) canopy over (e) van accessible parking space. Current use: Office | Permit id: #200902041363 | |||||
SCORE 100 Relcoate 3 (e) down-light from elevator lobby install 2 exterior downlight and 2 wall sconce at main entrance furnish & install wall washers fixtures for elevator and entry lobbies. Current use: Office | Permit id: #200904166469 | |||||
SCORE 99 1st floor interior remodel remove (e) partitions replace with new partitions new flooring. Current use: Office | Permit id: #201009150892 | |||||
SCORE 98 1st floor ti work. Relocate 4 heat pumps and install 1 new server room ac unit arch pa #201009150892. Current use: Office | Permit id: #201012036056 | |||||
SCORE 100 Add 28 new sprinkler heads on 1st floor of an extg bldg. Relocate 9 sprinkler heads and delete 3 heads. Current use: Office | Permit id: #201012096384 | |||||
SCORE 99 1st floor - electrical work reference pa #201009150892. Current use: Office | Permit id: #201012146659 | |||||
SCORE 100 Fire alarm addition of smoke detector 7 duct detector 12 h s and 1 horn due to tenant improvement on the 1st floor. Remove 1 pull station Current use: Office | Permit id: #201012206989 | |||||
SCORE 99 Revision to pa# 2010. 09. 15. 0892. The power and data plan was mistakenly left out of the original permit. This is to correct that mistake Current use: Office | Permit id: #201101067971 | |||||
SCORE 93 Install covered awning over van accessible parking spot. ![]() ![]() Permit id: #201104073680 | |||||
Install metal covered parking. Structure over van accessible parking stall in private alley behind bldg. ![]() Current use: Office | Permit id: #201106309280 | |||||
SCORE 100 2nd floor existing fire sprinkler system tenant improvements - 19 relocated sprinklers 6 added sprinklers 1 removed sprinklers. Current use: Office | Permit id: #201205241182 | |||||
Tenant improvements new drywall doors millwork hvac lighting & plumbing. ![]() ![]() Current use: Office | Permit id: #201207104412 | |||||
SCORE 100 Add 1 smoke detector 1 relay 1 control module 15 horn strobes and 1 strobe. Replace 1 existing power supply 1 horn strobe 2 strobes on the 2nd fl Current use: Office | Permit id: #201208066617 | |||||
SCORE 99 Basement 1st 2nd 3rd 4th 5th 6th floors-install evacuation plaques (21 signs) Current use: Office | Permit id: #201305025989 | |||||
SCORE 100 New 1-hr rated partitoins to close off convenience stair between 5th & 6th floor. No other work. Current use: Office | Permit id: #201307010868 | |||||
SCORE 100 Add 2 power supplies 2 control modules 2 relays and 1 module transponder to the extg fire alarm system. There is no bldg permit associated with this work. N a for the maher ordinance #155-13 Current use: Office | Permit id: #201407161385 | |||||
Cti ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: August 22, 1989 | Expiration date: December 25, 1989 | Current use: Office | Permit id: 8915386 | |||||
Cti-2 ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: February 12, 1990 | Expiration date: March 20, 1991 | Current use: Office | Permit id: 9002806 | |||||
SCORE 82 Elec. And life safety - job #33044 ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20120806781 | |||||
SCORE 95 Install wiremold on floor for new desks and some wiremold on wall. Install one light fixture and 5 wall plugs. ![]() ![]() Permit type: Electrical permit | Permit status: Complete | Permit id: Ew20120106161 | |||||
SCORE 82 Elec work - job #33000 ![]() ![]() Permit type: Electrical permit | Permit status: Complete | Permit id: Ew20120410561 | |||||
SCORE 95 Install (225) data cables. ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20120410541 | |||||
Cti-2 fl6 (el me) ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: July 8, 1992 | Expiration date: July 22, 1993 | Current use: Office | Permit id: 9211232 | |||||
Permit to operate boiler ![]() Permit status: Issued | Expiration date: March 18, 2011 | Permit id: 55378 | |||||
T-mobile proposes to install a new wireless site. The scope of works will include: install 9 new antennas 3 new rrus 1 mucrowave antenna. Extend existing mechanical wall vertically. ![]() Permit type: Building permit | Current use: Office | Permit id: #201509217569 | |||||
Add 28 new sprinkler heads on 1st floor of an extg bldg. Relocate 9 sprinkler heads and delete 3 heads. ![]() Permit type: Otc alterations permit | Permit status: Issued | Completion date: December 9, 2010 | Expiration date: December 4, 2011 | Current use: Office | Permit id: 201012096384 | |||||
SCORE 95 Relocate (2) existing lights and install (4) new led garage lights and (3) strip lights ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20131216101 | |||||
Permit to operate boiler ![]() Permit status: Issued | Expiration date: February 27, 2014 | Permit id: 72182 | |||||
Permit to operate boiler ![]() Permit status: Issued | Expiration date: May 27, 1999 | Permit id: 12661 | |||||
Permit to operate boiler ![]() Permit status: Issued | Expiration date: October 15, 2005 | Permit id: 30177 | |||||
Permit to operate boiler ![]() Permit status: Issued | Expiration date: June 22, 1998 | Permit id: 11913 | |||||
SCORE 95 Modular office furniture; (49) workstations chris varley 510-719-8533 ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20120504961 | |||||
Cti ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: February 15, 1990 | Expiration date: June 22, 1990 | Current use: Office | Permit id: 9003145 | |||||
SCORE 97 Provided 1 volt power for 2 fire alarm power supplies ![]() ![]() Permit type: Electrical permit | Permit status: Complete | Permit id: Ew20141013561 | |||||
SCORE 95 Access control ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20151021481 | |||||
SCORE 95 Install (85) data cables ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20120914664 | |||||
Cti-3 4/f sp ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: June 17, 1994 | Expiration date: December 24, 1994 | Current use: Office | Permit id: 9409366 | |||||
Permit to operate boiler ![]() Permit status: Issued | Expiration date: October 23, 2008 | Permit id: 43209 | |||||
SCORE 95 The installation of 96 workstations with electrical components ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew201604267742 | |||||
SCORE 98 Electrical work for ti ref pa 2016-0325-3107 Permit type: Building permit | Current use: Office | Permit id: #201604074204 | |||||
SCORE 95 Communication cabling services ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew201606018469 | |||||
SCORE 95 New lighting and lighting control in open office area. New fire alarm ![]() ![]() Permit type: Electrical permit | Permit status: Complete | Permit id: Ew201605047915 | |||||
SCORE 93 Install covered awning over van accessible parking spot. ![]() ![]() Permit type: Building permit | Permit id: #201104073680 | |||||
Permit to operate boiler ![]() Permit status: Issued | Expiration date: November 16, 2015 | Permit id: 83637 | |||||
SCORE 100 Work category: 5p; install 3 new kitchen sinks. Replace fixtures in mens and womens bathrooms. All work on floor 2. ![]() ![]() Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20120806685 | |||||
Cti-2 ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: February 12, 1990 | Expiration date: September 13, 1990 | Current use: Office | Permit id: 9002807 | |||||
Permit to operate boiler ![]() Permit status: Issued | Expiration date: November 14, 2007 | Permit id: 39101 | |||||
SCORE 98 1st floor ti work. Relocate 4 heat pumps and install 1 new server room ac unit arch pa #201009150892. Permit type: Building permit | Expiration date: December 3, 2011 | Current use: Office | Permit id: #201012036056 | |||||
SCORE 100 Add 28 new sprinkler heads on 1st floor of an extg bldg. Relocate 9 sprinkler heads and delete 3 heads. Permit type: Building permit | Expiration date: June 9, 2011 | Current use: Office | Permit id: #201012096384 | |||||
SCORE 99 1st floor - electrical work reference pa #201009150892. Permit type: Building permit | Expiration date: December 16, 2011 | Current use: Office | Permit id: #201012146659 | |||||
Renew appln#9404179 ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: January 12, 1996 | Expiration date: May 12, 1996 | Current use: Office | Permit id: 9600628 | |||||
Cti-1....................................................... ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: January 18, 1990 | Expiration date: February 9, 1991 | Current use: Office | Permit id: 9001211 | |||||
Additions alterations or repairs ![]() Permit status: Complete | Completion date: November 25, 1981 | Expiration date: April 17, 1982 | Permit id: 8110114 | |||||
SCORE 99 Revision to pa# 2010. 09. 15. 0892. The power and data plan was mistakenly left out of the original permit. This is to correct that mistake Permit type: Building permit | Expiration date: May 6, 2011 | Current use: Office | Permit id: #201101067971 | |||||
Permit to operate boiler ![]() Permit status: Issued | Expiration date: November 19, 2002 | Permit id: 19047 | |||||
Electrical work for ti ref pa 2016-0325-3107 ![]() Permit type: Otc alterations permit | Permit status: Issued | Completion date: April 7, 2016 | Expiration date: April 7, 2017 | Current use: Office | Permit id: 201604074204 | |||||
SCORE 100 New 1-hr rated partitoins to close off convenience stair between 5th & 6th floor. No other work. Permit type: Building permit | Expiration date: January 5, 2014 | Current use: Office | Permit id: #201307010868 | |||||
Add 2 power supplies 2 control modules 2 relays and 1 module transponder to the extg fire alarm system. There is no bldg permit associated with this work. N/a for the maher ordinance #155-13 ![]() ![]() Permit type: Building permit | Expiration date: July 11, 2015 | Current use: Office | Permit id: #201407161385 | |||||
Tenant improvements new drywall doors millwork hvac lighting & plumbing. ![]() ![]() Permit type: Building permit | Expiration date: July 11, 2014 | Current use: Office | Permit id: #201207104412 | |||||
Provide new cased opening in (e)non load bearing(9713091) ![]() Permit type: Otc alterations permit | Permit status: Expired | Completion date: May 28, 1998 | Expiration date: September 28, 1998 | Current use: Office | Permit id: 9809591 | |||||
Install metal covered parking. Structure over van accessible parking stall in private alley behind bldg. ![]() Permit type: Building permit | Current use: Office | Permit id: #201106309280 | |||||
SCORE 100 Work category: 4pb; relocate existing sprinkler heads and add to accommodate new layout. Stumbleupon 2nd floor. Ar&b # 12-093 ![]() ![]() Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20120605457 | |||||
Expansion of (e) tenant space new aprtitions ceiling ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: April 2, 1991 | Expiration date: April 22, 1992 | Current use: Office | Permit id: 9105180 | |||||
1st floor ti work. Relocate 4 heat pumps and install 1 new server room ac unit arch pa #201009150892. ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: December 3, 2010 | Expiration date: November 28, 2011 | Current use: Office | Permit id: 201012036056 | |||||
Renewal of application 9722930 Permit type: Otc alterations permit | Permit status: Expired | Completion date: February 17, 2000 | Expiration date: June 17, 2000 | Current use: Office | Permit id: 200002172168 | |||||
Street space; setup. Permit type: Otc alterations permit | Permit status: Issued | Completion date: December 16, 2015 | Permit id: M647387 | |||||
Permit to operate boiler ![]() Permit status: Issued | Expiration date: September 25, 2001 | Permit id: 16066 | |||||
1st floor interior remodel remove (e) partitions replace with new partitions new flooring. ![]() Permit type: Otc alterations permit | Permit status: Expired | Completion date: September 15, 2010 | Expiration date: September 20, 2013 | Current use: Office | Permit id: 201009150892 | |||||
Permit to operate boiler ![]() Permit status: Issued | Expiration date: September 10, 2012 | Permit id: 63824 | |||||
SCORE 100 2nd floor existing fire sprinkler system tenant improvements - 19 relocated sprinklers 6 added sprinklers 1 removed sprinklers. Permit type: Building permit | Expiration date: November 24, 2012 | Current use: Office | Permit id: #201205241182 | |||||
Install metal covered parking. Structure over van accessible parking stall in private alley behind bldg. ![]() Permit type: Additions alterations or repairs | Permit status: Approved | Completion date: June 30, 2011 | Current use: Office | Permit id: 201106309280 | |||||
Permit to operate boiler ![]() Permit status: Issued | Expiration date: October 21, 2016 | Permit id: 90741 | |||||
Add 1 smoke detector 1 relay 1 control module 15 horn strobes and 1 strobe. Replace 1 existing power supply 1 horn/strobe 2 strobes on the 2nd fl ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: August 6, 2012 | Expiration date: August 1, 2013 | Current use: Office | Permit id: 201208066617 | |||||
Ct1-2 ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: March 8, 1990 | Expiration date: March 26, 1991 | Current use: Office | Permit id: 9004563 | |||||
Sprinklers ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: September 22, 1997 | Expiration date: April 10, 1998 | Current use: Office | Permit id: 9718583 | |||||
Cti-1....................................................... ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: January 18, 1990 | Expiration date: February 2, 1991 | Current use: Office | Permit id: 9001210 | |||||
Demo (e) field built desking system including pole supported lighting fixtures & replace w/new modular furniture system & new lighting (led) provided as a deffered subbmittal work also includes minor in-fill of interior openings. Maher na ![]() Permit type: Otc alterations permit | Permit status: Issued | Completion date: March 25, 2016 | Expiration date: April 7, 2017 | Current use: Office | Permit id: 201603253107 | |||||
Renew: 9718583 9720389 9723706 9722282 for final only ![]() Permit type: Otc alterations permit | Permit status: Expired | Completion date: February 11, 2000 | Expiration date: June 11, 2000 | Current use: Office | Permit id: 200002111692 | |||||
Fire alarm addition of smoke detector 7 duct detector 12 h/s and 1 horn due to tenant improvement on the 1st floor. Remove 1 pull station ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: December 20, 2010 | Expiration date: December 15, 2011 | Current use: Office | Permit id: 201012206989 | |||||
Renew app #9403853 ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: January 12, 1996 | Expiration date: May 12, 1996 | Current use: Office | Permit id: 9600630 | |||||
SCORE 99 1st floor interior remodel remove (e) partitions replace with new partitions new flooring. Permit type: Building permit | Expiration date: October 6, 2012 | Current use: Office | Permit id: #201009150892 | |||||
Struct. Cal for stair (3/f & 4/f) struct. Approval of stair ![]() Permit type: Otc alterations permit | Permit status: Expired | Completion date: November 21, 1997 | Expiration date: March 21, 1998 | Current use: Office | Permit id: 9723603 | |||||
Permit to operate boiler ![]() Permit status: Issued | Expiration date: October 18, 2006 | Permit id: 34076 | |||||
Cti ii ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: April 6, 1990 | Expiration date: August 26, 1990 | Current use: Office | Permit id: 9006691 | |||||
Soft demo & clean-up only no structural work ![]() Permit type: Otc alterations permit | Permit status: Expired | Completion date: August 22, 1997 | Expiration date: February 22, 1998 | Current use: Office | Permit id: 9716221 | |||||
Build ceiling high drywall partit/install dr create 2 office ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: July 15, 1997 | Expiration date: January 15, 1998 | Current use: Office | Permit id: 9713091 | |||||
4th floor-tenant improvements to the (e) wet & pre-action fire sprinkler systems-73 relocates (loweved) 1 new ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: September 23, 2008 | Expiration date: September 18, 2009 | Current use: Office | Permit id: 200809232416 | |||||
Mechanical hvac arch pa9403853 ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: March 18, 1994 | Expiration date: May 6, 1995 | Current use: Office | Permit id: 9404179 | |||||
Replace existing (4) mechanical split system. A/c units with (3) new a/c units for server room. ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: September 17, 2008 | Expiration date: September 12, 2009 | Current use: Office | Permit id: 200809171885 | |||||
Modified work to application number 8901223 new elevator ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: August 23, 1989 | Expiration date: November 10, 1990 | Current use: Office | Permit id: 8915385 | |||||
4th floor-full floor t. I. Construct new doors walls and partitions. Demo done under previous permit. Mechanical electrical sprinklers and life safety to be done under seperate permits ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: August 8, 2008 | Expiration date: August 19, 2009 | Current use: Office | Permit id: 200808088720 | |||||
2nd floor existing fire sprinkler system tenant improvements - 19 relocated sprinklers 6 added sprinklers 1 removed sprinklers. ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: May 24, 2012 | Expiration date: May 19, 2013 | Current use: Office | Permit id: 201205241182 | |||||
Cit 1 floor 5 ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: May 10, 1991 | Expiration date: May 30, 1992 | Current use: Office | Permit id: 9108165 | |||||
Cti-i ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: August 22, 1990 | Expiration date: September 18, 1991 | Current use: Manufacturing | Permit id: 9016817 | |||||
Install new access toilet rms seismic bracing elevator ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: January 25, 1989 | Expiration date: October 17, 1991 | Current use: Office | Permit id: 8901223 | |||||
Lobby renovation - modify front doors. Change flooring. Add lighting fixtures. (n) canopy over (e) van accessible parking space. ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: February 4, 2009 | Expiration date: March 4, 2010 | Current use: Office | Permit id: 200902041363 | |||||
New 1-hr rated partitoins to close off convenience stair between 5th & 6th floor. No other work. ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: July 1, 2013 | Expiration date: June 30, 2014 | Current use: Office | Permit id: 201307010868 | |||||
Add concrete pad on roof for future generator ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: March 30, 2000 | Expiration date: November 3, 2000 | Current use: Office | Permit id: 200003305877 | |||||
Revision to #9718583 sprinklers ![]() Permit type: Otc alterations permit | Permit status: Expired | Completion date: November 24, 1997 | Expiration date: March 24, 1998 | Current use: Office | Permit id: 9723706 | |||||
Remove non-structural partitions ceiling and finishes ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: March 9, 1994 | Expiration date: September 21, 1994 | Current use: Office | Permit id: 9403713 | |||||
Cti i ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: March 28, 1990 | Expiration date: August 12, 1990 | Current use: Office | Permit id: 9005944 | |||||
Cutting comunicating opening ![]() Permit type: Additions alterations or repairs | Permit status: Cancelled | Completion date: October 13, 1999 | Current use: Office | Permit id: 9921650 | |||||
T-mobile proposes to install a new wireless site. The scope of works will include: install 9 new antennas 3 new rrus 1 mucrowave antenna. Extend existing mechanical wall vertically. ![]() Permit type: Additions alterations or repairs | Permit status: Filed | Completion date: September 21, 2015 | Current use: Office | Permit id: 201509217569 | |||||
Removal of 4" thickness of asphalt/concrete ![]() Permit type: Otc alterations permit | Permit status: Filing | Completion date: March 29, 1999 | Current use: Office | Permit id: 9905932 | |||||
Cti-2 ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: February 12, 1990 | Expiration date: March 14, 1991 | Current use: Office | Permit id: 9002805 | |||||
Cti-ii ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: August 22, 1990 | Expiration date: September 18, 1991 | Current use: Office | Permit id: 9016816 | |||||
Minor revision to #9710806 change foundatn of partitn walls ![]() Permit type: Otc alterations permit | Permit status: Expired | Completion date: November 4, 1997 | Expiration date: March 4, 1998 | Current use: Office | Permit id: 9722277 | |||||
Modify (e) sprinkler system to conform to new sprinkler plan ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: September 27, 1990 | Expiration date: April 25, 1991 | Current use: Office | Permit id: 9019508 | |||||
Cti-2 ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: March 7, 1990 | Expiration date: October 12, 1990 | Current use: Office | Permit id: 9004469 | |||||
Slope sidewalk for accessibility (ref. 9710806) ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: November 13, 1997 | Expiration date: July 9, 1998 | Current use: Office | Permit id: 9722930 | |||||
Cti-2 ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: March 8, 1990 | Expiration date: March 26, 1991 | Current use: Office | Permit id: 9004564 | |||||
Expansion of elect. Systems lighting nd power. ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: April 30, 1991 | Expiration date: November 30, 1991 | Current use: Office | Permit id: 9107355 | |||||
5th floor: fire alarm add(6) new horn/strobes & (9) mew strobes & replace (11) existing horn/strobes & (3) existing strobes. Ref bldg. #2016-0325-3107. ![]() Permit type: Otc alterations permit | Permit status: Issued | Completion date: May 25, 2016 | Expiration date: November 25, 2016 | Current use: Office | Permit id: 201605258276 | |||||
Add partial doors to 6th floor reception area ![]() Permit type: Otc alterations permit | Permit status: Expired | Completion date: May 15, 2002 | Expiration date: May 15, 2003 | Current use: Office | Permit id: 200205156652 | |||||
Refer pa#9817689-connecting bridge between stanford &brannan ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: October 14, 1998 | Expiration date: June 9, 1999 | Current use: Office | Permit id: 9820941 | |||||
Ti on 2 flrs; 2nd & 3rd flrs remodel ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: June 13, 1997 | Expiration date: October 6, 1999 | Current use: Office | Permit id: 9710806 | |||||
Cti-2 4/f el ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: July 21, 1994 | Expiration date: December 5, 1994 | Current use: Office | Permit id: 9411597 | |||||
Removal on non-structural interior partitions ceiling. ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: October 25, 1988 | Expiration date: November 22, 1989 | Current use: Office | Permit id: 8816099 | |||||
Install covered awning over van accessible parking spot. ![]() Permit type: Otc alterations permit | Permit status: Withdrawn | Completion date: April 7, 2011 | Permit id: 201104073680 | |||||
4th floor - soft demo to remove non load bearing walls and partitions for upcoming ti permit. ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: August 1, 2008 | Expiration date: August 1, 2009 | Current use: Office | Permit id: 200808018230 | |||||
Cti-1 fl 6 el me ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: June 10, 1992 | Expiration date: June 24, 1993 | Current use: Office | Permit id: 9209499 | |||||
Tenant improvement to the ground floor including bathrooms ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: March 11, 1994 | Expiration date: April 22, 1995 | Current use: Office | Permit id: 9403853 | |||||
Renew appln #9622098 ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: September 22, 1998 | Expiration date: January 22, 1999 | Current use: Office | Permit id: 9819142 | |||||
Cti ii ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: September 28, 1990 | Expiration date: October 17, 1991 | Current use: Office | Permit id: 9019956 | |||||
Sprinkler on 2nd fl0or ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: October 14, 1997 | Expiration date: May 24, 1998 | Current use: Office | Permit id: 9720389 | |||||
Basement/1st/2nd/3rd/4th/5th/6th floors-install evacuation plaques (21 signs) ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: May 2, 2013 | Expiration date: April 27, 2014 | Current use: Office | Permit id: 201305025989 | |||||
Cti 1 ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: March 30, 1990 | Expiration date: October 12, 1990 | Current use: Office | Permit id: 9006214 | |||||
Installation of fm2 fire suppression sym for 5/f cable rm ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: April 4, 1996 | Expiration date: November 29, 1996 | Current use: Office | Permit id: 9605716 | |||||
Fire protection work on the 5th & 6th flrs. ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: September 17, 1992 | Expiration date: April 27, 1993 | Current use: Office | Permit id: 9216028 | |||||
Install fire sprinkler system ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: July 26, 1989 | Expiration date: October 2, 1990 | Current use: Office | Permit id: 8913210 | |||||
Cti-1 ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: April 26, 1991 | Expiration date: May 17, 1992 | Current use: Office | Permit id: 9107194 | |||||
Ti sprinklers on ground floor h/c compl#9403853 9404179 ![]() Permit type: Otc alterations permit | Permit status: Expired | Completion date: March 22, 1994 | Expiration date: September 22, 1994 | Current use: Office | Permit id: 9404589 | |||||
Cti-1 ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: March 7, 1990 | Expiration date: March 13, 1991 | Current use: Office | Permit id: 9004468 | |||||
Modify(e)sym 1/f add 3 sprinkler/relocate 1 & remove 1 ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: July 23, 1997 | Expiration date: November 23, 1997 | Current use: Office | Permit id: 9713743 | |||||
Cti-2 4/f el me ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: May 23, 1994 | Expiration date: June 9, 1995 | Current use: Office | Permit id: 9408007 | |||||
Relcoate 3 (e) down-light from elevator lobby install 2 exterior downlight and 2 wall sconce at main entrance furnish & install wall washers fixtures for elevator and entry lobbies. ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: April 16, 2009 | Expiration date: April 11, 2010 | Current use: Office | Permit id: 200904166469 | |||||
Cti-1 fl 5 el me sp ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: June 10, 1992 | Expiration date: June 24, 1993 | Current use: Office | Permit id: 9209500 | |||||
Replacement of fire alarm system phase 1 of approved corrective action plan to bring building core areas to current code. ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: September 16, 2008 | Expiration date: October 31, 2009 | Current use: Office | Permit id: 200809161705 | |||||
Cti i ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: March 28, 1990 | Expiration date: August 20, 1990 | Current use: Office | Permit id: 9005945 | |||||
Remove convenience stair and slab infill for existing cut out to fill open space between 3rd and 4th floors. Refer to 200808087 for all arch path of travel and disabled access. ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: August 26, 2008 | Expiration date: February 28, 2009 | Current use: Office | Permit id: 200808260054 | |||||
Removal of asphalt paving & concrete at brannan & 2nd sts ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: November 13, 1996 | Expiration date: February 26, 1998 | Current use: Office | Permit id: 9622098 | |||||
Modify (e) fire sprinkler system to conform to enw t-bar clg ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: February 21, 1990 | Expiration date: October 19, 1990 | Current use: Office | Permit id: 9003374 | |||||
Cti-2 fl 5 (el me) ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: July 8, 1992 | Expiration date: July 22, 1993 | Current use: Office | Permit id: 9211233 | |||||
Renew app #9404589 ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: January 12, 1996 | Expiration date: May 12, 1996 | Current use: Office | Permit id: 9600629 | |||||
Revision to pa# 2010. 09. 15. 0892. The power and data plan was mistakenly left out of the original permit. This is to correct that mistake ![]() Permit type: Otc alterations permit | Permit status: Issued | Completion date: January 6, 2011 | Expiration date: January 1, 2012 | Current use: Office | Permit id: 201101067971 | |||||
Cti 1 4th fl el me sp ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: May 2, 1994 | Expiration date: May 11, 1995 | Current use: Office | Permit id: 9406923 | |||||
1st floor - electrical work reference pa #201009150892. ![]() Permit type: Otc alterations permit | Permit status: Issued | Completion date: December 14, 2010 | Expiration date: November 30, 2013 | Current use: Office | Permit id: 201012146659 | |||||
Relocate fire alarm revision to appl #9710806 ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: November 4, 1997 | Expiration date: April 2, 1998 | Current use: Office | Permit id: 9722282 | |||||
Const of communication stairs connt 5 & 6 stairs (#9209499) ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: September 16, 1992 | Expiration date: March 31, 1993 | Current use: Office | Permit id: 9215880 | |||||
4th floor-upgrade of fire alarm system on the 4th floor. Installing duct detectors 6 smoke detectors 13 horn/strobes and 5 strobes. ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: September 16, 2008 | Expiration date: September 11, 2009 | Current use: Office | Permit id: 200809161703 | |||||
Street space & mta Permit type: Otc alterations permit | Permit status: Issued | Completion date: July 26, 2012 | Permit id: M337967 | |||||
Remove wood window sash-install aluminium windows ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: October 19, 1984 | Expiration date: November 13, 1985 | Current use: Office | Permit id: 8411284 | |||||
Cti-2 ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: March 8, 1990 | Expiration date: March 26, 1991 | Current use: Office | Permit id: 9004562 | |||||
Additions alterations or repairs ![]() Permit status: Complete | Completion date: February 14, 1985 | Expiration date: September 13, 1985 | Current use: Office | Permit id: 8501469 | |||||
Refer t. I. Pa# 2008/08/08/8720. Electrical lighting & power systems for ti to add & relocate fixtures outlets and tenant equipment. ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: September 23, 2008 | Expiration date: September 18, 2009 | Current use: Office | Permit id: 200809232393 | |||||
Renew:9716221 9723603 09710806 9722277 ![]() Permit type: Otc alterations permit | Permit status: Expired | Completion date: February 11, 2000 | Expiration date: June 11, 2000 | Current use: Office | Permit id: 200002111689 | |||||
Removal of 4" thickneww of asphalt & concrete pavinl at bran ![]() Permit type: Otc alterations permit | Permit status: Expired | Completion date: March 29, 1999 | Expiration date: September 29, 1999 | Current use: Office | Permit id: 9905947 | |||||
Build ceiling high drywall partit install dr create 2 office ![]() ![]() Permit type: Otc alterations permit | Permit status: Complete | Expiration date: July 15, 1997 | Current use: Office | Permit id: 9713091 | |||||
Demo (e) field built desking system including pole supported lighting fixtures & replace w new modular furniture system & new lighting (led) provided as a deffered subbmittal work also includes minor in-fill of interior openings. Maher na ![]() ![]() Permit type: Otc alterations permit | Permit status: Issued | Expiration date: March 25, 2016 | Current use: Office | Permit id: 201603253107 | |||||
SCORE 100 Add 2 power supplies 2 control modules 2 relays and 1 module transponder to the extg fire alarm system. There is no bldg permit associated with this work. N a for the maher ordinance #155-13 Permit type: Building permit | Expiration date: July 11, 2015 | Current use: Office | Permit id: #201407161385 | |||||
Add 2 power supplies 2 control modules 2 relays and 1 module transponder to the extg fire alarm system. There is no bldg permit associated with this work. N a for the maher ordinance #155-13 ![]() ![]() Permit type: Otc alterations permit | Permit status: Complete | Expiration date: July 16, 2014 | Current use: Office | Permit id: 201407161385 | |||||
Replace existing (4) mechanical split system. A c units with (3) new a c units for server room. ![]() ![]() Permit type: Otc alterations permit | Permit status: Complete | Expiration date: September 17, 2008 | Current use: Office | Permit id: 200809171885 | |||||
Add 1 smoke detector 1 relay 1 control module 15 horn strobes and 1 strobe. Replace 1 existing power supply 1 horn strobe 2 strobes on the 2nd fl ![]() ![]() Permit type: Otc alterations permit | Permit status: Complete | Expiration date: August 6, 2012 | Current use: Office | Permit id: 201208066617 | |||||
Fire alarm addition of smoke detector 7 duct detector 12 h s and 1 horn due to tenant improvement on the 1st floor. Remove 1 pull station ![]() ![]() Permit type: Otc alterations permit | Permit status: Complete | Expiration date: December 20, 2010 | Current use: Office | Permit id: 201012206989 | |||||
Struct. Cal for stair (3 f & 4 f) struct. Approval of stair ![]() ![]() Permit type: Otc alterations permit | Permit status: Expired | Expiration date: November 21, 1997 | Current use: Office | Permit id: 9723603 | |||||
1 f 2 f 6 f- remove and replace water source heat pumps with new like for like units. N a ordinance #155-13 ![]() ![]() Permit type: Building permit | Expiration date: November 2, 2017 | Current use: Office | Permit id: #201611021696 | |||||
Cti-3 4 f sp ![]() ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Expiration date: June 17, 1994 | Current use: Office | Permit id: 9409366 | |||||
Permit to operate boiler ![]() Permit status: Issued | Expiration date: October 26, 2004 | Permit id: 26277 | |||||
Removal of 4" thickness of asphalt concrete ![]() ![]() Permit type: Otc alterations permit | Permit status: Filing | Expiration date: March 29, 1999 | Current use: Office | Permit id: 9905932 | |||||
5th floor: fire alarm add(6) new horn strobes & (9) mew strobes & replace (11) existing horn strobes & (3) existing strobes. Ref bldg. #2016-0325-3107. ![]() ![]() Permit type: Otc alterations permit | Permit status: Issued | Expiration date: May 25, 2016 | Current use: Office | Permit id: 201605258276 | |||||
Cti-2 4 f el ![]() ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Expiration date: July 21, 1994 | Current use: Office | Permit id: 9411597 | |||||
Basement 1st 2nd 3rd 4th 5th 6th floors-install evacuation plaques (21 signs) ![]() ![]() Permit type: Otc alterations permit | Permit status: Complete | Expiration date: May 2, 2013 | Current use: Office | Permit id: 201305025989 | |||||
Installation of fm2 fire suppression sym for 5 f cable rm ![]() ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Expiration date: April 4, 1996 | Current use: Office | Permit id: 9605716 | |||||
Ti sprinklers on ground floor h c compl#9403853 9404179 ![]() ![]() Permit type: Otc alterations permit | Permit status: Expired | Expiration date: March 22, 1994 | Current use: Office | Permit id: 9404589 | |||||
Modify(e)sym 1 f add 3 sprinkler relocate 1 & remove 1 ![]() ![]() Permit type: Otc alterations permit | Permit status: Complete | Expiration date: July 23, 1997 | Current use: Office | Permit id: 9713743 | |||||
Cti-2 4 f el me ![]() ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Expiration date: May 23, 1994 | Current use: Office | Permit id: 9408007 | |||||
4th floor-upgrade of fire alarm system on the 4th floor. Installing duct detectors 6 smoke detectors 13 horn strobes and 5 strobes. ![]() ![]() Permit type: Otc alterations permit | Permit status: Complete | Expiration date: September 16, 2008 | Current use: Office | Permit id: 200809161703 | |||||
Refer t. I. Pa# 2008 08 08 8720. Electrical lighting & power systems for ti to add & relocate fixtures outlets and tenant equipment. ![]() ![]() Permit type: Otc alterations permit | Permit status: Complete | Expiration date: September 23, 2008 | Current use: Office | Permit id: 200809232393 | |||||
Elec work - job #33000 Permit status: Complete | Permit id: Ew20120410561 | |||||
Access control Permit status: Filed | Permit id: Ew20151021461 | |||||
Install 12 plugs on existing circuits. Run conduit mount boxes. Permit status: Complete | Permit id: Ew20110819126 | |||||
Install (85) data cables Permit status: Complete | Permit id: Ew20120914664 | |||||
Install of 121 category 6 cables Permit status: Complete | Permit id: Ew20101223301 | |||||
Elec. And life safety - job #33044 Permit status: Complete | Permit id: Ew20120806781 | |||||
Relocate (2) existing lights and install (4) new led garage lights and (3) strip lights Permit status: Expired | Permit id: Ew20131216101 | |||||
Access control Permit status: Filed | Permit id: Ew20151021481 | |||||
Install (225) data cables. Permit status: Expired | Permit id: Ew20120410541 | |||||
Pivot interiors to intall 28 resolve stations with 9 basefeeds and 35 receptacles Permit status: Complete | Permit id: Ew20101222121 | |||||
Access control Permit status: Filed | Permit id: Ew20151021482 | |||||
Communication cabling services Permit status: Issued | Permit id: Ew201606018469 | |||||
Modular office furniture; (49) workstations chris varley 510-719-8533 Permit status: Complete | Permit id: Ew20120504961 | |||||
Demo and install electrical devices on ground floor lights. Permit status: Complete | Permit id: E200904068444 | |||||
80+ fixtures switches outlets Permit status: Complete | Permit id: Ew20101122382 | |||||
224 receptacles install (112) cubicles workstations Permit status: Complete | Permit id: E200809191455 | |||||
Provided 1 volt power for 2 fire alarm power supplies Permit status: Complete | Permit id: Ew20141013561 | |||||
Install 3-6 kva ups 6lc secondary distribution Permit status: Complete | Permit id: E200902046349 | |||||
New lighting and lighting control in open office area. New fire alarm Permit status: Complete | Permit id: Ew201605047915 | |||||
The installation of 96 workstations with electrical components Permit status: Complete | Permit id: Ew201604267742 | |||||
Additional per collin wing Permit status: Complete | Permit id: Ew20110110542 | |||||
1 carbon monoxide controller transducers and 1 horn garage Permit status: Complete | Permit id: E20030729954 | |||||
Install new smoke detectors horn strobes re-use existing conduits as neccessary. Permit status: Complete | Permit id: E200812154766 | |||||
Slioc (9)lights (6)switches (6)receptacles life safety add (2)strobes [scope of work does not include residential electric space heater installation.] Permit status: Complete | Permit id: Ew20080827801 | |||||
Install wiremold on floor for new desks and some wiremold on wall. Install one light fixture and 5 wall plugs. Permit status: Complete | Permit id: Ew20120106161 | |||||
Safe off and reconnect 9 heat pumps Permit status: Filed | Permit id: Ew201612162441 | |||||
Workcategory:4pb;relocateexistingsprinklerheadsandaddtoaccommodatenewlayout. Stumbleupon2ndfloor. Ar&b#12-093 ![]() Permit status: Complete | Expiration date: June 5, 2012 | Permit id: Pw20120605457 | |||||
Firesprinklertenantimprovement@4thfloor-slidespace-ar&b#11903. ![]() Permit status: Complete | Expiration date: September 25, 2008 | Permit id: Pp20080925195 | |||||
Adabathroom&kitchenremodel. ![]() Permit status: Complete | Expiration date: September 5, 2008 | Permit id: Pp20080905337 | |||||
Groundfloor:tiworkrelocate(4)hpsandinstall(1)newserviceroom-acunit ![]() Permit status: Complete | Expiration date: December 2, 2010 | Permit id: Pp20101202502 | |||||
Workcategory:5p;install3newkitchensinks. Replacefixturesinmensandwomensbathrooms. Allworkonfloor2. ![]() Permit status: Complete | Expiration date: August 6, 2012 | Permit id: Pw20120806685 | |||||
Workcategory:4pb;relocate30headson1stfloor #1033363 ![]() Permit status: Complete | Expiration date: December 7, 2010 | Permit id: Pw20101207919 | |||||
Workcategory:5p;install2newkitchensinks ![]() Permit status: Expired | Expiration date: November 26, 2010 | Permit id: Pw20101126755 | |||||
The installation of 96 workstations with electrical components Permit status: Complete | Permit id: Ew201604267742 | |||||
New lighting and lighting control in open office area. New fire alarm Permit status: Complete | Permit id: Ew201605047915 | |||||
Provided 1 volt power for 2 fire alarm power supplies Permit status: Complete | Permit id: Ew20141013561 | |||||
224 receptacles install (112) cubicles workstations Permit status: Complete | Permit id: E200809191455 | |||||
Demo and install electrical devices on ground floor lights. Permit status: Complete | Permit id: E200904068444 | |||||
Communication cabling services Permit status: Issued | Permit id: Ew201606018469 | |||||
Pivot interiors to intall 28 resolve stations with 9 basefeeds and 35 receptacles Permit status: Complete | Permit id: Ew20101222121 | |||||
Install (225) data cables. Permit status: Expired | Permit id: Ew20120410541 | |||||
Access control Permit status: Filed | Permit id: Ew20151021481 | |||||
Access control Permit status: Filed | Permit id: Ew20151021482 | |||||
Elec. And life safety - job #33044 Permit status: Complete | Permit id: Ew20120806781 | |||||
Install of 121 category 6 cables Permit status: Complete | Permit id: Ew20101223301 | |||||
Install (85) data cables Permit status: Complete | Permit id: Ew20120914664 | |||||
Access control Permit status: Filed | Permit id: Ew20151021461 | |||||
Elec work - job #33000 Permit status: Complete | Permit id: Ew20120410561 | |||||
Relocate (2) existing lights and install (4) new led garage lights and (3) strip lights Permit status: Expired | Permit id: Ew20131216101 | |||||
Modular office furniture; (49) workstations chris varley 510-719-8533 Permit status: Complete | Permit id: Ew20120504961 | |||||
Install 3-6 kva ups 6lc secondary distribution Permit status: Complete | Permit id: E200902046349 | |||||
80+ fixtures switches outlets Permit status: Complete | Permit id: Ew20101122382 | |||||
Install 12 plugs on existing circuits. Run conduit mount boxes. Permit status: Complete | Permit id: Ew20110819126 | |||||
Install new smoke detectors horn strobes re-use existing conduits as neccessary. Permit status: Complete | Permit id: E200812154766 | |||||
1 carbon monoxide controller transducers and 1 horn garage Permit status: Complete | Permit id: E20030729954 | |||||
Additional per collin wing Permit status: Complete | Permit id: Ew20110110542 | |||||
Install wiremold on floor for new desks and some wiremold on wall. Install one light fixture and 5 wall plugs. Permit status: Complete | Permit id: Ew20120106161 | |||||
Slioc (9)lights (6)switches (6)receptacles life safety add (2)strobes [scope of work does not include residential electric space heater installation.] Permit status: Complete | Permit id: Ew20080827801 | |||||
Safe off and reconnect 9 heat pumps Permit status: Filed | Permit id: Ew201612162441 | |||||
Permit to operate boiler ![]() Permit status: Issued | Expiration date: October 12, 2017 | Permit id: 97660 | |||||
Floor 2 & 3 - (1) new horn strobe and 2 new smoke det w 2 new control modules have been added to re-establish 2 communicating opening between adjacent bldg (301 brannan & 634 2nd st). Ref pa 2017-0113-7153 - see ab-010. Fire alarm permit for 634 second to be filed separately. ![]() ![]() Permit type: Otc alterations permit | Completion date: March 27, 2017 | Expiration date: February 3, 2017 | Current use: Office | Permit id: 201702038601 | |||||
Revision to fire alarm permit 201702038601. Per fire and electrical inspector comment for adding 4 smoke detectors and 2 control modules to supervise magnetic door holders on 301 brannan side of communicating bridge on floors 2 and 3. N a for maher. Ref app#201701137153 (ab-010) ![]() ![]() Permit type: Otc alterations permit | Expiration date: March 15, 2017 | Current use: Office | Permit id: 201703151532 | |||||
Removal on non-structural interior partitions, ceiling. ![]() ![]() Permit type: Additions alterations or repairs | Completion date: October 4, 1989 | Expiration date: October 25, 1988 | Current use: Office | Permit id: 8816099 | |||||
Install new access toilet rms, seismic bracing, elevator ![]() ![]() Permit type: Additions alterations or repairs | Completion date: April 24, 1990 | Expiration date: January 25, 1989 | Current use: Office | Permit id: 8901223 | |||||
Modified work to application number 8901223, new elevator ![]() ![]() Permit type: Additions alterations or repairs | Completion date: February 9, 1990 | Expiration date: August 23, 1989 | Current use: Office | Permit id: 8915385 | |||||
Expansion of elect. Systems, lighting nd power. ![]() ![]() Permit type: Additions alterations or repairs | Expiration date: April 30, 1991 | Current use: Office | Permit id: 9107355 | |||||
Remove non-structural partitions, ceiling and finishes ![]() ![]() Permit type: Additions alterations or repairs | Completion date: September 8, 1994 | Expiration date: March 9, 1994 | Current use: Office | Permit id: 9403713 | |||||
Tenant improvement to the ground floor, including bathrooms ![]() ![]() Permit type: Additions alterations or repairs | Expiration date: March 11, 1994 | Current use: Office | Permit id: 9403853 | |||||
Ti, sprinklers on ground floor,h c compl#9403853,9404179 ![]() ![]() Permit type: Otc alterations permit | Expiration date: March 22, 1994 | Current use: Office | Permit id: 9404589 | |||||
Renew app, #9403853 ![]() ![]() Permit type: Otc alterations permit | Completion date: February 5, 1996 | Expiration date: January 12, 1996 | Current use: Office | Permit id: 9600630 | |||||
Removal of asphalt paving & concrete at brannan & 2nd sts ![]() ![]() Permit type: Additions alterations or repairs | Expiration date: November 13, 1996 | Current use: Office | Permit id: 9622098 | |||||
Soft demo & clean-up only, no structural work ![]() ![]() Permit type: Otc alterations permit | Expiration date: August 22, 1997 | Current use: Office | Permit id: 9716221 | |||||
Minor revision to #9710806,change foundatn of partitn walls ![]() ![]() Permit type: Otc alterations permit | Expiration date: November 4, 1997 | Current use: Office | Permit id: 9722277 | |||||
Relocate fire alarm, revision to appl #9710806 ![]() ![]() Permit type: Additions alterations or repairs | Expiration date: November 4, 1997 | Current use: Office | Permit id: 9722282 | |||||
Slope sidewalk for accessibility (ref. 9710806) ![]() ![]() Permit type: Additions alterations or repairs | Expiration date: November 13, 1997 | Current use: Office | Permit id: 9722930 | |||||
Revision to #9718583, sprinklers ![]() ![]() Permit type: Otc alterations permit | Expiration date: November 24, 1997 | Current use: Office | Permit id: 9723706 | |||||
Renew:9716221, 9723603,09710806, 9722277 ![]() ![]() Permit type: Otc alterations permit | Expiration date: February 11, 2000 | Current use: Office | Permit id: 200002111689 | |||||
Renew: 9718583, 9720389, 9723706, 9722282 for final only ![]() ![]() Permit type: Otc alterations permit | Expiration date: February 11, 2000 | Current use: Office | Permit id: 200002111692 | |||||
1 f, 2 f, 6 f- remove and replace water source heat pumps with new like for like units. N a ordinance #155-13 ![]() ![]() Permit type: Otc alterations permit | Completion date: September 13, 2017 | Expiration date: November 2, 2016 | Current use: Office | Permit id: 201611021696 | |||||
1 f 2 f 6 f- replace heat pump with like for like on 1 f, 2 f & 6 f. 1 f: no new fire alarm devices, (e) duct detector. 2 f: 6 new duct detectors with control shut down relay & add remote ann. 6 f: 2 new duct detectors with control shutdown relay and add remote ann. N a maher ![]() ![]() Permit type: Otc alterations permit | Completion date: September 5, 2017 | Expiration date: April 4, 2017 | Current use: Office | Permit id: 201704043078 | |||||
Demo existing wshp units & replace with new like units on 3rd, 4th 5th floors. N a for maher. ![]() ![]() Permit type: Otc alterations permit | Completion date: September 13, 2017 | Expiration date: May 9, 2017 | Current use: Office | Permit id: 201705096032 | |||||
3rd,4th, & 5th floor: as part of heat pump replacement project. 6 new duct detectors with remote led annunciators are being added to extg notifier. Nfs2-640. Ref app#201705096032. N a for maher ![]() ![]() Permit type: Otc alterations permit | Completion date: September 5, 2017 | Expiration date: May 26, 2017 | Current use: Office | Permit id: 201705267771 | |||||
Demolition of non-structural partitions, doors, ceiling, lighting and finishes. Construction of new non structural partitions, doors, ceilings, lighting and finishes. N a for maher. ![]() ![]() Permit type: Otc alterations permit | Expiration date: June 28, 2017 | Current use: Office | Permit id: 201706280561 | |||||
3rd,4th,5th & 6th floors:demolition of non-structural partitions, doors, ceiling, lighting and finishes. Construction of new non structural partitions, doors, ceilings, lighting and finishes. N a for maher. ![]() ![]() Permit type: Otc alterations permit | Expiration date: June 28, 2017 | Current use: Office | Permit id: 201706280567 | |||||
1st floor:adding to extg nfs2-640, 1 horn strobe, 1 smoke detector, and 1 control module, 1 extg horn strobe is being relocated. N a for maher. Bldg ref app#201706280561 ![]() ![]() Permit type: Otc alterations permit | Completion date: November 21, 2017 | Expiration date: August 3, 2017 | Current use: Office | Permit id: 201708033742 | |||||
Replace existing generator on roof to accomodate it equipment load and connect fuel oil line to existing life safety generator ![]() ![]() Permit type: Additions alterations or repairs | Expiration date: August 9, 2017 | Current use: Office | Permit id: 201708094309 | |||||
G f, 3 f to 6 f- fire sprinkler t. I. Relocate 16 heads & add 11 heads. Total 27 heads. N a ordinance #155-13 t. I. Pa#201706280567 ![]() ![]() Permit type: Otc alterations permit | Completion date: October 31, 2017 | Expiration date: August 31, 2017 | Current use: Office | Permit id: 201708316510 | |||||
Subsidewalk basement roof repair to install traffic signal pole foundation and installation of new pedestrian light pole. Maher na ![]() ![]() Permit type: Otc alterations permit | Expiration date: September 29, 2017 | Current use: Office | Permit id: 201709299951 | |||||
2 f lobby- selective demo of non-structural partitions, doors, ceilings, lights & finishes. New construction of non structural partitions, doors, ceiling, light fixtures and finishes. Ada improvements in rr 2nd floor. N a ordinance #155-13 ![]() ![]() Permit type: Otc alterations permit | Expiration date: October 16, 2017 | Current use: Office | Permit id: 201710161330 | |||||
Fire sprinkler tenant improvement relocate 1, add, 1. Ref 201706280567 ![]() ![]() Permit type: Otc alterations permit | Expiration date: November 1, 2017 | Current use: Office | Permit id: 201711012869 | |||||
2nd fl: revision to pa #2017101613 to remove card reader from scope of work. Maher na ![]() ![]() Permit type: Otc alterations permit | Expiration date: December 1, 2017 | Current use: Office | Permit id: 201712015324 | |||||
3rd-6th fl: revision to pa #201706280567 to remove card readers from scope of work. Maher na ![]() ![]() Permit type: Otc alterations permit | Expiration date: December 1, 2017 | Current use: Office | Permit id: 201712015326 | |||||
2nd floor - relocation of t-24 lighting fixtures in existing tenant space . Ref pa #2017101613 for ti work. N a maher ordinance ![]() ![]() Permit type: Otc alterations permit | Expiration date: December 12, 2017 | Current use: Office | Permit id: 201712126285 | |||||
4th floor-full floor t. I. Construct new doors, walls and partitions. Demo done under previous permit. Mechanical, electrical, sprinklers and life safety to be done under seperate permits ![]() ![]() Permit type: Otc alterations permit | Completion date: February 11, 2009 | Expiration date: August 8, 2008 | Current use: Office | Permit id: 200808088720 | |||||
Remove convenience stair and slab infill for existing cut out to fill open space between 3rd and 4th floors. Refer to 200808087 for all arch, path of travel, and disabled access. ![]() ![]() Permit type: Otc alterations permit | Completion date: February 11, 2009 | Expiration date: August 26, 2008 | Current use: Office | Permit id: 200808260054 | |||||
4th floor-upgrade of fire alarm system on the 4th floor. Installing duct detectors, 6 smoke detectors, 13 horn strobes and 5 strobes. ![]() ![]() Permit type: Otc alterations permit | Completion date: February 12, 2009 | Expiration date: September 16, 2008 | Current use: Office | Permit id: 200809161703 | |||||
Refer t. I. Pa# 2008 08 08 8720. Electrical lighting & power systems for ti to add & relocate fixtures, outlets, and tenant equipment. ![]() ![]() Permit type: Otc alterations permit | Completion date: February 12, 2009 | Expiration date: September 23, 2008 | Current use: Office | Permit id: 200809232393 | |||||
4th floor-tenant improvements to the (e) wet & pre-action fire sprinkler systems-73 relocates (loweved), 1 new ![]() ![]() Permit type: Otc alterations permit | Completion date: February 12, 2009 | Expiration date: September 23, 2008 | Current use: Office | Permit id: 200809232416 | |||||
Relcoate 3 (e) down-light from elevator lobby, install 2 exterior downlight and 2 wall sconce at main entrance, furnish & install wall washers, fixtures for elevator and entry lobbies. ![]() ![]() Permit type: Otc alterations permit | Completion date: June 4, 2009 | Expiration date: April 16, 2009 | Current use: Office | Permit id: 200904166469 | |||||
1st floor interior remodel, remove (e) partitions, replace with new partitions, new flooring. ![]() ![]() Permit type: Otc alterations permit | Expiration date: September 15, 2010 | Current use: Office | Permit id: 201009150892 | |||||
1st floor ti work. Relocate 4 heat pumps and install 1 new server room, ac unit, arch pa #201009150892. ![]() ![]() Permit type: Otc alterations permit | Completion date: February 2, 2011 | Expiration date: December 3, 2010 | Current use: Office | Permit id: 201012036056 | |||||
1st floor - electrical work, reference pa #201009150892. ![]() ![]() Permit type: Otc alterations permit | Expiration date: December 14, 2010 | Current use: Office | Permit id: 201012146659 | |||||
Fire alarm addition of smoke detector, 7 duct detector, 12 h s and 1 horn due to tenant improvement on the 1st floor. Remove 1 pull station ![]() ![]() Permit type: Otc alterations permit | Completion date: March 10, 2011 | Expiration date: December 20, 2010 | Current use: Office | Permit id: 201012206989 | |||||
2nd floor existing fire sprinkler system tenant improvements - 19 relocated sprinklers, 6 added sprinklers, 1 removed sprinklers. ![]() ![]() Permit type: Otc alterations permit | Completion date: August 31, 2012 | Expiration date: May 24, 2012 | Current use: Office | Permit id: 201205241182 | |||||
Tenant improvements, new drywall, doors, millwork, hvac, lighting & plumbing. ![]() ![]() Permit type: Otc alterations permit | Completion date: February 11, 2013 | Expiration date: July 10, 2012 | Current use: Office | Permit id: 201207104412 | |||||
Add 1 smoke detector, 1 relay, 1 control module, 15 horn strobes and 1 strobe. Replace 1 existing power supply, 1 horn strobe, 2 strobes on the 2nd fl ![]() ![]() Permit type: Otc alterations permit | Completion date: January 28, 2013 | Expiration date: August 6, 2012 | Current use: Office | Permit id: 201208066617 | |||||
Add 2 power supplies, 2 control modules, 2 relays and 1 module transponder to the extg fire alarm system. There is no bldg permit associated with this work. N a for the maher ordinance #155-13 ![]() ![]() Permit type: Otc alterations permit | Completion date: November 12, 2014 | Expiration date: July 16, 2014 | Current use: Office | Permit id: 201407161385 | |||||
T-mobile proposes to install a new wireless site. The scope of works will include: install 9 new antennas, 3 new rrus, 1 mucrowave antenna. Extend existing mechanical wall vertically. ![]() ![]() Permit type: Additions alterations or repairs | Expiration date: September 21, 2015 | Current use: Office | Permit id: 201509217569 | |||||
Demo (e) field built desking system including pole supported lighting fixtures & replace w new modular furniture system & new lighting (led) provided as a deffered subbmittal, work also includes minor in-fill of interior openings. Maher na ![]() ![]() Permit type: Otc alterations permit | Expiration date: March 25, 2016 | Current use: Office | Permit id: 201603253107 | |||||
Electrical work for ti, ref pa 2016-0325-3107 ![]() ![]() Permit type: Otc alterations permit | Expiration date: April 7, 2016 | Current use: Office | Permit id: 201604074204 | |||||
5th floor: fire alarm, add(6) new horn strobes & (9) mew strobes & replace (11) existing horn strobes & (3) existing strobes. Ref bldg. #2016-0325-3107. ![]() ![]() Permit type: Otc alterations permit | Expiration date: May 25, 2016 | Current use: Office | Permit id: 201605258276 | |||||
Level 2-6 (2,354 sq ft) elevator lobby renovation changes and or additions to the electrical distribution equipment, branch circuit wiring, devices, lighting fixtures, building fire alarm system, security, and mechanical plumbing equipment. ![]() Permit status: Complete | Completion date: November 20, 2017 | Permit id: Ew201707276952 | |||||
Level 1 (2,354 sq ft) lobby renovation changes and or additions to the electrical distribution equipment, branch circuit wiring, devices, lighting fixtures, building fire alarm system, security, and mechanical plumbing equipment. ![]() Permit status: Complete | Completion date: November 22, 2017 | Permit id: Ew201707276951 | |||||
Install 3-6 kva ups, 6lc secondary distribution ![]() Permit status: Complete | Completion date: April 6, 2009 | Permit id: E200902046349 | |||||
Install (85) data cables ![]() Permit status: Complete | Completion date: September 18, 2013 | Permit id: Ew20120914664 | |||||
80+ fixtures, switches, outlets, ![]() Permit status: Complete | Completion date: January 12, 2011 | Permit id: Ew20101122382 | |||||
The installation of 96 workstations with electrical components ![]() Permit status: Complete | Completion date: June 13, 2016 | Permit id: Ew201604267742 | |||||
Install (225) data cables. ![]() Permit status: Expired | Permit id: Ew20120410541 | |||||
Install wiremold on floor for new desks, and some wiremold on wall. Install one light fixtureand 5 wall plugs. ![]() Permit status: Complete | Completion date: January 31, 2012 | Permit id: Ew20120106161 | |||||
Install 8 duct detectors on existing heat pumps on multiple floors ![]() Permit status: Issued | Permit id: Ew201704064673 | |||||
New lighting and lighting control in open office area. New fire alarm ![]() Permit status: Complete | Completion date: June 3, 2016 | Permit id: Ew201605047915 | |||||
Relocate (2) existing lights and install (4) new led garage lights and (3) strip lights ![]() Permit status: Expired | Permit id: Ew20131216101 | |||||
Elec. And life safety - job #33044 ![]() Permit status: Complete | Completion date: October 26, 2012 | Permit id: Ew20120806781 | |||||
1 carbon monoxide controller, transducers and 1 horn , garage ![]() Permit status: Complete | Completion date: August 21, 2003 | Permit id: E20030729954 | |||||
Pivot interiors to intall 28 resolve stations with 9 basefeeds and 35 receptacles ![]() Permit status: Complete | Completion date: January 12, 2011 | Permit id: Ew20101222121 | |||||
Additional per collin wing ![]() Permit status: Complete | Completion date: January 12, 2011 | Permit id: Ew20110110542 | |||||
Provided 1 volt power for 2 fire alarm power supplies ![]() Permit status: Complete | Completion date: October 22, 2014 | Permit id: Ew20141013561 | |||||
Demo and install electrical devices on ground floor, lights. ![]() Permit status: Complete | Completion date: June 1, 2009 | Permit id: E200904068444 | |||||
Elec work - job #33000 ![]() Permit status: Complete | Completion date: May 8, 2012 | Permit id: Ew20120410561 | |||||
Install of 121 category 6 cables ![]() Permit status: Complete | Completion date: January 12, 2011 | Permit id: Ew20101223301 | |||||
Access control ![]() Permit status: Expired | Permit id: Ew20151021481 | |||||
224 receptacles, install (112) cubicles workstations ![]() Permit status: Complete | Completion date: September 26, 2008 | Permit id: E200809191455 | |||||
Safe off and reconnect 9 heat pumps ![]() Permit status: Issued | Permit id: Ew201612162441 | |||||
Install 12 plugs on existing circuits. Run conduit, mount boxes. ![]() Permit status: Complete | Completion date: September 2, 2011 | Permit id: Ew20110819126 | |||||
Slioc (9)lights (6)switches (6)receptacles life safety add (2)strobes [scope of work does not include residential electric space heater installation.] ![]() Permit status: Complete | Completion date: January 7, 2009 | Permit id: Ew20080827801 | |||||
Re-feed heat pumps for new units. Install duct smoke detectors on all units ![]() Permit status: Complete | Completion date: August 21, 2017 | Permit id: Ew201708037096 | |||||
Communication cabling services ![]() Permit status: Issued | Permit id: Ew201606018469 | |||||
Modular office furniture; (49) workstationschris varley 510-719-8533 ![]() Permit status: Complete | Completion date: July 27, 2012 | Permit id: Ew20120504961 | |||||
Install new smoke detectors, horn strobes, re-use existing conduits as neccessary. ![]() Permit status: Complete | Completion date: February 7, 2009 | Permit id: E200812154766 | |||||
Work category: 5p; install 2 new kitchen sinks ![]() Permit status: Expired | Expiration date: November 26, 2010 | Permit id: Pw20101126755 | |||||
Work category: 4pb; relocate existing sprinkler heads and add to accommodate new layout. Stumbleupon 2nd floor. Ar&b # 12-093 ![]() Permit status: Complete | Completion date: August 29, 2012 | Expiration date: June 5, 2012 | Permit id: Pw20120605457 | |||||
Ground floor: ti work relocate (4) hps and install (1) new service room - ac unit ![]() Permit status: Complete | Completion date: December 30, 2010 | Expiration date: December 2, 2010 | Permit id: Pp20101202502 | |||||
Work category: 4pb; jc4567 - fire sprinkler ti ![]() Permit status: Issued | Expiration date: October 31, 2017 | Permit id: Pw20171031016 | |||||
Work category: 5p; one single toilet room, tenant sink and condenser water lines to one heat pump. Work on the ground floor. ![]() Permit status: Complete | Completion date: November 3, 2017 | Expiration date: September 8, 2017 | Permit id: Pw20170908807 | |||||
Ada bathroom & kitchen remodel. ![]() Permit status: Complete | Completion date: September 26, 2008 | Expiration date: September 5, 2008 | Permit id: Pp20080905337 | |||||
Work category: 4pb; relocate heads on 1st floor, #1033363 ![]() Permit status: Complete | Completion date: December 23, 2010 | Expiration date: December 7, 2010 | Permit id: Pw20101207919 | |||||
Fire sprinkler tenant improvement @ 4th floor - slide space - ar&b #11903. ![]() Permit status: Complete | Completion date: September 26, 2008 | Expiration date: September 25, 2008 | Permit id: Pp20080925195 | |||||
Work category: 5p; install 3 new kitchen sinks. Replace fixtures in mens and womens bathrooms. All work on floor 2. ![]() Permit status: Complete | Completion date: January 18, 2013 | Expiration date: August 6, 2012 | Permit id: Pw20120806685 | |||||
Work category: 4pb; jc4567 - fire sprinkler ti. ![]() Permit status: Complete | Completion date: September 20, 2017 | Expiration date: August 21, 2017 | Permit id: Pw20170821326 | |||||
SCORE 98 Demo (e) field built desking system including pole supported lighting fixtures & replace w/new modular furniture system & new lighting (led) provided as a deffered subbmittal work also includes minor in-fill of interior openings. Maher na Permit type: Building permit | Expiration date: April 7, 2017 | Current use: Office | Permit id: #201603253107 | |||||
SCORE 95 Install 8 duct detectors on existing heat pumps on multiple floors ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew201704064673 | |||||
SCORE 100 1 f 2 f 6 f- replace heat pump with like for like on 1 f 2 f & 6 f. 1 f: no new fire alarm devices (e) duct detector. 2 f: 6 new duct detectors with control shut down relay & add remote ann. 6 f: 2 new duct detectors with control shutdown relay and add remote ann. N a maher Permit type: Building permit | Expiration date: October 4, 2017 | Current use: Office | Permit id: #201704043078 | |||||
SCORE 100 Add 1 smoke detector 1 relay 1 control module 15 horn strobes and 1 strobe. Replace 1 existing power supply 1 horn/strobe 2 strobes on the 2nd fl Permit type: Building permit | Expiration date: February 6, 2013 | Current use: Office | Permit id: #201208066617 | |||||
SCORE 95 Re-feed heat pumps for new units. Install duct smoke detectors on all units ![]() ![]() Permit type: Electrical permit | Permit status: Complete | Permit id: Ew201708037096 | |||||
SCORE 100 1st floor:adding to extg nfs2-6 1 horn strobe 1 smoke detector and 1 control module 1 extg horn strobe is being relocated. N a for maher. Bldg ref app#201706280561 Permit type: Building permit | Expiration date: February 3, 2018 | Current use: Office | Permit id: #201708033742 | |||||
SCORE 100 Replace existing generator on roof to accomodate it equipment load and connect fuel oil line to existing life safety generator ![]() ![]() Permit type: Building permit | Current use: Office | Permit id: #201708094309 | |||||
SCORE 100 G f 3 f to 6 f- fire sprinkler t. I. Relocate 16 heads & add 11 heads. Total 27 heads. N a ordinance #155-13 t. I. Pa#201706280567 Permit type: Building permit | Expiration date: February 28, 2018 | Current use: Office | Permit id: #201708316510 | |||||
SCORE 100 Work category: 4pb; jc4567 - fire sprinkler ti. ![]() ![]() Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20170821326 | |||||
SCORE 100 Fire alarm addition of smoke detector 7 duct detector 12 h/s and 1 horn due to tenant improvement on the 1st floor. Remove 1 pull station Permit type: Building permit | Expiration date: June 20, 2011 | Current use: Office | Permit id: #201012206989 | |||||
SCORE 95 Safe off and reconnect 9 heat pumps ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew201612162441 | |||||
SCORE 100 2nd fl: revision to pa #2017101613 to remove card reader from scope of work. Maher na Permit type: Building permit | Expiration date: April 1, 2018 | Current use: Office | Permit id: #201712015324 | |||||
SCORE 100 3rd-6th fl: revision to pa #201706280567 to remove card readers from scope of work. Maher na Permit type: Building permit | Expiration date: April 1, 2018 | Current use: Office | Permit id: #201712015326 | |||||
SCORE 100 2nd floor - relocation of t-24 lighting fixtures in existing tenant space . Ref pa #2017101613 for ti work. N a maher ordinance Permit type: Building permit | Expiration date: June 13, 2018 | Current use: Office | Permit id: #201712126285 | |||||
SCORE 100 Floor 2 & 3 - (1) new horn strobe and 2 new smoke det w 2 new control modules have been added to re-establish 2 communicating opening between adjacent bldg (301 brannan & 634 2nd st). Ref pa 2017-0113-7153 - see ab-010. Fire alarm permit for 634 second to be filed separately. Permit type: Building permit | Expiration date: August 3, 2017 | Current use: Office | Permit id: #201702038601 | |||||
SCORE 95 Level 1 (2 354 sq ft) lobby renovation changes and or additions to the electrical distribution equipment branch circuit wiring devices lighting fixtures building fire alarm system security and mechanical plumbing equipment. ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew201707276951 | |||||
SCORE 95 Level 2-6 (2 354 sq ft) elevator lobby renovation changes and or additions to the electrical distribution equipment branch circuit wiring devices lighting fixtures building fire alarm system security and mechanical plumbing equipment. ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew201707276952 | |||||
SCORE 100 Demolition of non-structural partitions doors ceiling lighting and finishes. Construction of new non structural partitions doors ceilings lighting and finishes. N a for maher. Permit type: Building permit | Expiration date: July 4, 2020 | Current use: Office | Permit id: #201706280561 | |||||
SCORE 100 3rd 4th 5th & 6th floors:demolition of non-structural partitions doors ceiling lighting and finishes. Construction of new non structural partitions doors ceilings lighting and finishes. N a for maher. Permit type: Building permit | Expiration date: July 4, 2020 | Current use: Office | Permit id: #201706280567 | |||||
Demolition of non-structural partitions doors ceiling lighting and finishes. Construction of new non structural partitions doors ceilings lighting and finishes. N a for maher. ![]() ![]() Permit type: Building permit | Current use: Office | Permit id: #201706280561 | |||||
3rd 4th 5th & 6th floors:demolition of non-structural partitions doors ceiling lighting and finishes. Construction of new non structural partitions doors ceilings lighting and finishes. N a for maher. ![]() ![]() Permit type: Building permit | Current use: Office | Permit id: #201706280567 | |||||
SCORE 100 Revision to fire alarm permit 201702038601. Per fire and electrical inspector comment for adding 4 smoke detectors and 2 control modules to supervise magnetic door holders on 301 brannan side of communicating bridge on floors 2 and 3. N a for maher. Ref app#201701137153 (ab-010) Permit type: Building permit | Expiration date: July 16, 2017 | Current use: Office | Permit id: #201703151532 | |||||
SCORE 99 Basement/1st/2nd/3rd/4th/5th/6th floors-install evacuation plaques (21 signs) Permit type: Building permit | Expiration date: November 2, 2013 | Current use: Office | Permit id: #201305025989 | |||||
SCORE 100 5th floor: fire alarm add(6) new horn/strobes & (9) mew strobes & replace (11) existing horn/strobes & (3) existing strobes. Ref bldg. #2016-0325-3107. Permit type: Building permit | Expiration date: November 25, 2016 | Current use: Office | Permit id: #201605258276 | |||||
SCORE 100 Demo existing wshp units & replace with new like units on 3rd 4th 5th floors. N a for maher. Permit type: Building permit | Expiration date: May 17, 2018 | Current use: Office | Permit id: #201705096032 | |||||
SCORE 100 3rd 4th & 5th floor: as part of heat pump replacement project. 6 new duct detectors with remote led annunciators are being added to extg notifier. Nfs2-640. Ref app#201705096032. N a for maher Permit type: Building permit | Expiration date: November 26, 2017 | Current use: Office | Permit id: #201705267771 | |||||
SCORE 100 Fire sprinkler tenant improvement relocate 1 add 1. Ref 201706280567 Permit type: Building permit | Expiration date: March 1, 2018 | Current use: Office | Permit id: #201711012869 | |||||
SCORE 100 2 f lobby- selective demo of non-structural partitions doors ceilings lights & finishes. New construction of non structural partitions doors ceiling light fixtures and finishes. Ada improvements in rr 2nd floor. N a ordinance #155-13 Permit type: Building permit | Expiration date: April 17, 2018 | Current use: Office | Permit id: #201710161330 | |||||
Subsidewalk basement roof repair to install traffic signal pole foundation and installation of new pedestrian light pole. Maher na ![]() Permit type: Building permit | Current use: Office | Permit id: #201709299951 | |||||
SCORE 100 Work category: 5p; one single toilet room tenant sink and condenser water lines to one heat pump. Work on the ground floor. ![]() ![]() Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20170908807 |