Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 Gop water heater permit Date: November 4, 2015 Contractor: Tom Eyman Permit type: Residential plumbing | Permit status: Issued | Permit id: Plb-15-07389 | |||||
SCORE 95 Commercial electrical Date: August 10, 2011 Contractor: Kevin Lytle Permit status: Issued | Permit id: Elc-11-06559 | |||||
SCORE 95 Greater omaha packing switchgear relocation Date: August 10, 2011 Contractor: Kevin Lytle Permit type: Commercial electrical | Permit status: Issued | Permit id: Elc-11-06560 | |||||
SCORE 89 Greater omaha packing-expansion of existing dry system to serve new processing cooler Date: March 15, 2016 Contractor: Bill Reineke Permit type: Fire sprinkler/chemical/control systems | Permit status: Issued | Permit id: Mec-16-00872 | |||||
1014 sq ft addition to boiler room; additional plans submitted 5/23/11 taken to greg Date: June 23, 2011 Value: $51,714 Permit type: Permits/building/commercial/addition | Permit status: Issued | Permit id: Bld-11-02660 | |||||
Greater omaha packing company/22009 sq ft industrial, 7144 sq ft office addition Date: August 16, 2011 Value: $1,736,843 Permit type: Permits/building/commercial/addition | Permit status: Issued | Permit id: Bld-11-05059 | |||||
SCORE 89 Power outage required for the addition of shunt trip circuit breakers to the main electrical service to the building Date: March 16, 2015 Contractor: Mark Pechar Permit type: Commercial electrical | Permit status: Issued | Permit id: Elc-15-02085 | |||||
SCORE 89 Commercial electrical Date: December 18, 2015 Contractor: Mark Pechar Permit status: Issued | Permit id: Elc-15-11165 | |||||
Date: July 2, 2007 Permit status: Issued | Permit id: Mec-07-14288 | |||||
SCORE 89 Outage for repair of 30 amp service switch. Date: May 8, 2015 Contractor: Mark Pechar Permit type: Commercial electrical | Permit status: Issued | Permit id: Elc-15-03657 | |||||
SCORE 89 Oppd outage to change out fuses in kill floor mains mdp4 and mdp5switching fuses out from 30 to 20 amp to lower arc flash calculation per ses engineering. Date: July 30, 2015 Contractor: Mark Pechar Permit type: Commercial electrical | Permit status: Issued | Permit id: Elc-15-06668 | |||||
SCORE 93 Greater omaha packing-(refrigeration & ammonia) repipe condenser liquid dreins, replace low temp suction line on roof Date: January 21, 2015 Contractor: Bernard Mcneil Permit type: Regrigeration/walk-in coolers and freezers | Permit status: Issued | Permit id: Mec-15-00506 | |||||
Changing out 30 amp bolted pressure switch with new switch. Same kind and brand. Work will be performed by square d representatives. Date: December 30, 2015 Permit type: Commercial electrical | Permit status: Issued | Permit id: Elc-15-11515 | |||||
SCORE 100 New beef room waste piping Date: February 9, 2016 Contractor: Tim Shurts Permit type: Commercial plumbing | Permit status: Issued | Permit id: Plb-16-00598 | |||||
SCORE 93 Hydronic/process/ammonia piping systems Date: January 27, 2012 Contractor: Bernard Mcneil Permit status: Issued | Permit id: Mec-12-00738 | |||||
SCORE 100 Progresive protein Permit type: Permits/mechanical/commercial/pressure vessel | Permit status: Issued | Permit id: Mec-08-05870 | |||||
SCORE 94 Date: July 27, 2007 Contractor: Jon Mislivec Permit status: Issued | Permit id: Elc-07-15030 | |||||
SCORE 100 Commercial plumbing Date: July 14, 2011 Contractor: Tim Shurts Permit status: Issued | Permit id: Plb-11-03681 | |||||
Great omaha packing - addition only Date: December 22, 2011 Permit type: Permits/building/miscellaneous/certificate of occupancy | Permit status: Closed | Permit id: Coo-11-00502 | |||||
SCORE 100 Omaha packing Date: April 24, 2012 Contractor: Jeffrey Estabrook Permit type: Commercial plumbing | Permit status: Issued | Permit id: Plb-12-02454 | |||||
SCORE 93 Commercial install Date: September 28, 2011 Contractor: Bernard Mcneil Permit status: Issued | Permit id: Mec-11-07374 | |||||
SCORE 94 Permits/electrical/commercial/electrical Date: August 5, 2010 Contractor: Jon Mislivec Permit status: Issued | Permit id: Elc-10-05615 | |||||
SCORE 95 Hydronic/process/ammonia piping systems Date: February 23, 2012 Contractor: John Wilhelmi Permit status: Issued | Permit id: Mec-12-01408 | |||||
Provide feeders and circuitry for operation of grinding equipment Date: April 4, 2016 Permit type: Commercial electrical | Permit status: Issued | Permit id: Elc-16-02611 | |||||
SCORE 100 Temp heat 10 gal propane tank Date: March 7, 2016 Contractor: Jon Thomas Permit type: Combustable gas tank install | Permit status: Issued | Permit id: Mec-16-01491 | |||||
SCORE 95 Install new service and two story addition with office space Date: February 7, 2012 Contractor: Kevin Lytle Permit type: Commercial electrical | Permit status: Issued | Permit id: Elc-12-01024 | |||||
SCORE 100 Omaha packing co Date: July 1, 2011 Contractor: Jeffrey Estabrook Permit type: Commercial plumbing | Permit status: Issued | Permit id: Plb-11-03486 | |||||
SCORE 95 Greater omaha packing-2)exhaust fans 150cfm, 3)exhaust fans 450cfm, 1)exhaust fan 1000cfm, 5)exhaust fans 4000cfm, 3)exhaust fans 10000cfm, 2)exhaust fans 25000cfm, 7)exhaust fans 500cfm Permit type: Commercial air conditioning air distribution systems | Permit status: Issued | Permit id: Mec-11-08603 | |||||
SCORE 100 Greater omaha packing Date: October 13, 2011 Contractor: Brad Thompson Permit type: Commercial plumbing | Permit status: Issued | Permit id: Plb-11-05579 | |||||
SCORE 100 Greater omaha packing co-1)350hp superior boiler 150mawp Permit type: Permits/mechanical/commercial/pressure vessel | Permit status: Issued | Permit id: Mec-11-07671 | |||||
SCORE 100 Commercial install Date: October 11, 2011 Contractor: Bruce Rasmussen Permit status: Issued | Permit id: Mec-11-07672 | |||||
SCORE 95 Gop water heater Date: November 4, 2015 Contractor: Tom Eyman Permit type: Commercial plumbing | Permit status: Issued | Permit id: Plb-15-07405 | |||||
SCORE 91 Fire sprinkler/chemical/control systems Date: April 16, 2012 Contractor: Brett Lindell Permit status: Issued | Permit id: Mec-12-01791 | |||||
Providing 25 amp new service and 20 amp feeder Date: April 1, 2016 Permit type: Commercial electrical | Permit status: Issued | Permit id: Elc-16-02542 | |||||
Greater omaha packing co. Date: May 19, 2016 Permit type: Building - certificate of occupancy | Permit status: Closed | Permit id: Coo-16-00223 | |||||
Install owner provided equipment as follows: (1) greenheck ef 47,0 cfm (2) greenheck efs 30,0 cfm ea (1) greenheck supply fan 51 cfm (1) greenheck supply fan 30,0 cfm (1) greenheck mau 64,0 cfm fabricate and install (1) lot of ductwork. Date: June 2, 2016 Permit type: Commercial air conditioning air distribution systems | Permit status: Issued | Permit id: Mec-16-03728 | |||||
SCORE 95 Greater omaha packing-5)lennox rtu(1-5ton, 2-3ton, 2-3. 5ton),2 absolute aire muas 6ton,dairin ductlwess split 1ton, exhaust fans(1-150cfm, 1-450cfm, 1-1000cfm, 5-4000cfm, 3-10000cfm, 2-25000cfm, 7-500cfm) Permit type: Commercial air conditioning air distribution systems | Permit status: Issued | Permit id: Mec-12-01407 | |||||
Greater omaha packing - 7 sf mezzanine (2nd floor interior addn) Date: March 25, 2016 Value: $45,000 Permit type: Plans required - commercial remodel existing space | Permit status: Issued | Permit id: Bld-16-00783 | |||||
Office (packing house) Date: October 25, 2012 Permit type: Permits/building/miscellaneous/certificate of occupancy | Permit status: Closed | Permit id: Coo-12-00472 | |||||
SCORE 89 Commercial install Date: September 13, 2011 Contractor: Garrett Friesen Permit status: Issued | Permit id: Mec-11-06160 | |||||
SCORE 99 Complete removal of existing roof system. Provide new vapor barrier, adhesive attachment of roof insulation with 1/4" in 12" slope and new fully adhered roof membrane. Permit type: Commercial re-roof | Permit status: Issued | Permit id: Bld-14-12069 | |||||
Date: July 2, 2007 Permit status: Issued | Permit id: Mec-07-14288 | |||||
SCORE 99 Removal of existing adhered white tpo roof, insulation, and sheet metal flashings. Existing roof deck is believed to hollow core or structural concrete slab. New roof system manufactured by carlisle will be applied as follows from the top down. Carlisle 115mil white epdm fleece backed membrane. (60mil white epdm with fleece backing) carlisle secure shield hd cover board. Carlisle eps tapered insulation. Carlisle 725-tr vapor barrier. Existing concrete roof deck. Carlisle 725-tr is adhered to the concrete roof deck. All other layers are adhered in beads of carlisle flexible fast low rise foam adhesive. Voided duplicate permit 11/24/14 br Permit type: Commercial re-roof | Permit status: Issued | Permit id: Bld-14-12067 | |||||
1014 sq ft addition to boiler room; additional plans submitted 5 23 11 taken to greg Date: June 23, 2011 Value: $51,714 Permit type: Permits/building/commercial/addition | Permit status: Issued | Permit id: Bld-11-02660 | |||||
Greater omaha packing company 22009 sq ft industrial, 7144 sq ft office addition Date: August 16, 2011 Value: $1,736,843 Permit type: Permits/building/commercial/addition | Permit status: Issued | Permit id: Bld-11-05059 | |||||
SCORE 63 Greater omaha packing - 4 sf pad/co2 tank Permit type: Plans required - commecial miscellaneous | Permit status: Issued | Permit id: Bld-16-01327 |