Plumbing permit Date: October 17, 2007 Client: Agusta Aviation Corp | Permit status: Completed | Permit id: 109691 | |||||
Mechanical permit Date: December 21, 2011 Client: Agusta Aviation Corp | Permit status: Completed | Permit id: 373826 | |||||
Plumbing permit Date: May 12, 2009 Client: Agusta Aviation Corp | Permit status: Completed | Permit id: 213915 | |||||
Mechanical permit Date: June 3, 2009 Client: Agusta Aviation Corp | Permit status: Completed | Permit id: 218297 | |||||
Administrative permit Date: September 29, 2010 Client: Agusta Aviation Corp | Permit status: Completed | Permit id: 293665 | |||||
Plumbing permit Date: December 23, 2011 Client: Agusta Aviation Corp | Permit status: Completed | Permit id: 380309 | |||||
Mechanical permit Date: March 17, 2008 Client: Agusta Aviation Corp | Permit status: Completed | Permit id: 134241 | |||||
Administrative permit Date: October 22, 2008 Client: Agusta Aviation Corp | Permit status: Completed | Permit id: 184156 | |||||
Plumbing permit Date: May 6, 2008 Client: Agusta Aviation Corp | Permit status: Completed | Permit id: 150290 | |||||
New construction permit Date: July 27, 2009 Client: Agusta Aviation Corp | Permit status: Completed | Permit id: 224446 | |||||
Electrical permit Date: April 28, 2009 Client: Agusta Aviation Corp | Permit status: Completed | Permit id: 206183 | |||||
Alteration permit Date: September 29, 2009 Client: Agusta Aviation Corp | Permit status: Completed | Permit id: 239288 | |||||
Electrical permit Date: September 20, 2012 Client: Agusta Aviation Corp | Permit status: Completed | Permit id: 426429 | |||||
Alteration permit Date: November 8, 2011 Client: Agusta Aviation Corp | Permit status: Completed | Permit id: 347960 | |||||
Sign permit Date: March 3, 2011 Client: Agusta Aviation Corp | Permit status: Completed | Permit id: 327778 | |||||
Zoning use permit Date: November 4, 2011 Client: Agusta Aviation Corp | Permit status: Completed | Permit id: 365371 | |||||
Electrical permit Date: August 8, 2008 Client: Agusta Aviation Corp | Permit status: Completed | Permit id: 152830 | |||||
Zoning use permit Date: May 23, 2008 Client: Agusta Aviation Corp | Permit status: Completed | Permit id: 152113 | |||||
New construction permit Date: November 28, 2007 Client: Agusta Aviation Corp | Permit status: Completed | Permit id: 93310 | |||||
Fast form building permit Date: September 28, 2007 Client: Agusta Aviation Corp | Permit status: Completed | Permit id: 106069 | |||||
Alteration permit Date: May 28, 2008 Client: Agusta Aviation Corp | Permit status: Completed | Permit id: 153363 | |||||
Zoning use permit Date: December 6, 2012 Client: Agusta Aviation Corp | Permit status: Completed | Permit id: 437028 | |||||
Suppression permit Date: November 12, 2014 Client: Agusta Aviation Corp | Permit status: Completed | Permit id: 568736 | |||||
Administrative permit Date: August 24, 2007 Client: Agusta Aviation Corp | Permit status: Completed | Permit id: 98756 | |||||
Electrical permit Date: September 25, 2007 Client: Agusta Aviation Corp | Permit status: Completed | Permit id: 104471 | |||||
Plumbing permit Date: April 18, 2012 Client: Agusta Aviation Corp | Permit status: Completed | Permit id: 399900 | |||||
Electrical permit Date: December 26, 2014 Client: Agusta Aviation Corp | Permit status: Completed | Permit id: 581732 | |||||
Suppression permit Date: March 23, 2010 Client: Agusta Aviation Corp | Permit status: Completed | Permit id: 262431 | |||||
Suppression permit Date: March 2, 2007 Client: Agusta Aviation Corp | Permit status: Completed | Permit id: 55588 | |||||
Demolition permit Date: May 13, 2009 Client: Agusta Aviation Corp | Permit status: Completed | Permit id: 215444 | |||||
Electrical permit Date: June 16, 2010 Client: Agusta Aviation Corp | Permit status: Completed | Permit id: 278356 | |||||
Suppression permit Date: May 18, 2009 Client: Agusta Aviation Corp | Permit status: Completed | Permit id: 213975 | |||||
Plumbing permit Date: February 16, 2010 Client: Agusta Aviation Corp | Permit status: Completed | Permit id: 260051 | |||||
Addition permit Date: December 13, 2011 Client: Agusta Aviation Corp | Permit status: Completed | Permit id: 372530 | |||||
Electrical permit Date: September 3, 2013 Client: Agusta Aviation Corp | Permit status: Expired | Permit id: 492607 | |||||
Administrative permit Date: July 24, 2012 Client: Agusta Aviation Corp | Permit status: Completed | Permit id: 418156 | |||||
Fast form building permit Date: January 21, 2008 Client: Agusta Aviation Corp | Permit status: Completed | Permit id: 127587 | |||||
Electrical permit Date: October 5, 2011 Client: Agusta Aviation Corp | Permit status: Completed | Permit id: 365043 | |||||
Operations permit Date: November 12, 2010 Client: Agusta Aviation Corp | Permit status: Completed | Permit id: 20797 | |||||
Alteration permit Date: October 14, 2014 Client: Agusta Aviation Corp | Permit status: Completed | Permit id: 565943 | |||||
Mechanical permit Date: October 17, 2007 Client: Agusta Aviation Corp | Permit status: Completed | Permit id: 108293 | |||||
Mechanical permit Date: November 6, 2014 Client: Agusta Aviation Corp | Permit status: Completed | Permit id: 566490 | |||||
Suppression permit Date: August 19, 2008 Client: Agusta Aviation Corp | Permit status: Completed | Permit id: 170078 | |||||
Operations permit Date: February 11, 2008 Client: Agusta Aviation Corp | Permit status: Completed | Permit id: 1788 | |||||
Suppression permit Date: February 27, 2012 Client: Agusta Aviation Corp | Permit status: Completed | Permit id: 388137 | |||||
Mechanical permit Date: February 25, 2010 Client: Agusta Aviation Corp | Permit status: Completed | Permit id: 258788 | |||||
Zoning use permit Date: July 7, 2009 Client: Agusta Aviation Corp | Permit status: Completed | Permit id: 201093 | |||||
Fast form building permit Date: May 1, 2009 Client: Agusta Aviation Corp | Permit status: Completed | Permit id: 213472 | |||||
Permit for the erection of two (2) free-standing accessory signs and erection of a flat wall sign, all accessory to an existing helicopter manufacturing plant with a fuel farm, accessory parking and other uses as previously approved, size and location as shown in application. Date: June 14, 2010 Client: Agusta Aviation Corp | Applicant: Anthony P. Forte, Esquire | Permit type: Appeal | Permit status: Granted | Completion date: July 14, 2010 | Permit id: 11939 | |||||
Fast form building permit Date: September 28, 2007 Client: Agusta Aviation Corp | Permit status: Completed | Completion date: October 16, 2009 | Permit id: 106069 | |||||
SCORE 100 Installation of hvac including ductwork as per plan. Date: October 8, 2008 Contractor: Cms Mechanical Inc Client: Agusta Aviation Corp | Permit type: Mechanical permit | Permit status: Completed | Completion date: January 30, 2009 | Permit id: 177346 | |||||
SCORE 100 Wiring of a new hangar addition & stand alone wash bay out bldg, new light, recepts & panelboards included, in addition, new 13. 2 kv servc will be installed underground to a new hv outdoor lineup as per 2008 nec(east dist) new hangar (helicopter co) Date: February 2, 2012 Contractor: Armour And Sons Electric Inc Client: Agusta Aviation Corp | Permit type: Electrical permit | Permit status: Expired | Completion date: April 27, 2013 | Permit id: 380404 | |||||
SCORE 100 Installation of hvac work system, mechanicals, rtus, piping, as per plans. Date: December 21, 2011 Contractor: Edward B Oreilly And Assoc Inc Client: Agusta Aviation Corp | Permit type: Mechanical permit | Permit status: Completed | Completion date: March 6, 2013 | Permit id: 373826 | |||||
SCORE 100 Replace sink drain(helicopter assembly facility) Date: November 21, 2011 Contractor: Terry Abrams Client: Agusta Aviation Corp | Permit type: Plumbing permit | Permit status: Completed | Completion date: July 5, 2012 | Permit id: 374869 | |||||
SCORE 100 3 wc, 2 urn, 4 lavs, 1 ms, 1 hc lav, 3 fd, 2 trench drains(hanger) Date: December 29, 2011 Contractor: Tandem Associates Inc Client: Agusta Aviation Corp | Permit type: Plumbing permit | Permit status: Completed | Completion date: March 6, 2013 | Permit id: 375509 | |||||
SCORE 100 Replace pvc with copper to correct violation. Utility sink with pump(aviation battery room) Date: December 23, 2011 Contractor: Terry Abrams Client: Agusta Aviation Corp | Permit type: Plumbing permit | Permit status: Completed | Completion date: May 8, 2012 | Permit id: 380309 | |||||
SCORE 99 Install (5) duplex outlets, relocate (3) single pol switches, relocate (2) light fixtures, add (2) light fixtures. In accordance with 2005 nec. Date: February 4, 2008 Contractor: Rcr Electrical Contractor Inc Client: Agusta Aviation Corp | Permit type: Electrical permit | Permit status: Completed | Completion date: December 26, 2008 | Permit id: 130420 | |||||
SCORE 100 Relocate 8 diffusers registers - room 119 Date: February 6, 2008 Contractor: Accord Mechanical And Mgmt Svs Client: Agusta Aviation Corp | Permit type: Mechanical permit | Permit status: Completed | Completion date: February 26, 2008 | Permit id: 130887 | |||||
SCORE 100 Install. Of lt fix, switches, recept, emergency exit lts, 1 amp panel, wiring and connects to mechan. Equip,per 2005 nec. Fire alarm:replace or relocate devices on existing approved fire alarm system (excl main panel),per nfpa-72 (east dist) Date: March 25, 2008 Contractor: R M Electric Co Inc Client: Agusta Aviation Corp | Permit type: Electrical permit | Permit status: Completed | Completion date: June 27, 2008 | Permit id: 132302 | |||||
SCORE 100 For the installation of a hvac system located on the mezzanine level. All work shall comply with the approved plans. Date: March 17, 2008 Contractor: Accord Mechanical And Mgmt Svs Client: Agusta Aviation Corp | Permit type: Mechanical permit | Permit status: Completed | Completion date: May 20, 2008 | Permit id: 134241 | |||||
SCORE 100 Add (1) water closet, lav, kitchen sink & stall shower to existing. Replace water heater. Date: March 12, 2008 Contractor: Tandem Associates Inc Client: Agusta Aviation Corp | Permit type: Plumbing permit | Permit status: Completed | Completion date: December 8, 2008 | Permit id: 137141 | |||||
SCORE 100 Install 99 cat6 cables to equipment room cabinet install 1 - pair telephone cables non plenum rated cable as per 2005 nec (cc dist) Date: April 23, 2008 Contractor: New Line Communications Inc Client: Agusta Aviation Corp | Permit type: Electrical permit | Permit status: Completed | Completion date: September 11, 2009 | Permit id: 139237 | |||||
SCORE 100 Furnish and install: (1)one hose bibb, (1)one floor drain and (1)one duplex sewage ejector Date: May 6, 2008 Contractor: Tandem Associates Inc Client: Agusta Aviation Corp | Permit type: Plumbing permit | Permit status: Completed | Completion date: October 9, 2008 | Permit id: 149537 | |||||
SCORE 100 Install 502 cat 6 cables to 4 telecom rooms. Install pr and 6 strand fiber to 3 telecom rooms, 2 pr and 6 strand fiber to 1 telecom room. Install 24 strand multimode, 12 stand sinlgemode fiber to main bldg install 6 pr cat 3 copper to main bldg. Typical j hook supports (east dist) Date: June 19, 2007 Contractor: New Line Communications Inc Client: Agusta Aviation Corp | Permit type: Electrical permit | Permit status: Completed | Completion date: May 29, 2008 | Permit id: 75959 | |||||
SCORE 96 Conversion of ware house space to offie space. Addition of power and light as needed. Fire alarm relocation (east dist) Date: January 2, 2009 Contractor: Green Power Systems Client: Agusta Aviation Corp | Permit type: Electrical permit | Permit status: Expired | Completion date: January 2, 2009 | Permit id: 178062 | |||||
SCORE 85 Installation of control wiring for transmission test bench as per 2008 nec (east district) Date: December 26, 2014 Contractor: Mckeever Electrical Construc Client: Agusta Aviation Corp | Permit type: Electrical permit | Permit status: Completed | Completion date: April 27, 2015 | Permit id: 581732 | |||||
SCORE 100 New sanitary line from existing on site sanitary line to building, new 3" domestic water line from curb to building. (east district) Date: March 14, 2007 Contractor: John Uebele Jr Client: Agusta Aviation Corp | Permit type: Plumbing permit | Permit status: Completed | Completion date: December 24, 2007 | Permit id: 60208 | |||||
SCORE 100 Install 2 30hp motors, 6 20hp motors, 2 gas fired interlocks for make-up air, 5 7. 5hp stack blower motors, 1 electric door, 3 door switches & 82 light fixture terminations per 2005 nec article 516. Date: June 6, 2008 Contractor: Armour And Sons Electric Inc Client: Agusta Aviation Corp | Permit type: Electrical permit | Permit status: Completed | Completion date: August 28, 2009 | Permit id: 154996 | |||||
SCORE 99 Relocation of components & additional electrical work as per 2005 nec (east dist) Date: August 8, 2008 Contractor: Rcr Electrical Contractor Inc Client: Agusta Aviation Corp | Permit type: Electrical permit | Permit status: Completed | Completion date: June 26, 2009 | Permit id: 164298 | |||||
SCORE 100 New sprinklers and relocation of (4) foam making generators and addition on (1)foam making generatior to an existing system. Date: August 19, 2008 Contractor: Fire Protection Industries Inc Client: Agusta Aviation Corp | Permit type: Suppression permit | Permit status: Completed | Completion date: July 16, 2009 | Permit id: 170078 | |||||
SCORE 96 Throughout office warehouse. Relocate horn strobes, add strobes, add duct detectors. Date: January 6, 2009 Contractor: Green Power Systems Client: Agusta Aviation Corp | Permit type: Electrical permit | Permit status: Expired | Completion date: January 6, 2009 | Permit id: 195072 | |||||
SCORE 96 Relocate horn strobes, add horn strobes, add (2) door holders, as per nfpa-72 (east dist) Date: June 4, 2009 Contractor: Green Power Systems Client: Agusta Aviation Corp | Permit type: Electrical permit | Permit status: Expired | Completion date: June 4, 2009 | Permit id: 196480 | |||||
SCORE 100 Install 6 catch basins & 4 rwcs, water to be reclaimed (washer bay accessory to helicopter facility) Date: January 30, 2012 Contractor: Albert J Sgro Mechanical Inc Client: Agusta Aviation Corp | Permit type: Plumbing permit | Permit status: Completed | Completion date: March 6, 2013 | Permit id: 382117 | |||||
SCORE 100 Install new sprinkler system to protect new paint booth addition Date: November 1, 2007 Contractor: Fire Protection Industries Inc Client: Agusta Aviation Corp | Permit type: Suppression permit | Permit status: Completed | Completion date: November 13, 2008 | Permit id: 106624 | |||||
SCORE 96 Installation of an approved b. A. Alarm system. According to nfpa 72 and local fire alarm codes and also card access. (east dist) Date: September 25, 2007 Contractor: Adt Security Svcs Client: Agusta Aviation Corp | Permit type: Electrical permit | Permit status: Completed | Completion date: June 28, 2008 | Permit id: 104471 | |||||
SCORE 100 2 17 08 - tents erected on site - caterer walkway restroom Date: February 11, 2008 Contractor: Knight Enterprises Inc Client: Agusta Aviation Corp | Permit type: Operations permit | Permit status: Completed | Permit id: 1788 | |||||
SCORE 100 Add (1)one indirect waste line for a hot water heater pan on the mezzanine level Date: May 6, 2008 Contractor: Tandem Associates Inc Client: Agusta Aviation Corp | Permit type: Plumbing permit | Permit status: Completed | Completion date: July 17, 2008 | Permit id: 150290 | |||||
SCORE 100 Add 1 kitchen sink 1st floor off existing. Add 1 kitchen sink to 2nd off existing. Add 1 bidet from existing. Date: October 17, 2007 Contractor: Tandem Associates Inc Client: Agusta Aviation Corp | Permit type: Plumbing permit | Permit status: Completed | Completion date: November 5, 2008 | Permit id: 109691 | |||||
Fast form building permit Date: January 21, 2008 Client: Agusta Aviation Corp | Permit status: Completed | Completion date: September 19, 2008 | Permit id: 127587 | |||||
SCORE 100 Install exhaust ductwork Date: May 28, 2008 Contractor: Accord Mechanical And Mgmt Svs Client: Agusta Aviation Corp | Permit type: Mechanical permit | Permit status: Completed | Completion date: June 24, 2009 | Permit id: 153490 | |||||
SCORE 99 Install: shell lighting and receptacles, (12)-2 tube additional 48" flourescent fixtures, (8)-2 light emergency fixtures, (8) duplex outlets, sump pump & overhead door wiring. In accordance with 2005 nec, in non-hazardous areas (east dist) Date: August 8, 2008 Contractor: Rcr Electrical Contractor Inc Client: Agusta Aviation Corp | Permit type: Electrical permit | Permit status: Completed | Completion date: February 17, 2011 | Permit id: 152830 | |||||
SCORE 85 Installation of new standing radar tower as per 2008 nec (east district) Date: September 19, 2017 Contractor: Mckeever Electrical Construc Client: Agusta Aviation Corp | Permit type: Electrical permit | Permit status: Active | Completion date: September 19, 2017 | Permit id: 808771 | |||||
SCORE 95 Hanger addition and interior renovation to existing building as per plans. Date: December 13, 2011 Contractor: Scungio Borst And Assoc Client: Agusta Aviation Corp | Permit type: Addition permit | Permit status: Completed | Completion date: March 1, 2013 | Permit id: 372530 | |||||
SCORE 95 Install crane hoist inside warehouse for movement of aircraft parts and equipment. . Date: November 8, 2011 Contractor: Milestone Construction Client: Agusta Aviation Corp | Permit type: Alteration permit | Permit status: Completed | Completion date: July 9, 2012 | Permit id: 347960 | |||||
SCORE 96 Install (2) lights on front sign, tie into existing exterior time clock as per 2008 nec (east dist) Date: October 5, 2011 Contractor: Stephan Dicks Client: Agusta Aviation Corp | Permit type: Electrical permit | Permit status: Completed | Completion date: November 30, 2011 | Permit id: 365043 | |||||
SCORE 100 New ductwork from existing rtu - intsallation of a new ductless split system for control room as per plans Date: November 6, 2014 Contractor: Elliott Lewis Corporation Client: Agusta Aviation Corp | Permit type: Mechanical permit | Permit status: Completed | Completion date: January 14, 2015 | Permit id: 566490 | |||||
SCORE 95 Office fit-out at helicopter assembly facility. Date: September 12, 2007 Contractor: Milestone Construction Client: Agusta Aviation Corp | Permit type: New construction permit | Permit status: Completed | Completion date: July 14, 2009 | Permit id: 91645 | |||||
SCORE 95 Erect paint booth addition as part of an existing helicopter assembly facility Date: November 28, 2007 Contractor: Milestone Construction Client: Agusta Aviation Corp | Permit type: New construction permit | Permit status: Completed | Completion date: July 14, 2009 | Permit id: 93310 | |||||
SCORE 100 Helicopter transmission test station bldg - install lighting, receptacles & general power as per nec 2008 (industrial bldg) Date: October 24, 2014 Contractor: Ray Angelini Inc Client: Agusta Aviation Corp | Permit type: Electrical permit | Permit status: Expired | Completion date: January 22, 2015 | Permit id: 568172 | |||||
SCORE 100 Install drain for kitchen sink (commercial) Date: October 17, 2012 Contractor: Terry Abrams Client: Agusta Aviation Corp | Permit type: Plumbing permit | Permit status: Completed | Completion date: October 30, 2012 | Permit id: 433097 | |||||
Temporary certificate of occupancy for the 3rd floor only Date: October 22, 2008 Client: Agusta Aviation Corp | Permit type: Administrative permit | Permit status: Completed | Completion date: October 29, 2008 | Permit id: 184158 | |||||
SCORE 56 No change in use an occupancy classification. Interior alterations to include structural work for the creation of a control room and mezzanine, stairs, load bearing wall, finishes, and all other work as per approved plans. Separate permit required for mechanical, electrical, plumbing and fire suppression work. Date: October 14, 2014 Contractor: Thomas Napoli Client: Agusta Aviation Corp | Permit type: Alteration permit | Permit status: Completed | Completion date: February 27, 2015 | Permit id: 565943 | |||||
SCORE 100 Install 4 rwcs & 3 catch basins, connect to existing on site storm water system, install 6 " sanitary to sanitary on site (aviation hanger) Date: January 30, 2012 Contractor: Albert J Sgro Mechanical Inc Client: Agusta Aviation Corp | Permit type: Plumbing permit | Permit status: Completed | Completion date: March 6, 2013 | Permit id: 382119 | |||||
SCORE 100 Installation of an automatic sprinkler system. Hangar area to be two closed head water foam system. Remainder of installation to be conventional fire sprinkler system. Date: February 27, 2012 Contractor: Fire Protection Industries Inc Client: Agusta Aviation Corp | Permit type: Suppression permit | Permit status: Completed | Completion date: March 6, 2013 | Permit id: 388137 | |||||
SCORE 99 Installation of additional lighting, recepts and services, to office and area not on original project as per 2005 nec (east district) Date: October 17, 2007 Contractor: Rcr Electrical Contractor Inc Client: Agusta Aviation Corp | Permit type: Electrical permit | Permit status: Completed | Completion date: November 26, 2007 | Permit id: 107172 | |||||
SCORE 100 Hvac as per plans Date: October 17, 2007 Contractor: Accord Mechanical And Mgmt Svs Client: Agusta Aviation Corp | Permit type: Mechanical permit | Permit status: Completed | Completion date: July 16, 2009 | Permit id: 108293 | |||||
SCORE 100 Connect water to private water line on site(ne airport) Date: April 18, 2012 Contractor: Albert J Sgro Mechanical Inc Client: Agusta Aviation Corp | Permit type: Plumbing permit | Permit status: Completed | Completion date: March 6, 2013 | Permit id: 399900 | |||||
SCORE 100 Installation of a new stand alone fire alarm system & new hangar as per 2008 nec and nfpa72 Date: June 7, 2012 Contractor: Armour And Sons Electric Inc Client: Agusta Aviation Corp | Permit type: Electrical permit | Permit status: Completed | Completion date: March 11, 2013 | Permit id: 401877 | |||||
SCORE 100 Install of customers 125kw ups and generator with transfer switch and panels per 2008 nec Date: August 2, 2012 Contractor: Rtm Electrical Contractors Client: Agusta Aviation Corp | Permit type: Electrical permit | Permit status: Expired | Completion date: August 2, 2012 | Permit id: 408350 | |||||
SCORE 95 Day t. C. O. Date: July 24, 2012 Contractor: Scungio Borst And Assoc Client: Agusta Aviation Corp | Permit type: Administrative permit | Permit status: Completed | Completion date: August 22, 2012 | Permit id: 418156 | |||||
SCORE 100 Install 111 cat6 cables to new communications cabinet. Install pair of telephone backbone cable and 12 stran fiber optic to existing computer room, to comply with articles 300. 21, 770. 3 & 8 of the 2008 nec. Date: September 20, 2012 Contractor: New Line Communications Inc Client: Agusta Aviation Corp | Permit type: Electrical permit | Permit status: Completed | Completion date: September 3, 2013 | Permit id: 426429 | |||||
SCORE 56 For the installation of a 110-0" high free-standing radar tower with a square footprint reinforced concrete (4,0 psi) mat foundation triple pier base for tower anchorage per engineers plan and details. Work also includes access ladder system and upper platform. All special inspection reports shall be furnished to department field inspector. Separate permits required for all electrical work (lighting). Installation shall comply with all applicable faa regulations and approvals Date: June 19, 2017 Contractor: United States Tower Serv Ltd Client: Agusta Aviation Corp | Permit type: New construction permit | Permit status: Active | Completion date: July 10, 2017 | Permit id: 768773 | |||||
SCORE 100 Install 1 cat 6 plenum cables to existing telecom rooms as per 2005 nec (east district) Date: November 7, 2008 Contractor: New Line Communications Inc Client: Agusta Aviation Corp | Permit type: Electrical permit | Permit status: Completed | Completion date: September 11, 2009 | Permit id: 182478 | |||||
SCORE 99 Installation of new fire alarm system in facility expansion Date: February 8, 2007 Contractor: Rcr Electrical Contractor Inc Client: Agusta Aviation Corp | Permit type: Electrical permit | Permit status: Completed | Completion date: February 27, 2008 | Permit id: 52119 | |||||
SCORE 85 Furnish and install (3)20ft lot light poles per 2008 nec (aviation center) Date: September 3, 2013 Contractor: Mckeever Electrical Construc Client: Agusta Aviation Corp | Permit type: Electrical permit | Permit status: Expired | Completion date: September 3, 2013 | Permit id: 492607 | |||||
SCORE 100 Install + - 5-0" of underground pipe to service new pipe sprinkler system. Installation of backflow preventer noy included. Date: March 2, 2007 Contractor: Fire Protection Industries Inc Client: Agusta Aviation Corp | Permit type: Suppression permit | Permit status: Completed | Completion date: August 18, 2008 | Permit id: 55588 | |||||
SCORE 100 Site storm water piping to new building, 3 rain water conductors, 4 yard drains, storm water management system Date: October 5, 2007 Contractor: John Uebele Jr Client: Agusta Aviation Corp | Permit type: Plumbing permit | Permit status: Completed | Completion date: December 27, 2007 | Permit id: 69937 | |||||
SCORE 100 Install new branch lines and seven (7) new heads to an existing fire suppression system in accordance with nfpa 13 under new platform and in new control room. Fire pump, backflow preventor and fire service all existing. All work shall comply with the approved plans. All work shall be performed by a fire suppression contractor licensed by the city of philadelphia. Date: November 12, 2014 Contractor: Fire Protection Industries Inc Client: Agusta Aviation Corp | Permit type: Suppression permit | Permit status: Completed | Completion date: January 14, 2015 | Permit id: 568736 | |||||
SCORE 100 Add toilet rooms: (4)water closets, (5)lavatories, (4)urinals, (2)floor drains and relocate existing hose bibbs Date: October 2, 2008 Contractor: Tandem Associates Inc Client: Agusta Aviation Corp | Permit type: Plumbing permit | Permit status: Completed | Completion date: January 28, 2009 | Permit id: 179386 | |||||
SCORE 100 Add toilet rooms to existing mezzanine: (7)lavatories, (1)mop receptor, (5)water closets and (2)urinals Date: October 2, 2008 Contractor: Tandem Associates Inc Client: Agusta Aviation Corp | Permit type: Plumbing permit | Permit status: Completed | Completion date: January 28, 2009 | Permit id: 179394 | |||||
Temporary certificate of occupancy for the paint booth only Date: October 22, 2008 Client: Agusta Aviation Corp | Permit type: Administrative permit | Permit status: Completed | Completion date: October 29, 2008 | Permit id: 184156 | |||||
SCORE 100 Relocation of (14) sprinkler heads Date: November 23, 2010 Contractor: Oliver Sprinkler Co Inc Client: Agusta Aviation Corp | Permit type: Suppression permit | Permit status: Completed | Completion date: October 26, 2011 | Permit id: 313291 | |||||
SCORE 100 Install 2 security cameras & cabling to security equipment, card access. Cctv & intercom. Date: November 5, 2010 Contractor: Adams Electrical Const Inc Client: Agusta Aviation Corp | Permit type: Electrical permit | Permit status: Expired | Completion date: November 5, 2010 | Permit id: 309853 | |||||
SCORE 100 Install (3) new parking lot light poles as per drawing mpe. 7 as prepared by mchugh engineering as per 2005 nec (east district) Date: November 12, 2009 Contractor: Carr And Duff Co Client: Agusta Aviation Corp | Permit type: Electrical permit | Permit status: Completed | Completion date: January 8, 2010 | Permit id: 244756 | |||||
SCORE 100 Install (324) cat6 data plenum cables to 162 locations as per 2005 nec articles 300. 21, 800. 113, 800. 133, 800. 154 & 800. 179. Date: August 12, 2009 Contractor: New Line Communications Inc Client: Agusta Aviation Corp | Permit type: Electrical permit | Permit status: Completed | Completion date: September 3, 2013 | Permit id: 231511 | |||||
SCORE 100 Tear off old roof and feplace with a new sarna fill roofing system Date: September 29, 2009 Contractor: United States Roofing Corp Client: Agusta Aviation Corp | Permit type: Alteration permit | Permit status: Completed | Completion date: March 31, 2010 | Permit id: 239288 | |||||
SCORE 99 Install 1 amp pump service to fuel farm, connect customer supplied equipment, as per 2005 nec (east dist) Date: April 28, 2009 Contractor: Rcr Electrical Contractor Inc Client: Agusta Aviation Corp | Permit type: Electrical permit | Permit status: Completed | Completion date: December 7, 2009 | Permit id: 206183 | |||||
SCORE 100 Install transformer, 3 40a circuits, 5 20a circuits & grounding. Date: April 13, 2009 Contractor: Mjk Electrical Corporation Client: Agusta Aviation Corp | Permit type: Electrical permit | Permit status: Expired | Completion date: April 13, 2009 | Permit id: 207466 | |||||
SCORE 100 10 31 10-erection of (1)-assembly use tent Date: November 12, 2010 Contractor: Knight Enterprises Inc Client: Agusta Aviation Corp | Permit type: Operations permit | Permit status: Completed | Permit id: 20797 | |||||
SCORE 100 Fast form building permit Date: May 1, 2009 Contractor: Fire Protection Industries Inc Client: Agusta Aviation Corp | Permit status: Completed | Completion date: August 9, 2009 | Permit id: 213472 | |||||
SCORE 100 Install 17 new sprinkler heads and associated piping within the first and second floor lobby area and new sprinkler heads and associated piping within the mezzanine area, connecting into the existing sprinkler system as per plans. Date: May 18, 2009 Contractor: Fire Protection Industries Inc Client: Agusta Aviation Corp | Permit type: Suppression permit | Permit status: Completed | Completion date: August 10, 2009 | Permit id: 213975 | |||||
SCORE 100 Interior demo of non-bearing partitions. Date: May 13, 2009 Contractor: Cippco Contracting Inc Client: Agusta Aviation Corp | Permit type: Demolition permit | Permit status: Completed | Completion date: August 10, 2009 | Permit id: 215444 | |||||
SCORE 100 Replacement of 2nd fl light fixtures, switches, mechanical equipment with more efficient fixtures, occupancy sensors and hvac equipment, additional, added 12 recepts to 3 existing spare circuits as per 2005 nec (east district) Date: May 19, 2009 Contractor: Gordon Group Electric Client: Agusta Aviation Corp | Permit type: Electrical permit | Permit status: Completed | Completion date: August 20, 2016 | Permit id: 216509 | |||||
SCORE 100 New hvac system as per plans Date: June 3, 2009 Contractor: Edward B Oreilly And Assoc Inc Client: Agusta Aviation Corp | Permit type: Mechanical permit | Permit status: Completed | Completion date: August 10, 2009 | Permit id: 218297 | |||||
SCORE 100 Replacement of 1st fl light fixtures,switches mechanical equip with more efficient fixtures, occupancy sensors and hvac equip. Additionally added 16 receptacles to 4 existing space circuits, as per 2005 nec (east dist) Date: June 1, 2009 Contractor: Gordon Group Electric Client: Agusta Aviation Corp | Permit type: Electrical permit | Permit status: Completed | Completion date: August 20, 2016 | Permit id: 218513 | |||||
SCORE 100 Install one (1) additional manual pull station at each of the four (4) exterior doors in the flight line area as per nfpa-72 Date: August 15, 2011 Contractor: Adams Electrical Const Inc Client: Agusta Aviation Corp | Permit type: Electrical permit | Permit status: Expired | Completion date: August 15, 2011 | Permit id: 342216 | |||||
SCORE 100 Install roof membrance Date: August 5, 2011 Contractor: Eda Roofing Corporation Client: Agusta Aviation Corp | Permit type: Alteration permit | Permit status: Completed | Completion date: February 3, 2012 | Permit id: 343413 | |||||
SCORE 100 Install category 6 plenum rated data cables as per 2008 nec Date: October 22, 2010 Contractor: New Line Communications Inc Client: Agusta Aviation Corp | Permit type: Electrical permit | Permit status: Completed | Completion date: September 19, 2011 | Permit id: 307936 | |||||
SCORE 59 Permit to erect 5 ground signs as per plans. Separate permit required for flat wall and channel letter signs. Date: February 25, 2011 Contractor: Allied Environment Llc Client: Agusta Aviation Corp | Permit type: Sign permit | Permit status: Completed | Completion date: April 23, 2012 | Permit id: 308002 | |||||
SCORE 59 Install signs per plans & relocate two signs Date: March 3, 2011 Contractor: Allied Environment Llc Client: Agusta Aviation Corp | Permit type: Sign permit | Permit status: Completed | Completion date: May 8, 2012 | Permit id: 327778 | |||||
SCORE 88 Reconfigure existing office space re-using existing circuits & adding new circuits to existing panels, wire power and lights according to 2008 nec. Fire alarm system as per nfpa-72 (east dist) Date: June 30, 2010 Contractor: Edmond J Lovell, Jr Client: Agusta Aviation Corp | Permit type: Electrical permit | Permit status: Expired | Completion date: June 30, 2010 | Permit id: 261628 | |||||
SCORE 100 Site work Date: February 25, 2009 Contractor: Terry Abrams Client: Agusta Aviation Corp | Permit type: Plumbing permit | Permit status: Completed | Completion date: May 20, 2009 | Permit id: 202073 | |||||
Erection of two second story additions, under existing roofline, for use as accessory classrooms for training of employees and customers; erection of a one story security office structure with canopy on 30 red lion (maximum 23 high), canopy to extend over a portion of 9901 red lion rd(gate 17 access rd and a portion of 3076 red lion rd. And erection of an 8 high fence, size & location as shown in the application. Conversion of a portion of the existing accessory warehouse to accessory offices, as part of an existing helicopter assembly manufacturer with accessory warehouse, accessory offices and accessory training for employees and customers only with 198 accessory parking spaces on this lot and three accessory loading spaces Date: July 7, 2009 Client: Agusta Aviation Corp | Permit type: Zoning/use permit | Permit status: Completed | Completion date: July 7, 2009 | Permit id: 201093 | |||||
SCORE 100 Install 4 cat 6, plenum cables from ex lan rooms avg cable length is 1 feet, install telephone 1 pair and fiber optic backbone cables, as per 2008 nec (east dist) Date: June 16, 2010 Contractor: New Line Communications Inc Client: Agusta Aviation Corp | Permit type: Electrical permit | Permit status: Completed | Completion date: September 3, 2013 | Permit id: 278356 | |||||
SCORE 100 Hvac system as per plans Date: February 18, 2010 Contractor: Edward B Oreilly And Assoc Inc Client: Agusta Aviation Corp | Permit type: Mechanical permit | Permit status: Completed | Completion date: February 3, 2012 | Permit id: 261006 | |||||
SCORE 88 Install power, lighting according to 2005 nec (east dist) Date: April 5, 2011 Contractor: Edmond J Lovell, Jr Client: Agusta Aviation Corp | Permit type: Electrical permit | Permit status: Expired | Completion date: April 5, 2011 | Permit id: 260269 | |||||
SCORE 93 Installation of water pipe to fixtures, waste pipe to fixtures, waste pipe to roof drains,all going to existing services out from building, 1-wc,1-lav,4 roof drains Date: January 25, 2010 Contractor: Indoor Quality Solutions Inc Client: Agusta Aviation Corp | Permit type: Plumbing permit | Permit status: Completed | Completion date: January 27, 2012 | Permit id: 258595 | |||||
SCORE 93 Hvac ductwork per plan for guard shack at airport Date: February 25, 2010 Contractor: Indoor Quality Solutions Inc Client: Agusta Aviation Corp | Permit type: Mechanical permit | Permit status: Completed | Completion date: December 19, 2011 | Permit id: 258788 | |||||
SCORE 100 Site work relocate 36" storm drain and catch basins,install 5 new cat basins and rwc,19 total fixtues Date: February 1, 2010 Contractor: Albert J Sgro Mechanical Inc Client: Agusta Aviation Corp | Permit type: Plumbing permit | Permit status: Completed | Completion date: November 2, 2011 | Permit id: 259964 | |||||
SCORE 93 24 fixtures with piping,8wc,4ur,9lavs,1ks,1mopr,1ewc,1water heater Date: February 16, 2010 Contractor: Indoor Quality Solutions Inc Client: Agusta Aviation Corp | Permit type: Plumbing permit | Permit status: Completed | Completion date: November 9, 2011 | Permit id: 260051 | |||||
SCORE 100 Install 169 fire sprinklers heads as per plans Date: March 23, 2010 Contractor: Oliver Sprinkler Co Inc Client: Agusta Aviation Corp | Permit type: Suppression permit | Permit status: Completed | Completion date: October 19, 2011 | Permit id: 262431 |