Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
New construction permit Date: August 11, 2014 Client: Philadelphia Energy Solut | Permit status: Completed | Permit id: 551901 | |||||
Alteration permit Date: August 15, 2014 Client: Philadelphia Energy Solut | Permit status: Expired | Permit id: 550800 | |||||
Plumbing permit Date: October 27, 2014 Client: Philadelphia Energy Solut | Permit status: Completed | Permit id: 570351 | |||||
Zoning use permit Date: June 27, 2013 Client: Philadelphia Energy Solut | Permit status: Completed | Permit id: 478474 | |||||
New construction permit Date: April 26, 2013 Client: Philadelphia Energy Solut | Permit status: Completed | Permit id: 462585 | |||||
Administrative permit Date: April 15, 2015 Client: Philadelphia Energy Solut | Permit status: Completed | Permit id: 593002 | |||||
Mechanical permit Date: September 19, 2014 Client: Philadelphia Energy Solut | Permit status: Completed | Permit id: 561272 | |||||
Zoning use permit Date: September 25, 2014 Client: Philadelphia Energy Solut | Permit status: Completed | Permit id: 562111 | |||||
Zoning use permit Date: April 2, 2015 Client: Philadelphia Energy Solut | Permit status: Completed | Permit id: 591925 | |||||
Zoning permit Date: February 11, 2015 Client: Philadelphia Energy Solut | Permit status: Completed | Permit id: 589912 | |||||
Addition permit Date: September 4, 2014 Client: Philadelphia Energy Solut | Permit status: Completed | Permit id: 558334 | |||||
Addition permit Date: June 28, 2013 Client: Philadelphia Energy Solut | Permit status: Expired | Permit id: 478475 | |||||
New construction permit Date: June 12, 2015 Client: Philadelphia Energy Solut | Permit status: Active | Permit id: 609373 | |||||
For the erection of a pre-manufactured, one-story guard shed (64 sf) & a portable truck weighing scale with accessory support trailer. Date: June 28, 2013 Client: Philadelphia Energy Solut | Permit type: Addition permit | Permit status: Expired | Completion date: January 20, 2016 | Permit id: 478475 | |||||
Grading site work permit only. Excavation grading of the site for girard point - butane terminal - phase 1 site preparation, as noted in the attached earthwork package of plans. Phase 1 to include; the removal of existing access roads, removal and abandonment of existing drainage structures, removal of existing tank pads, and excavation and embankment work for rails. Work shall include, but not be limited to, excavation, removal of existing surface and subsurface features, and installation of erosion and sedimentation controls, pursuant to the approved dep e&s plans. No buildings structures on this application. Date: April 17, 2014 Client: Philadelphia Energy Solut | Permit type: New construction permit | Permit status: Completed | Completion date: August 4, 2015 | Permit id: 529687 | |||||
Work pertains to sitework only, to provide track crossing and roadway to new butane rail terminal to access existing equipment. Proposed work accessory existing intensive industrial use on lot. All work to be done per approved plans and sealed details. If field conditions vary contact structural engineer prior to the start of any work. Separate permits required for all other work. Date: November 10, 2014 Client: Philadelphia Energy Solut | Permit type: Alteration permit | Permit status: Completed | Completion date: September 16, 2015 | Permit id: 569926 | |||||
For level ii interior alterations to provide new exterior waterproofing, masonry wall infill, sill lintel replacement, roof covering and deck replacement. Work also to include interior finishes and furniture. All asbestos to be treated removed prior to commencement of work. Date: August 15, 2014 Client: Philadelphia Energy Solut | Permit type: Alteration permit | Permit status: Expired | Completion date: June 5, 2015 | Permit id: 550800 | |||||
Remove the existing below grade foundations and backfill as per plans. Date: August 28, 2014 Client: Philadelphia Energy Solut | Permit type: Alteration permit | Permit status: Completed | Completion date: December 15, 2015 | Permit id: 554879 | |||||
For the erection of new pipe line supports and for the modification of existing pipe line supports with the installation of support piers and pipe racks with below grade foundations and for the erection of a concrete equipment pad. Size and location as shown in application plans. Structure accessory to an existing intensive industrial use. Total earth disturbance to be less than 5,0 square feet. Date: May 29, 2014 Client: Philadelphia Energy Solut | Permit type: Zoning/use permit | Permit status: Completed | Completion date: May 29, 2014 | Permit id: 538379 | |||||
Asbestos removal abatement required prior to the commencement of any work. For level ii alterations to an existing building for the use of an office for extensive industrial use. Alterations to include the demolition erection of partition walls, provide finishes and furnishings throughout. All work to be done per approved plans. If field conditions vary contact structural engineer prior to the start of any work. Separate permits required for all other work. Date: September 19, 2014 Client: Philadelphia Energy Solut | Permit type: Alteration permit | Permit status: Completed | Completion date: May 18, 2015 | Permit id: 560056 | |||||
For level ii alterations to existing mechanical system, alteration to include the installation of registers, diffuser and mechanical equipment with associated ductwork. All work to be done per approved plans. If field conditions cary contact design engineer prior to the start of any work. Separate permits required for electrical and plumbing work. Date: September 19, 2014 Client: Philadelphia Energy Solut | Permit type: Mechanical permit | Permit status: Completed | Completion date: March 30, 2015 | Permit id: 561272 | |||||
For the demolition of existing foundations and installation of a boiler, mat foundations, utility pads, remote instrument enclosure, cable tray supports, transformers, and pole supports for steam line. No change in height or area of exisitng structures. For use as intensive industrial as previously approved. Date: September 25, 2014 Client: Philadelphia Energy Solut | Permit type: Zoning/use permit | Permit status: Completed | Completion date: September 25, 2014 | Permit id: 562111 | |||||
For the erection of two- one story buildings for flare monitoring purposes accessory to intensive industrial use on the lot and for modification to existing flare stack structures, and for the erection of building for the use of equipment. All work to be done per approved plans, construction to include concrete foundations, bollards and structural steel reinforcement. If field conditions vary contact structural engineer prior to the start of any work. Separate permits required for all other work. Date: June 12, 2015 Client: Philadelphia Energy Solut | Permit type: New construction permit | Permit status: Completed | Completion date: September 12, 2017 | Permit id: 609373 | |||||
Additon of a guard shed and trailer (both portable). Date: June 27, 2013 Client: Philadelphia Energy Solut | Permit type: Zoning/use permit | Permit status: Completed | Completion date: June 27, 2013 | Permit id: 478474 | |||||
For the erection of a structure for proposed boiler no. 45 relocation project, all work accessory to an existing intensive industrial use on the propoerty. Refer to ap#559967 for approved foundation permit and documenation. All work to be done per approved plans, if field conditions vary contact structural engineer prior to the start of any work. Separate permits required for all other work. Date: November 24, 2014 Client: Philadelphia Energy Solut | Permit type: New construction permit | Permit status: Completed | Completion date: July 30, 2015 | Permit id: 571594 | |||||
SCORE 100 Remove existing 2 fixtures and replace same. Add 1 toilet,2 lavs,1 shower and a water cooler (oil refinery) Date: October 27, 2014 Contractor: J J White Inc Client: Philadelphia Energy Solut | Permit type: Plumbing permit | Permit status: Completed | Completion date: March 30, 2015 | Permit id: 570351 | |||||
Installing flare monitoring. Date: April 2, 2015 Client: Philadelphia Energy Solut | Permit type: Zoning/use permit | Permit status: Completed | Completion date: April 2, 2015 | Permit id: 593538 | |||||
For the erection of a one story building for ambient air monitoring purposes accessory to intensive industial use on the lot. Work to include the construction of a high steel frame meteorlofical tower (weather station), concrete pad, and bollards. All work to be done per approved plans. If field conditions vary contact structural engineer prior to the start of any work. Separate permits required for all other work. Date: May 4, 2015 Client: Philadelphia Energy Solut | Permit type: New construction permit | Permit status: Expired | Completion date: November 7, 2017 | Permit id: 600923 | |||||
Install a pre manufactured preengineered one story shelter building approx 8 x ft for ambient air monitoring purposes. Installation includes construction of perimeter concrete pad and bollards and a 35 high steel-frame meteorological tower (weather station) no change in any existing guildings height, bulk or use. No change in accessory parking or signage. Date: April 2, 2015 Client: Philadelphia Energy Solut | Permit type: Zoning/use permit | Permit status: Completed | Completion date: April 2, 2015 | Permit id: 591925 | |||||
For the erection of pipeline foundations approximately 3,5 linear feet of above ground pipeline with supports for the transportation of crude oil, (size and location as shown in plans). For pipeline accessory to an existing crude oil transportation to oil refinery. Date: April 10, 2013 Client: Philadelphia Energy Solut | Permit type: Zoning/use permit | Permit status: Completed | Completion date: April 19, 2013 | Permit id: 462592 | |||||
For the erection of a reinforced concrete drilled shaft footing shallow foundation system to support future above grade steel framing & future above-ground pipeline. Earth disturbance not to exceed 5,0 sqft. Date: April 26, 2013 Client: Philadelphia Energy Solut | Permit type: New construction permit | Permit status: Completed | Completion date: February 19, 2015 | Permit id: 462585 | |||||
For the erection of a storage building, detached structures and a various equipment and piping. Size and location as shown on plans application. For use as intensive industrial as previously approved. Date: July 7, 2014 Client: Philadelphia Energy Solut | Permit type: Zoning/use permit | Permit status: Completed | Completion date: July 7, 2014 | Permit id: 546189 | |||||
For the construction of subsurface foundations and support piers for two(2) 805 ft long and 5 ft wide railcar unloading platforms and for the erection of pipe rack foundations and a transformer pad. The unloading platform and catwalk systems will located approximatley feet above grade. All work accessory to an existi ng intensive industrial use. All connection details to be done per approved plans, if field condition vary contact structural engineer prior to the start of any work. Date: July 17, 2014 Client: Philadelphia Energy Solut | Permit type: New construction permit | Permit status: Completed | Completion date: September 16, 2015 | Permit id: 547587 | |||||
For the relocation of 5 linear feet of existing pipeline, installation of below grade foundation, support piers, and pipe racks. Concrete piers will extend a few feet above grade and the top of the pipe racks will be about ft above grade to allow for passage of rail cars below them. Structures accessory to an existing intensive industrial use. Date: May 29, 2014 Client: Philadelphia Energy Solut | Permit type: Zoning/use permit | Permit status: Completed | Completion date: May 29, 2014 | Permit id: 534801 | |||||
For level ii alterations to an existing building for the use of offices, storage,and locker rooms accessory to existing intensive industrial use. Alterations to include the removal erection of partition walls, infill of openings in exterior walls, alterations to existing roof assembly for proposed mechanical equipment and provide furnishings throuhout. All work to be done per approved plans. If field conditions vary contact structural engineer prior to the start of any work. Separate permits required for all other work. Date: October 22, 2014 Client: Philadelphia Energy Solut | Permit type: Alteration permit | Permit status: Completed | Completion date: March 30, 2015 | Permit id: 567533 | |||||
For the erection of two rail car unloading platforms constructed of structural steel. All connection details and specifications to be done in accordance with the plans. If field conditions vary contact structural engineer prior to the start of any work. Please refer to ap#547587 foundation work. Separate permits required for all other work. Date: August 11, 2014 Client: Philadelphia Energy Solut | Permit type: New construction permit | Permit status: Completed | Completion date: September 16, 2015 | Permit id: 551901 | |||||
For the relocation of 5 linear feet of existing pipeline, with the installation of support piers and pipe racks with below grade foundations; pipe rack to be located approximatley ft above grade level. Pipe line accessory to an existing intensive industrial use. All connection details to be done per approved plans, if field condition vary contact structural engineer prior to the start of any work. Date: May 29, 2014 Client: Philadelphia Energy Solut | Permit type: New construction permit | Permit status: Completed | Completion date: August 4, 2015 | Permit id: 534874 | |||||
For the amendment of previously approved permit #5688 to document the change of location and alterations to previously approved layout. Original application approved for level ii alterations to existing mechanical system, alteration to include the installation of mechanical equipment with associated ductwork. All work to be done per approved plans. If field conditions vary contact design engineer prior to the start of any work. Separate permits required for electrical and plumbing work. Date: April 15, 2015 Client: Philadelphia Energy Solut | Permit type: Administrative permit | Permit status: Completed | Completion date: July 30, 2015 | Permit id: 593002 | |||||
For the lot adjustment to create eight (8) lots (lots 1 through 8) from five (5) deeded lots (36 lanier avenue, 30 penrose ferry road, 3002 penrose ferry road, 3404 penrose avenue, 3144 passyunk avenue)with five opa accounts. Size and location as shown per application plan. Please see ap#576397 for approved plans. Date: February 11, 2015 Client: Philadelphia Energy Solut | Permit type: Zoning permit | Permit status: Completed | Completion date: February 11, 2015 | Permit id: 589912 | |||||
For level ii alterations to existing mechanical system, alteration to include the installation of mechanical equipment with associated ductwork. All work to be done per approved plans. If field conditions vary contact design engineer prior to the start of any work. Separate permits required for electrical and plumbing work. Date: October 22, 2014 Client: Philadelphia Energy Solut | Permit type: Mechanical permit | Permit status: Completed | Completion date: March 30, 2015 | Permit id: 568850 | |||||
SCORE 56 The construction of building and equipment foundations, and the installation of a pdc equipment building and miscellaneous pipe bridge crash walls. Date: July 28, 2014 Contractor: H T Sweeney And Son Inc Client: Philadelphia Energy Solut | Permit type: New construction permit | Permit status: Completed | Completion date: August 4, 2015 | Permit id: 550327 | |||||
For the erection of a concrete foundation and the installation of a prefabricated structure as shown in approved plans. Date: September 4, 2014 Client: Philadelphia Energy Solut | Permit type: Addition permit | Permit status: Completed | Completion date: July 30, 2015 | Permit id: 558334 | |||||
For the construction of foundations for proposed boiler no. 45 relocation project, all work accessory to an existing intensive industrial use on the property. All work to be done per approved plans, if field conditions vary contact structural engineer prior to the start of any work. Separate permits required for all other work. Date: October 17, 2014 Client: Philadelphia Energy Solut | Permit type: New construction permit | Permit status: Completed | Completion date: August 4, 2015 | Permit id: 559967 | |||||
For the installation of new pipeline supports with the installation of support piers and pipe racks with below grade foundations and for the upgrade of existing refinery pipeline supports and for the erection of a concrete equipment pad. Size and location as shown in application plans. Pipe line accessory to an existing intensive industrial use. All connection details to be done per approved plans, if field condition vary contact structural engineer prior to the start of any work. Date: June 2, 2014 Client: Philadelphia Energy Solut | Permit type: New construction permit | Permit status: Completed | Completion date: September 23, 2015 | Permit id: 538361 |