Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 86 U and minor t. I. For houzz: replace mechanical plenum above t-bar: create new soffits to accommodate new plenum size. Permit status: Permit issued | Permit id: 14000-00036 | |||||
SCORE 95 Commercial ti (100sf) construction of (n) consultation room Permit status: Permit issued | Permit id: 13000-02145 | |||||
SCORE 95 Walgreens: remodel for (e) tenant ~250sf, includes split existing consultation into (2) rooms. Associated electrical mechanical. Permit status: Permit issued | Permit id: 13000-01998 | |||||
SCORE 96 Tenant improvement for "apple" includes replacement of door and associated wall with sound barrier. Date: March 27, 2013 Contractor: Dpr Construction A General Partnership Permit status: Permit issued | Permit id: 13000-00846 | |||||
SCORE 96 11000-00675: deferred submittal for movable shelving Date: September 18, 2012 Contractor: Dpr Construction A General Partnership Permit status: Permit issued | Permit id: 12rev-00521 | |||||
SCORE 96 11-675: delta 13: add an interior door to the trash room Date: September 11, 2012 Contractor: Dpr Construction A General Partnership Permit status: Permit issued | Permit id: 12rev-00506 | |||||
SCORE 96 11-675: revision to roof structure for roof top unit curbs; revise electrical room Date: August 15, 2012 Contractor: Dpr Construction A General Partnership Permit status: Permit issued | Permit id: 12rev-00456 | |||||
SCORE 96 11-675: elastomeric paint coating (see attached spec sheet w comments) Date: August 9, 2012 Contractor: Dpr Construction A General Partnership Permit status: Permit issued | Permit id: 12rev-00442 | |||||
SCORE 96 11-675: deferred submittal for signage Date: August 3, 2012 Contractor: Dpr Construction A General Partnership Permit status: Permit issued | Permit id: 12rev-00428 | |||||
SCORE 96 11000-00675: permit revision (10) - change both start up bays to software shelving - relocate a vestibule door. Date: July 31, 2012 Contractor: Dpr Construction A General Partnership Permit status: Permit issued | Permit id: 12rev-00419 | |||||
SCORE 96 11-675: deferred installation details for 3" dimensional stone. Date: July 2, 2012 Contractor: Dpr Construction A General Partnership Permit status: Permit issued | Permit id: 12rev-00370 | |||||
SCORE 96 11-675: metal framing shops calcs Date: June 18, 2012 Contractor: Dpr Construction A General Partnership Permit status: Permit issued | Permit id: 12rev-00329 | |||||
SCORE 96 11-675: deferred submittal for roof top unit achorage - calcs and details. Date: June 25, 2012 Contractor: Dpr Construction A General Partnership Permit status: Permit issued | Permit id: 12rev-00351 | |||||
SCORE 96 11000-00675: deferred submittal for the elevator cab and details Date: June 22, 2012 Contractor: Dpr Construction A General Partnership Permit status: Permit issued | Permit id: 12rev-00346 | |||||
SCORE 96 11-675: stone grid system shops calcs Date: June 18, 2012 Contractor: Dpr Construction A General Partnership Permit status: Permit issued | Permit id: 12rev-00330 | |||||
SCORE 96 11-675: defered submittal for steel stair shop drawings Date: June 12, 2012 Contractor: Dpr Construction A General Partnership Permit status: Permit issued | Permit id: 12rev-00321 | |||||
SCORE 96 11-675: back of house layout; revised mep layout to resolve conflicts; drainage, day-lighting out of side of building; added stone @ private alley; gas line routed to north side of building. Date: May 22, 2012 Contractor: Dpr Construction A General Partnership Permit status: Permit issued | Permit id: 12rev-00274 | |||||
SCORE 96 11-675. Back of house detail clarifications and finish specifications. Date: February 2, 2012 Contractor: Dpr Construction A General Partnership Permit status: Permit issued | Permit id: 12rev-00061 | |||||
SCORE 96 Houzz 2nd floor: remodel for (e) tenant. Scope of work includes creating non-accessibile toilet to (e) restroom. Permit status: Permit issued | Permit id: 15000-00746 | |||||
SCORE 100 Jp morgan chase: adding 4 (n) circuits to power set of cubicles Date: October 18, 2017 Contractor: Benson And Son Electric Permit status: Permit issued | Permit id: 17000-02493 | |||||
SCORE 93 Ti for existing tenant "jp morgan chase " 2nd floor interior remodel. Scope of work includes non structural partitions, changes to suspended ceiling, hvac, and electrical. No exterior changes. Permit status: Finaled | Permit id: 16000-01201 | |||||
SCORE 59 Ti and u&o for new tenant "at&t authorized retailer" to occupy ground floor. Interior remodel (3334 sf) Date: May 23, 2016 Contractor: Constructive Building Services Inc Permit status: Finaled | Permit id: 16000-01249 | |||||
SCORE 65 U&o and tenant improvement 1500sf for new restaurant "bangkok thai restaurant". Includes new bar and kitchen layout and restroom layout. U&o sent 3 23 16 Date: September 4, 2015 Contractor: Jachin Construction Inc Permit status: Finaled | Permit id: 15000-02362 | |||||
SCORE 59 Apple: repair damaged storefront like for like Permit status: Permit issued | Permit id: 16000-03080 | |||||
SCORE 96 Replace tile landing with new concrete landing Permit status: Permit issued | Permit id: 16000-01535 | |||||
SCORE 99 Electrical for two illuminated wall signs 16pln-00295 Date: October 12, 2016 Contractor: City Signs Permit status: Expired | Permit id: 16000-02542 |