Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 70 Install new kitchen and bathroom Date: March 7, 2007 Contractor: Flow Temp Construction Inc Client: Yue Li Zhang Xiaohui | Permit type: Plumbing permit | Permit status: Completed | Completion date: May 14, 2007 | Permit id: 60546 | |||||
SCORE 70 15 recepts and lights Date: March 7, 2007 Contractor: Flow Temp Construction Inc Client: Yue Li Zhang Xiaohui | Permit type: Electrical permit | Permit status: Completed | Completion date: January 14, 2008 | Permit id: 60535 | |||||
Converting the rear section of th 1st fl. And the basement by adding 2 walls, 2 doors, and a powder room to the 1st fl. And a kitchen and bathroom to the basement as per plans for new apartment on basement 1st floor. Co for new apt. Only Date: February 22, 2007 Client: Yue Li Zhang Xiaohui | Permit type: Alteration permit | Permit status: Completed | Completion date: November 14, 2007 | Permit id: 45686 | |||||
Install 13" square plates on east and west facade with rods through building below third floor level. Repoint areas where mortor is deteriorated as per plans Date: February 28, 2008 Client: Yue Li Zhang Xiaohui | Permit type: Alteration permit | Permit status: Completed | Completion date: July 3, 2008 | Permit id: 125338 | |||||
SCORE 100 North and side elevations. Repair or replace all cracked and or spalled brick. Remove loose deterioated mortar joints and repoint with mortar to match existing. Mortar mix to be 6 parts sand, 2 parts lime and 1 part portland cement. All samples to be approved by philadelphia historic commision. Contact streets department for dumpster permit and footway closure permits. Date: November 21, 2013 Contractor: Wm.Proud Masonry Restoration Client: Chateauvert Lindsay M | Permit type: Alteration permit | Permit status: Completed | Completion date: June 16, 2014 | Permit id: 503816 |