Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 93 S+h construction will be refinishing the basement floor, adding a bathroom and tv room at the lower level of the unit. Installing hvac work at basement level, and installing replacement windows at basement for energy efficiency. Permit type: Addition/alteration | Completion date: December 11, 2015 | Current use: Two-family | Parcel: 210523 | |||||
SCORE 93 S+h construction will be refinishing the basement floor, adding a bathroom and tv room at the lower level of the unit. Installing hvac work at basement level, and installing replacement windows at basement for energy efficiency. Permit type: Addition/alteration | Completion date: December 11, 2015 | Current use: Two-family | Permit id: 0 | Parcel: 210523 |