Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Ramirez mobile home ![]() Permit status: Closed | Permit id: 09-01952 | |||||
SCORE 95 Ramirez mobile home Client: Ramirez Mobile Home | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 09-01952 | Parcel: 5883 | |||||
SCORE 84 Ramirez mobile home Client: Ramirez Mobile Home | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 09-01952 | Parcel: 5883 | |||||
April 28, 2009 3:44: pm alisam. Ramirez mobile home lot 286 - relocation of used mobile home to lot 286;aml airport rd to wellington follow to dover #286; june 9, 2009 3:43:44 pm alisam. Ramirez mobile home lot 286 - relocation of used mobile home to lot 286;aml; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing larger than 5 square feet requires separate deck permit. Building "final" includes water/waste line hook-ups. It Permit type: Permits - historical | Permit status: Closed | Permit id: 09-01952 | Parcel: 5883 | |||||
Ramirez mobile home ![]() ![]() Permit type: Historical | Permit status: Closed | Permit id: 09-01952 | |||||
April 28, 2009 3:44: pm alisam. Ramirez mobile home lot 286 - relocation of used mobile home to lot 286;aml airport rd to wellington follow to dover #286; june 9, 2009 3:43:44 pm alisam. Ramirez mobile home lot 286 - relocation of used mobile home to lot 286;aml; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing larger than 5 square feet requires separate deck permit. Building "final" includes water waste line hook-ups. It ![]() Permit type: Permits - historical | Permit status: Closed | Permit id: 09-01952 | Parcel: 5883 |